IR 05000324/198700629 April 1987Insp Repts 50-324/87-06 & 50-325/87-06 on 870301-0403.No Violation or Deviation Noted.Major Areas Inspected:Followup on Previous Enforcements & Unresolved Items & Circulars,Rept Review,Maint,Surveillance,Esf Sys & Operational Safety
IR 05000324/198701230 June 1987Insp Repts 50-324/87-12 & 50-325/87-12 on 870504-08.Major Areas Inspected:Area of Review of Operational Events,Control Room Activities,Maint,Training,Lers & Closeout of Open Items
IR 05000324/198802521 September 1988Insp Repts 50-324/88-25 & 50-325/88-25 on 880801-05.No Violations Noted.Major Areas Inspected:Maint Procedures, Training,Maint History of Asco Solenoid Valves,Asco Valve Procurement,Root Cause Determination & Reportability
IR 05000324/19880344 November 1988Safety Insp Repts 50-324/88-34 & 50-325/88-34 on 880901-30. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification, 10CFR21 Followup & LERs Review
IR 05000324/199730030 May 1997NRC Operator Licensing Exam Repts 50-324/97-300 & 50-325/97-300 for Tests Administered on 970425-0502.Four SROs Passed Exam & One Failed & Three ROs Passed & One Failed.Emergency Operating Procedures Strategies Were Weak
IR 05000324/19990037 June 1999Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support
IR 05000324/200100423 January 2002IR 05000325/2001-004 05000324/2001-004 on 12/29/2001 at Brunswick Steam Electric Plant. No Violations
IR 05000324/200500329 July 2005IR 05000325-05-003, IR 05000324-05-003 on 04/01/2005 - 06/30/2005 for Brunswick Steam Electric Plant, Units 1 & 2; Refueling Outage, Permanent Plant Modification, Problem Identification and Resolution
IR 05000324/200900230 April 2009IR 05000325-09-002, 05000324-09-002, & 07200006-09-001; Carolina Power and Light; 01/01/2009 - 03/31/2009; Brunswick Steam Electric Plant, Units 1 & 2, Brunswick Independent Spent Fuel Storage Installation, NRC Integrating Inspection Report
IR 05000324/201000228 April 2010IR 05000325-10-002 and 05000324-10-002; on 01/01/2010 - 03/31/2010; Brunswick Steam Electric Plant, Units 1 & 2; Refueling and Other Outage Activities, and Radioactive Gaseous and Liquid Effluent Treatment
IR 05000324/201300230 April 2013IR 05000325-13-002, 05000324-13-002; 01/01/13 - 03/31/13; Brunswick Steam Electric Plant, Units 1 & 2; Plant Modifications
IR 05000325/199203525 November 1992Discusses Insp Rept 50-325/92-35 on 921002-30 & Forwards Notice of Violation.Violation Involved Inadvertent Decrease of Reactor Vessel Water Level to RPS Actuation Level Setpoint of 165 Inches
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units23 March 1990Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown25 February 1992Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization8 April 1993Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels10 August 1993Thermal Stratification of Water in BWR Reactor Vessels
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications26 November 1993Potential Problems with BWR Level Instrumentation Backfill Modifications
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System24 May 1994Undetected Accumulation of Gas in Reactor Coolant System
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 115 July 1994Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel18 January 1996Partial Bypass of Shutdown Cooling Flow from Reactor Vessel
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown18 June 1996Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves5 August 1996Unexpected Opening of Multiple Safety Relief Valves
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power22 October 1996Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown11 December 1996Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown5 December 1997Recent Events Involving Reactor Coolant System Inventory Control During Shutdown
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick5 May 1999Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick
ML02035048214 October 1993License Amendments 166 and 197, Revise TS to Allow Replacement of Existing Steam Leak Detection Equipment with General Electric Numac Equipment
ML0207400568 March 2002Technical Specifications Pages for Amendment Nos. 217 & 243, Brunswick, Units 1 & 2
ML02088076322 March 2002Technical Specification Page (Paper Copy)
ML02155042531 May 2002Technical Specification Pages for Amendments 222 and 247 Extended Power Uprate
ML0306505729 September 2002February 50-325/2003-301 Exam Combined Final Ro/Sro Written Exam with Kas, Answers, References, & Analysis
ML0306505849 September 2002February 50-325/2003-301 Exam Final SRO Written Exam
ML0306505899 September 2002February 50-325/2003-301 Exam Combined Final RO Written Exam
ML0308402189 September 2002February 50-325/2003-301 Exam Draft Combined Ro/Sro Written Exam
ML0308402339 September 2002February 50-325/2003-301 Exam Draft SRO Written Exam
ML0308402459 September 2002February 50-325/2003-301 Exam Draft RO Written Exam
ML03087066425 March 2003Technical Specification Page for Amendment 254 to License DPR-62, Revising Safety Limit Minimum Critical Power Ratio Values from 1.09 to 1.11
ML03115058529 January 1985Withdrawn NRC Generic Letter 1985-004: Operator Licensing Examinations
ML04016021016 January 2004Task Interface Agreement (TIA 2003-05); NRC Policy Questions on Technical Specification Adequacy and Related Technical Specification Operability
ML04089067326 March 2004Technical Specification Pages 2.0-1 and 5.0-20, Amendment No. 231 Re. Minimum Critical Power Ratio Safety Limit
ML0503905032 February 2005Tech Spec Pages for Amendment No. 261 Elimination of Requirements for Hydrogen and Oxygen Monitors Using the Consolidated Line Item Improvement Process
ML0504002762 February 2005Tech Spec Pages for Amendment No. 234 Elimination of Requirements for Hydrogen and Oxygen Monitors Using the Consolidated Line Item Improvement Process
ML0529003765 October 2005Meeting with Carolina Power & Light, Meeting Handouts, MSIV Leakage Rate Limit License Amendment Request
ML0617301231 June 2006NUREG-1856, Safety Evaluation Report Related to the License Renewal of the Brunswick Steam Electric Plant, Units 1 and 2, Cover Page Through Section 2 - Structures and Components Subject to Aging Management Review
ML0630606272 November 2006PNO-II-06-005: Brunswick Steam Electric Plant, Unusual Event Declared Due to Loss of Offsite Power to Unit 2 4kV Emergency Buses
ML07104001728 April 199459 FRN 12990, Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations
ML07296046331 January 2007July-August Exam 50-325, 324/2007301 Draft Simulator Scenarios (3 of 4)
ML07296053631 January 2007July-August Exam - 325, 324/2007-301, Draft RO Written Exam with Answers, Reactor Operator Written Exam
ML07296057331 January 2007July-August Exam 50-325, 324/2007301 Final JPMs (3 of 4)
ML07297004231 January 2007July-August Exam 50-325, 324/2007301 Final Simulator Scenarios (Scenario 1 of 4) (Section 4 of 5)