Issue date | Title | |
---|---|---|
GNRO-2019/00012, Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program | 6 March 2019 | Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program |
GNRO-2020/00022, Report of Technical Specification Bases Changes | 21 July 2020 | Report of Technical Specification Bases Changes |
GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 6 June 2023 | License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b |
IR 05000216/2003015 | 5 April 1985 | Insp Rept 50-416/85-06 on 850216-0315.Violation & Deviation Noted:Inadequate Procedure for Calibr Reactor Vessel Water Level Instrument & Failure to Submit Annual Repts on ECCS Outages as Committed in FSAR |
IR 05000316/2004011 | 24 April 1985 | Insp Rept 50-416/85-09 on 850316-0411.Violations Noted: Steps in Sp 06-EL-1E31-M-0001 Performed Out of Sequence Resulting in ESF Containment Isolation Valve Actuation & Causing Isolation of RCIC Sys |
IR 05000412/2005017 | 29 May 1985 | Insp Rept 50-416/85-14 on 850412-0517.No Violation or Deviation Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation, Startup Testing,Independent Insp & ROs |
IR 05000416/1982050 | 25 June 1982 | IE Insp Rept 50-416/82-50 on 820531-0615.No Noncompliance Noted.Major Areas Inspected:Preoperational Test Procedure Results,Followup of Previous Enforcement Items,Tech Spec Change Review & Punch List Review |
IR 05000416/1985012 | 23 July 1985 | SALP Repts 50-416/85-12 & 50-417/85-03 for Oct 1983 - Apr 1985 |
IR 05000416/1986035 | 15 January 1987 | SALP Repts 50-416/86-35 & 50-417/86-05 for May 1985 - Oct 1986 |
IR 05000416/1986037 | 10 December 1986 | Insp Rept 50-416/86-37 on 861018-1114.Violation Noted: Failure to Follow or Provide Adequate Procedures Appropriate to Current Refueling Outage |
IR 05000416/1987001 | 9 March 1987 | Insp Rept 50-416/87-01 on 870117-0213.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Operational Safety Verification,Maint Observation & Surveillance Observation |
IR 05000416/1987012 | 26 May 1987 | Insp Repts 50-416/87-12 & 50-417/87-01 on 870418-0515.No Violations Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Operational Safety Verification,Maint Observation & Surveillance Observation |
IR 05000416/1987018 | 28 August 1987 | Insp Rept 50-416/87-18 on 870718-0821.Violations Noted. Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Operational Safety Verification,Maint Observation,Surveillance Observation & ESF Sys Walkdown |
IR 05000416/1988001 | 2 March 1988 | Insp Rept 50-416/88-01 on 880116-0219.Violations Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Operational Safety Verification,Maint Observation, Surveillance Observation & Unresolved Items & Mgt Meeting |
IR 05000416/1988011 | 30 June 1988 | Insp Rept 50-416/88-11 on 880606-10.No Violations or Deviations Noted.Unresolved Item Noted:Instrumentation for Drywell Pressure.Major Areas Inspected:Instrumentation Per Reg Guide 1.97 & Open Items Re Electrical Equipment |
IR 05000416/1988017 | 26 August 1988 | Insp Rept 50-416/88-17 on 880716-0819.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Maint & Surveillance Observations,Operational Safety Verification & ESF Sys |
IR 05000416/1988019 | 5 October 1988 | Insp Rept 50-416/88-19 on 880820-0923.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Observation,Ros,Operating Reactor Events & Followup & Unresolved Items |
IR 05000416/1988023 | 4 November 1988 | Insp Rept 50-416/88-23 on 880924-1020.No Violations or Deviations Noted.Major Areas Inspected:Operation Safety Verification Radiological Protection & Physical Security Verification,Maint Observation & ESF Sys Walkdown |
IR 05000416/1989017 | 28 July 1989 | Insp Rept 50-416/89-17 on 890617-0714.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Esf Sys Walkdown,Action on Previous Insp Findings & Reportable Occurrences |
IR 05000416/1990012 | 25 July 1990 | Insp Rept 50-416/90-12 on 900616-0720.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Licensee Self Assessment Capability & Action on Previous Insp Findings |
IR 05000416/1990015 | 4 September 1990 | Insp Rept 50-416/90-15 on 900721-0817.Violation Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Action on Previous Insp Findings & ROs |
IR 05000416/1992023 | 8 December 1992 | Insp Rept 50-416/92-23 on 921019-23.No Violations or Deviations Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Preparedness Exercise & Emergency Organization Activation |
IR 05000416/1993021 | 23 December 1993 | Insp Rept 50-416/93-21 on 931129-1203.No Violations Noted. Major Areas Inspected:Design & Testing of Mod.Insp Reviewed Licensee Implementation of Rwl Indication Ref Leg Backfill Mod |
IR 05000416/1993301 | 21 October 1993 | Exam Rept 50-416/93-301 on 930927-1001.Exam Results:Six SROs & Four ROs Passed Written & Operating Exams |
IR 05000416/1997015 | 9 October 1997 | Insp Rept 50-416/97-15 on 970916-19.Three Weaknesses Noted During Exercise.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures |
IR 05000416/1998005 | 28 May 1998 | Insp Rept 50-416/98-05 on 980405-0516.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support |
IR 05000416/2002005 | 14 January 2003 | IR 05000416-02-005, on 09/29/02 - 12/28/02, Entergy Operations, Inc., Grand Gulf Nuclear Station; Refueling and Outage Activities; Identification and Resolution of Problems |
IR 05000416/2003002 | 28 July 2003 | IR 05000416-03-002, on 03/30/2002 - 06/28/2003, Grand Gulf Nuclear Station, Agastat Relay Special Inspection Unresolved Item Closure |
IR 05000416/2003003 | 23 October 2003 | IR 05000416-03-003, on 06/29/2003 - 09/27/2003 for Grand Gulf, Problem Identification and Resolution |
IR 05000416/2003007 | 30 May 2003 | IR 05000416-03-007, on 05/05/03 - 05/09/03, Grand Gulf Nuclear Station. Special Inspection Report, Procedures |
IR 05000416/2004003 | 5 August 2004 | IR 05000416-04-003, on 04/01/2004 - 06/30/2004, Grand Gulf Nuclear Station; ALARA Planning and Controls, Problem Identification and Resolution, Event Followup |
IR 05000416/2008002 | 8 May 2008 | IR 05000416-08-002; 1/1-3/31/08; Grand Gulf Nuclear Station; Adverse Weather Protection, Fire Protection, Licensed Operator Requalification, Surveillance Testing, Identification and Resolution of Problems and Event Followup |
IR 05000416/2008003 | 24 July 2008 | IR 05000416-08-003, on 04/01/2008 Through 06/21/2008, Grand Gulf Nuclear Station, Fire Protection, Post-Maintenance Testing, and Event Follow-Up |
IR 05000416/2010004 | 9 November 2010 | IR 05000416-10-004 on 06/28/10 - 09/27/10, Grand Gulf, Integrated Inspection |
IR 05000416/2011007 | 22 September 2011 | IR 05000416-11-007; on 4/4/2011 - 8/30/2011; Entergy Operations, Inc.; Grand Gulf Nuclear Station: Triennial Fire Protection Team Inspection |
IR 05000416/2012002 | 4 May 2012 | IR 05000416-12-002; 01/01/2012 03/23/2012, Grand Gulf Nuclear Station, Unit 1, Integrated Resident and Regional Report; Flood Protection Measures, Licensed Operator Requalification Program, Maintenance Risk Assessment and Emergent Work Cont |
IR 05000416/2018002 | 2 August 2018 | NRC Integrated Inspection Report 05000416/2018002 |
IR 05000416/2018010 | 17 December 2018 | NRC Biennial Problem Identification and Resolution Inspection Report 05000416/2018010 |
IR 05000416/2018050 | 29 March 2019 | NRC Special Inspection Report 05000416/2018050 |
IR 05000416/2021040 | 18 November 2021 | NRC Supplemental Inspection Report 05000416/2021040 and Assessment Follow-Up Letter |
IR 05000416/2022011 | 6 June 2022 | Biennial Problem Identification and Resolution Inspection Report 05000416/2022011 |
IR 05000416/2023001 | 10 May 2023 | Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 |
IR 05000416/2023003 | 8 November 2023 | Integrated Inspection Report 05000416/2023003 |
IR 05000461/1993013 | 18 August 1993 | Insp Rept 50-461/93-13 on 930629-0809.No Violations Noted. Major Areas Inspected:Licensee Actions on Plant Operations |
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units | 23 March 1990 | Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units |
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown | 25 February 1992 | Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown |
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization | 8 April 1993 | Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization |
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels | 10 August 1993 | Thermal Stratification of Water in BWR Reactor Vessels |
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications | 26 November 1993 | Potential Problems with BWR Level Instrumentation Backfill Modifications |
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System | 24 May 1994 | Undetected Accumulation of Gas in Reactor Coolant System |