Issue date | Title | Topic | |
---|---|---|---|
ML18221A168 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 6.0, Engineered Safety Features | Safe Shutdown Hydrostatic |
ML18221A169 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 7.0, Instrumentation and Controls | Safe Shutdown Anticipated operational occurrence Post Accident Monitoring Earthquake |
ML18221A172 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 9.0, Auxiliary Systems | |
ML18221A175 | 31 May 2018 | Updated Final Safety Analysis Report, Figures 9.2-2 Through 9.2-24 | |
ML18221A178 | 31 May 2018 | Updated Final Safety Analysis Report, Figures 9.4-1 Through 9.4-36 | |
ML18221A180 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 10.0, Steam and Power Conversion System | Safe Shutdown Boric Acid Grab sample Tornado Missile Post Accident Monitoring Hydrostatic Process Control Program |
ML18221A181 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 11.0, Radioactive Waste Management | |
ML18221A182 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 12.0, Radiation Protection | Boric Acid High Radiation Area Grab sample Anticipated operational occurrence Fuel cladding |
ML18221A206 | 31 May 2018 | Updated Final Safety Analysis Report, Figure 12.1-8 | |
ML18221A210 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | Safe Shutdown Fitness for Duty High winds Shutdown Margin High Radiation Area Anticipated operational occurrence Probabilistic Risk Assessment Maintenance Rule Program Fatigue Rule Fire Protection Program |
ML18221A211 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation | Boric Acid Shutdown Margin Stroke time Hydrostatic Emergency Lighting |
ML18221A212 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 15, Accident Analyses | |
ML18221A213 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 16, Technical Specifications | |
ML18221A214 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 17, Quality Assurance | Hydrostatic Nondestructive Examination |
ML18221A215 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Activities | Boric Acid Fire Barrier Aging Management Fire Protection Program |
ML19255F380 | 31 May 2019 | V.C. Summer Nuclear Station - Updated Final Safety Analysis Report | |
ML19255F409 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | Safe Shutdown Boric Acid Ultimate heat sink Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Incorporated by reference Earthquake Fuel cladding Flow Induced Vibration |
ML19255F415 | 31 May 2019 | Updated Final Safety Analysis Report, Figure 2.1-26 | |
ML19255F418 | 31 May 2019 | Updated Final Safety Analysis Report, Figure 2.4-6 | |
ML19255F421 | 31 May 2019 | Updated Final Safety Analysis Report, Figure 2.5-10 | |
ML19255F423 | 31 May 2019 | Updated Final Safety Analysis Report, Figure 2.5-13 | |
ML19255F425 | 31 May 2019 | Updated Final Safety Analysis Report, Figure 2.5-25 | |
ML19255F427 | 31 May 2019 | Updated Final Safety Analysis Report, Figure 2.5-27 | |
ML19255F430 | 31 May 2019 | Updated Final Safety Analysis Report, Figure 2.5-3 | |
ML19255F432 | 31 May 2019 | Updated Final Safety Analysis Report, Figure 2.5-77 | |
ML19255F434 | 31 May 2019 | Updated Final Safety Analysis Report, Figure 2.5-78 | |
ML19255F436 | 31 May 2019 | Updated Final Safety Analysis Report, Figure 2.5-79 | |
ML19255F443 | 31 May 2019 | Updated Final Safety Analysis Report, Figures 2E-1 Through 2E-90 | |
ML19255F446 | 31 May 2019 | Updated Final Safety Analysis Report, Figures 2F-2 Through 2F-86 | |
ML19255F485 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems | Safe Shutdown Boric Acid Shutdown Margin Packing leak Ultimate heat sink Non-Destructive Examination Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Enforcement Discretion Coatings Operating Basis Earthquake Finite Element Analysis Tornado Generated Missile Abnormal operational transient Tornado Missile Protection Earthquake Control of Heavy Loads Turbine Missile Fuel cladding Liquid penetrant Pressure Boundary Leakage Through-Wall Leakage Power change Flow Induced Vibration |
ML19255F488 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 4, Reactor | Boric Acid Shutdown Margin Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Earthquake Fuel cladding Power change Flow Induced Vibration |
ML19255F491 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System | Safe Shutdown Boric Acid Shutdown Margin Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake Nondestructive Examination Incorporated by reference Earthquake Fuel cladding Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Power change Flow Induced Vibration |
ML19255F495 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features | Safe Shutdown Boric Acid Packing leak Fire Barrier Stroke time Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Coatings Aging Management Foreign Material Exclusion Power-Operated Valves Power Operated Valves Overexposure |
ML19255F499 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls | Safe Shutdown Boric Acid Shutdown Margin Anticipated operational occurrence Water Inventory Control Post Accident Monitoring Earthquake Fuel cladding Pressure Boundary Leakage Power change |
ML19255F503 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML19255F507 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | Safe Shutdown Boric Acid Loop seal Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Operating Basis Earthquake Emergency Lighting Design basis earthquake Overtravel Earthquake Biofouling Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
ML19255F510 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Boric Acid Grab sample Tornado Missile Post Accident Monitoring Hydrostatic Process Control Program Turbine Missile |
ML19255F512 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | |
ML19255F514 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | Boric Acid High Radiation Area Grab sample Anticipated operational occurrence Earthquake Fuel cladding |
ML19255F517 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | Safe Shutdown Fitness for Duty High winds Shutdown Margin High Radiation Area Anticipated operational occurrence Probabilistic Risk Assessment Maintenance Rule Program Fatigue Rule |
ML19255F520 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation | Boric Acid Shutdown Margin Stroke time Hydrostatic Emergency Lighting |
ML19255F523 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 15, Accident Analyses | Boric Acid Shutdown Margin Loop seal Grab sample Anticipated operational occurrence Post Accident Monitoring Emergency Lighting Earthquake Fuel cladding Power change Coast down Failure to Scram |
ML19255F525 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 16, Technical Specifications | |
ML19255F528 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 17, Quality Assurance | Hydrostatic Nondestructive Examination |
ML19255F531 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Activities | Boric Acid Fire Barrier Coatings Aging Management Moisture barrier Liquid penetrant Fire Protection Program |
ML19255F590 | 31 May 2019 | Updated Final Safety Analysis Report, Figure 12.1-8 | |
ML19255F604 | 31 May 2019 | Updated Final Safety Analysis Report, Figures 9.2-1 Through F9.2-24 | |
ML19255F612 | 31 May 2019 | Updated Final Safety Analysis Report, Figures 9.4-1 Through 9.4-36 | |
ML19255F650 | 31 May 2019 | Approved FSAR Revision Notices Incorporated Since May 2018 Update -Effective May 31, 2019 | Fire Protection Program |
ML19261A144 | 26 August 2019 | Submittal of Final Safety Analysis Report Updated Through May 31, 2019 |