LR-N07-0061, Application to Revise Technical Specifications (LCR H07-01) Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process17 April 2007Application to Revise Technical Specifications (LCR H07-01) Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process
LR-N08-0071, License Amendment Request - Hydrogen Water Chemistry Low Power Restriction25 April 2008License Amendment Request - Hydrogen Water Chemistry Low Power Restriction
LR-N09-0002, Request for Change to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process (Cliip), TSTF-3595 January 2009Request for Change to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process (Cliip), TSTF-359
LR-N10-0015, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program19 March 2010Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program
LR-N10-0355, Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)14 October 2010Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)
LR-N10-0355, Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version)14 October 2010Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version)
LR-N10-0355, Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix14 October 2010Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix
LR-N10-0355, EP-SC-1 11-200, Salem, Event Classification Guide, Emergency Action Level Technical Bases.30 July 2010EP-SC-1 11-200, Salem, Event Classification Guide, Emergency Action Level Technical Bases.
LR-N10-0355, EP-SC-111-200, Salem, Event Classification Guide Emergency Action Level Technical Bases.30 July 2010EP-SC-111-200, Salem, Event Classification Guide Emergency Action Level Technical Bases.
LR-N10-0355, Hope Creek, Bases Figure B 3/4 3-1, Reactor Vessel Water Level.14 October 2010Hope Creek, Bases Figure B 3/4 3-1, Reactor Vessel Water Level.
LR-N10-0355, Hope Creek, HC.OP-IO.ZZ-0005(Q), Rev. 30, Cold Shutdown to Refueling.25 April 2009Hope Creek, HC.OP-IO.ZZ-0005(Q), Rev. 30, Cold Shutdown to Refueling.
LR-N10-0355, Hope Creek, HC.OP-SO.BC-0002(Q), Rev. 25, Decay Heat Removal Operation.1 October 2010Hope Creek, HC.OP-SO.BC-0002(Q), Rev. 25, Decay Heat Removal Operation.
LR-N10-0355, Salem, EAL Comparison Matrix12 August 2010Salem, EAL Comparison Matrix
LR-N11-0002, Supplement to License Amendment Request H10-01, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee.10 January 2011Supplement to License Amendment Request H10-01, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee.
LR-N11-0068, Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process28 February 2011Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process
LR-N11-0098, Format and Editorial Corrections to Technical Specification Pages Issued with Amendment 1874 April 2011Format and Editorial Corrections to Technical Specification Pages Issued with Amendment 187
LR-N11-0217, Response to Requests for Additional Information (Rais) for Emergency Action Level Changes14 July 2011Response to Requests for Additional Information (Rais) for Emergency Action Level Changes
LR-N12-0067, License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items1 March 2012License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items
LR-N16-0066, License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling17 June 2016License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling
LR-N16-0092, Supplemental Information - License Amendment Request - Digital Power Range Neutron Monitoring (Prnm) System Upgrade17 June 2016Supplemental Information - License Amendment Request - Digital Power Range Neutron Monitoring (Prnm) System Upgrade
LR-N16-0231, Response to Request for Additional Information, License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling27 December 2016Response to Request for Additional Information, License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling
LR-N17-0032, License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report27 March 2017License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report
LR-N17-0088, Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 1, Introduction and General Description of Plant9 May 2017Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 1, Introduction and General Description of Plant
LR-N17-0088, Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 14, Initial Test Program9 May 2017Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 14, Initial Test Program
LR-N17-0088, Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 15, Accident Analyses9 May 2017Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 15, Accident Analyses
LR-N17-0088, Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 5, Reactor Coolant System and Connected Systems9 May 2017Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 5, Reactor Coolant System and Connected Systems
LR-N17-0088, Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 7, Instrumentation and Controls9 May 2017Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 7, Instrumentation and Controls
LR-N17-0088, Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 6, Engineered Safety Features9 May 2017Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 6, Engineered Safety Features
LR-N17-0124, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control21 September 2017Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control
LR-N17-0125, Response to Request for Additional Information Regarding Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors11 August 2017Response to Request for Additional Information Regarding Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors
LR-N18-0061, Response to Request for Additional Information, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.27 June 2018Response to Request for Additional Information, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.
LR-N18-0073, Supplement to License Amendment Request for Additional Information, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.19 July 2018Supplement to License Amendment Request for Additional Information, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.
LR-N20-0033, Submittal of Hope Creek Generating Station Technical Specification Bases Changes15 May 2020Submittal of Hope Creek Generating Station Technical Specification Bases Changes
LR-N20-0036, 4 to Updated Final Safety Analysis Report, Section 15, Accident Analyses21 May 20204 to Updated Final Safety Analysis Report, Section 15, Accident Analyses
LR-N20-0060, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements29 September 2020Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements
LR-N21-0079, Submittal of Hope Creek Generating Station Technical Specification Bases Changes3 November 2021Submittal of Hope Creek Generating Station Technical Specification Bases Changes
LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes29 March 2023Submittal of Hope Creek Generating Station Technical Specification Bases Changes
LR-N970093, Forwards Response to Request for Info,Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases Info for Hope Creek Generating Station11 February 1997Forwards Response to Request for Info,Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases Info for Hope Creek Generating Station
ML0204505004 January 2002Request for Change to Technical Specifications, Addition of LCO for Mechanical Vacuum Pump Trip Instrumentation
ML02108016018 March 2002Draft - RO & SRO Written
ML02133011529 April 2002Technical Specification Bases Change
ML02135009718 March 2002Final RO & SRO Written
ML02135021118 March 2002Final RO & SRO Written Post Exam Comments
ML03070040311 March 2003TS Pages for Amendment No. 143, Adding a Main Vacuum Pump Trip Specification
ML03106012715 April 2003Technical Specifications for License Amendment 146 Regarding Containment Requirements During Fuel Handling and Removal of Charcoal Filters
ML03115058529 January 1985Withdrawn NRC Generic Letter 1985-004: Operator Licensing Examinations
ML03265086713 June 2003Draft - RO & SRO Written
ML0327206191 April 2003Licensee Post Exam Comments & NRC Resolution (Note: for Failures)
ML03336069617 November 2003Request for Change to Technical Specifications Deactivate the Reactor Vessel Head Spray Portion of the Residual Heat Removal (RHR) System
ML0335700321 April 2003Written Exam Reference Material