ML18221A16831 May 2018Updated Final Safety Analysis Report, Chapter 6.0, Engineered Safety FeaturesSafe Shutdown
Hydrostatic
ML18221A16931 May 2018Updated Final Safety Analysis Report, Chapter 7.0, Instrumentation and ControlsSafe Shutdown
Anticipated operational occurrence
Post Accident Monitoring
Earthquake
ML18221A17231 May 2018Updated Final Safety Analysis Report, Chapter 9.0, Auxiliary Systems
ML18221A17531 May 2018Updated Final Safety Analysis Report, Figures 9.2-2 Through 9.2-24
ML18221A17831 May 2018Updated Final Safety Analysis Report, Figures 9.4-1 Through 9.4-36
ML18221A18031 May 2018Updated Final Safety Analysis Report, Chapter 10.0, Steam and Power Conversion SystemSafe Shutdown
Boric Acid
Grab sample
Tornado Missile
Post Accident Monitoring
Hydrostatic
Process Control Program
ML18221A18131 May 2018Updated Final Safety Analysis Report, Chapter 11.0, Radioactive Waste Management
ML18221A18231 May 2018Updated Final Safety Analysis Report, Chapter 12.0, Radiation ProtectionBoric Acid
High Radiation Area
Grab sample
Anticipated operational occurrence
Fuel cladding
ML18221A20631 May 2018Updated Final Safety Analysis Report, Figure 12.1-8
ML18221A21031 May 2018Updated Final Safety Analysis Report, Chapter 13, Conduct of OperationsSafe Shutdown
Fitness for Duty
High winds
Shutdown Margin
High Radiation Area
Anticipated operational occurrence
Probabilistic Risk Assessment
Maintenance Rule Program
Fatigue Rule
Fire Protection Program
ML18221A21131 May 2018Updated Final Safety Analysis Report, Chapter 14, Initial Tests and OperationBoric Acid
Shutdown Margin
Stroke time
Hydrostatic
Emergency Lighting
ML18221A21231 May 2018Updated Final Safety Analysis Report, Chapter 15, Accident Analyses
ML18221A21331 May 2018Updated Final Safety Analysis Report, Chapter 16, Technical Specifications
ML18221A21431 May 2018Updated Final Safety Analysis Report, Chapter 17, Quality AssuranceHydrostatic
Nondestructive Examination
ML18221A21531 May 2018Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and ActivitiesBoric Acid
Fire Barrier
Aging Management
Fire Protection Program
ML19255F38031 May 2019V.C. Summer Nuclear Station - Updated Final Safety Analysis Report
ML19255F40931 May 2019Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of PlantSafe Shutdown
Boric Acid
Ultimate heat sink
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Incorporated by reference
Earthquake
Fuel cladding
Flow Induced Vibration
ML19255F41531 May 2019Updated Final Safety Analysis Report, Figure 2.1-26
ML19255F41831 May 2019Updated Final Safety Analysis Report, Figure 2.4-6
ML19255F42131 May 2019Updated Final Safety Analysis Report, Figure 2.5-10
ML19255F42331 May 2019Updated Final Safety Analysis Report, Figure 2.5-13
ML19255F42531 May 2019Updated Final Safety Analysis Report, Figure 2.5-25
ML19255F42731 May 2019Updated Final Safety Analysis Report, Figure 2.5-27
ML19255F43031 May 2019Updated Final Safety Analysis Report, Figure 2.5-3
ML19255F43231 May 2019Updated Final Safety Analysis Report, Figure 2.5-77
ML19255F43431 May 2019Updated Final Safety Analysis Report, Figure 2.5-78
ML19255F43631 May 2019Updated Final Safety Analysis Report, Figure 2.5-79
ML19255F44331 May 2019Updated Final Safety Analysis Report, Figures 2E-1 Through 2E-90
ML19255F44631 May 2019Updated Final Safety Analysis Report, Figures 2F-2 Through 2F-86
ML19255F48531 May 2019Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and SystemsSafe Shutdown
Boric Acid
Shutdown Margin
Packing leak
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Enforcement Discretion
Coatings
Operating Basis Earthquake
Finite Element Analysis
Tornado Generated Missile
Abnormal operational transient
Tornado Missile Protection
Earthquake
Control of Heavy Loads
Turbine Missile
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Through-Wall Leakage
Power change
Flow Induced Vibration
ML19255F48831 May 2019Updated Final Safety Analysis Report, Chapter 4, ReactorBoric Acid
Shutdown Margin
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Earthquake
Fuel cladding
Power change
Flow Induced Vibration
ML19255F49131 May 2019Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant SystemSafe Shutdown
Boric Acid
Shutdown Margin
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Incorporated by reference
Earthquake
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Power change
Flow Induced Vibration
ML19255F49531 May 2019Updated Final Safety Analysis Report, Chapter 6, Engineered Safety FeaturesSafe Shutdown
Boric Acid
Packing leak
Fire Barrier
Stroke time
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Coatings
Aging Management
Foreign Material Exclusion
Power-Operated Valves
Power Operated Valves
Overexposure
ML19255F49931 May 2019Updated Final Safety Analysis Report, Chapter 7, Instrumentation and ControlsSafe Shutdown
Boric Acid
Shutdown Margin
Anticipated operational occurrence
Water Inventory Control
Post Accident Monitoring
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
ML19255F50331 May 2019Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML19255F50731 May 2019Updated Final Safety Analysis Report, Chapter 9, Auxiliary SystemsSafe Shutdown
Boric Acid
Loop seal
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Operating Basis Earthquake
Emergency Lighting
Design basis earthquake
Overtravel
Earthquake
Biofouling
Pressure Boundary Leakage
Fire Protection Program
Unidentified leakage
ML19255F51031 May 2019Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemSafe Shutdown
Boric Acid
Grab sample
Tornado Missile
Post Accident Monitoring
Hydrostatic
Process Control Program
Turbine Missile
ML19255F51231 May 2019Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management
ML19255F51431 May 2019Updated Final Safety Analysis Report, Chapter 12, Radiation ProtectionBoric Acid
High Radiation Area
Grab sample
Anticipated operational occurrence
Earthquake
Fuel cladding
ML19255F51731 May 2019Updated Final Safety Analysis Report, Chapter 13, Conduct of OperationsSafe Shutdown
Fitness for Duty
High winds
Shutdown Margin
High Radiation Area
Anticipated operational occurrence
Probabilistic Risk Assessment
Maintenance Rule Program
Fatigue Rule
ML19255F52031 May 2019Updated Final Safety Analysis Report, Chapter 14, Initial Tests and OperationBoric Acid
Shutdown Margin
Stroke time
Hydrostatic
Emergency Lighting
ML19255F52331 May 2019Updated Final Safety Analysis Report, Chapter 15, Accident AnalysesBoric Acid
Shutdown Margin
Loop seal
Grab sample
Anticipated operational occurrence
Post Accident Monitoring
Emergency Lighting
Earthquake
Fuel cladding
Power change
Coast down
Failure to Scram
ML19255F52531 May 2019Updated Final Safety Analysis Report, Chapter 16, Technical Specifications
ML19255F52831 May 2019Updated Final Safety Analysis Report, Chapter 17, Quality AssuranceHydrostatic
Nondestructive Examination
ML19255F53131 May 2019Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and ActivitiesBoric Acid
Fire Barrier
Coatings
Aging Management
Moisture barrier
Liquid penetrant
Fire Protection Program
ML19255F59031 May 2019Updated Final Safety Analysis Report, Figure 12.1-8
ML19255F60431 May 2019Updated Final Safety Analysis Report, Figures 9.2-1 Through F9.2-24
ML19255F61231 May 2019Updated Final Safety Analysis Report, Figures 9.4-1 Through 9.4-36
ML19255F65031 May 2019Approved FSAR Revision Notices Incorporated Since May 2018 Update -Effective May 31, 2019Fire Protection Program
ML19261A14426 August 2019Submittal of Final Safety Analysis Report Updated Through May 31, 2019