APPROVED FSAR REVISION NOTICES INCORPORATED SINCE MAY 2018 UPDATE - EFFECTIVE May 31, 2019 DATE

  1. RN # SECTIONS BRIEF DESCRIPTION APPROVED Engineering Change Request (ECR) 50809 and ECR 50809F - Site Drainage Piping Improvements Figure 2.4-6 1 11-024 2019-03 This change revised FSAR Figure 2.4-6 and 9.3-15 to show the modification of drain lines and relocated drainage Figure 9.3-15 outlets to comply with 10CFR73.55 and 10CFR73.58.

ECR 50810 - Hazards Protection for NFPA 805 Transition Figure 7.4-1 Figure 7.4-2 This FSAR change revised plant drawings to achieve compliance with NFPA 805 requirements. Specifically, 2 14-041 2019-02 Figure 8.3-2aa FSAR figures 7.4.1 and 7.4.2 were revised to include the addition of the new transfer switches for the EFW Figure 8.3-2ab valves and charging vale to allow isolation of the control building circuits for control room evacuation panel Figure 8.3-4 operations in case of a fire. FSAR Figures 8.3-2aa, 8.3-2aB, and 8.3-4 were revised to show the addition of the new fuses in the shunt circuit for Control Room Battery Charger remote ammeter circuits.

ECR 50888 - Combined Maintenance Shop Utility Tie-Ins and Site Preparation Figure 1.2-1 3 15-010 2019-02 This change revised FSAR Figure 1.2-1 and 2.4 to show the new utility tie-ins for a Combined Maintenance Shop Figure 2.4-6 in the yard area.

ECR 72141- Revision to Figure 5.2-8A 4 16-008 2019-05 Figure 5.2-8A This change revised FSAR section 5.2 to include the as-built configuration of the Nitrogen System.

Section 8.1 ECR 50855 - Replacement of Fairfield Breakers 8942 and 8912 Section 8.2 Figure 8.2-1 This changed revised FSAR Figures in Section 8.2 to incorporate the replacement of Fairfield Breakers 8942 and 5 16-010 2019-03 Figure 8.2-2 8912. The previous oil circuit breakers 8942 and 8912 were replaced with SF6 circuit breakers, new coupling Figure 8.2-2a capacitors, voltage transformers, and new foundations for each line.

Figure 8.2-2b Figure 8.2-2c ECR 50913 - South Protected Area Blast & Ballistic Rates Enclosures (BBRE) Installation Figure 9.5-1, SH2 6 17-008 2019-03 This changed revised FSAR Figures 1.2-1 and 9.5-1 to reflect the removal of the C Warehouse south overhang Figure 1.2-1 sprinkler system and addition of three new security BBREs.

ECR 50910 - Turbine Building Sump Radiation Monitor RM-L8 Sample Line Suction Strainer 7 17-012 2018-08 Figure 9.3-14 This change added a Wye strainer, strainer blow-off isolation valve, and strainer isolation valve to drawing D-302-352. The strainer and associated valves were installed to intercept and remove debris upstream of the Turbine Building Sump Liquid Radiation Monitor (RML0008).

ECR 50883 - Safety Related Inverter Replacement Section 3.10 8 17-022 2018-12 Section 8.3 This change revised FSAR Sections 3.10 and 8.3 to include the increased efficiency of the replacement inverters Figure 8.3-1 XIT5901, XIT5902, XIT5903, and XIT5904 on the automatic and manual loading and unloading of the Diesel Generator.

VC Summer Nuclear Station Page 1 of 6

APPROVED FSAR REVISION NOTICES INCORPORATED SINCE MAY 2018 UPDATE - EFFECTIVE May 31, 2019 DATE

  1. RN # SECTIONS BRIEF DESCRIPTION APPROVED ECR 72296 - TS 6.8.4.g Containment Leak Rate Testing Program - LAR-14-01541 Section 6.2 9 17-028 2018-08 Figure 6.2-1-6.2-3 The change revises the peak loss of cooling accident containment pressure to a value which reflects an updated Figure 6.2-7 mass an energy (M&E) analysis. The peak pressure is also used as a criterion for containment leak rate testing.

The updated M&E analysis address Westinghouse Nuclear Safety Advisory Letters NSAL-06-06, 11-2, and 14-1.

Section 3.2 Section 3.9 Section 6.2 ECR 50917 - Control Rod Drive Mechanism Cooling System Demolition Figure 6.2-52 10 17-029 2019-01 This change revised the FSAR description of the CRDM Cooling Water System to denote equipment removed Figure 7.5-1, SH5 during RF-24 and its status of being abandoned in place to ECR 50917. These changes were incorporated to Figure 9.2-9A FSAR Sections 3.2, 3.9, 6.2, 7.5, 9.2, and 9.4.

Section 9.4 Figure 9.4-32 ECR 72340 - Environmentally Assisted Fatigue Methodology 11 18-003 2018-07 Section 18.3.2 This change revised FSAR Section 18.3.2.1 to include the use of NUREG/CR-6909 as an acceptable NRC approved methodology for computing fatigue cumulative usage factors, which account for the effects of environmentally assisted fatigue for the period of extended operation.

ECR 50615 - Elimination of XIT5905 for Digital Control Systems (DCS) Cabinets XPN6035 thru XPN6038 Section 8.3 This change revised FSAR Figure 8.3-4b to reflect the configuration changes of adding a redundant power supply 12 18-004 2019-02 to the DCS Cabinets. FSAR Section 8.3.2.1.1 and 8.3.2.1.5.5 were also revised to include the Independent Spent Figure 8.3-4b Fuel Storage Installation Electrical Building as an uninterruptible power supply to the secondary plant digital control system.

Figure 9.5-1, SH1 ECR 72366 - Correction to FSAR Figure 302 Drawings 13 18-007 2018-08 Figure 9.2-4 Figure 9.2-6 This change corrected component symbols in FSAR Section 9.2 and 9.5 302 Drawings.

Figure 5.2-8 ECR 72367 - Corrections to Drawing Errors Generated During CADD Process Figure 9.2-2, SH4 14 18-011 2018-08 Figure 9.3-4 This change revises FSAR Drawings - Section 5 Figure 5.2-8, Drawing 302-812, Revision 21; Section 9 Figure Figure 10.4-6 9.3-4, Drawing 302-771, Revision 40 and Figure 9.2-2, Drawing 302-222, Sheet 4, Revision 4; Section 10 Figure Figure 10.4-7A 10.4-6, Drawing 302-204, Revision 4, and Figure 10.4-7A, Drawing 302-165, Revision 29.

ECR 72375 - FSAR Figure Enhancement This change enhanced FSAR Figure 9.5-7 to make the equipment identifications (IDs) associated with 1MS 15 18-012 2018-08 Figure 9.5-7 005-3 legible.

VC Summer Nuclear Station Page 2 of 6

APPROVED FSAR REVISION NOTICES INCORPORATED SINCE MAY 2018 UPDATE - EFFECTIVE May 31, 2019 DATE

  1. RN # SECTIONS BRIEF DESCRIPTION APPROVED CR-12-00400 - Added the use of Controlled Low-Strength Material 16 18-014 2018-06 Section 2.5.4 This FSAR change adds the use of Controlled Low-Strength Material flowable cementitious backfill as an acceptable safety related backfill to FSAR section 2.5.4.5.2.

ECR 72379 - Revision to FSAR Section 9.3, and Figure 9.3-16 Sheet 3.

17 18-015 2018-07 Figure 9.3-16, SH 3 This change revised FSAR Figure 9.3-16 Sheet 3, Drawing E-302-675, Revision 37 to add a missing B match mark flag that was inadvertently removed under ECR 51007.

Figure 1.2-11 ECR 50920 - Emergency Feedwater Mezzanine Walk Platform Figure 12.1-4 18 18-017 2018-12 This change revised FSAR Figures 1.2-11, 12.1-4, 12.1-13, and 12A.4-8 to include the addition of an emergency Figure 12.1-13 Figure 12A.4-8 feedwater mezzanine walk platform.

ECR 50923 - Cycle 25 Core Reload Design 19 18-018 2018-10 Figure 4.2-6 This change revised FSAR Section 4.2 Figure 4.2-6 to be consistent with the fuel built for VCSNS Unit 1 Cycle

25. Specifically, this change incorporated the Westinghouse design change of the Fuel Top Grid bulge tool.

ECR 71580 - Revision to Drawing D-302-222, S2 and S4 Figure 9.2-2, SH 2 20 18-021 2018-08 This change corrected FSAR Section 9.2 Drawing 302-222 Sheet 2 and 4 to reflect as-built conditions for their Figure 9.2-2, SH 4 respective systems.

CR-18-01009 - Correction to FSAR Table 6.2-54a 21 18-022 2018-06 Section 6.2 This change makes a correction to FSAR Table 6.2-54a. This correction adds a spare electrical penetration, Penetration 807 to the table.

Equal To or Better Than (ETBT)-458 - Replacement Check Valves for XVC09591A/B/C-CC 22 18-023 2018-07 Figure 9.2-5 This change removed the Bill of Materials number ROI-5 and replaced it with ETBT-458 on FSAR Figure 9.2-5 (Drawing D-302-612, R28) to reflect the replacement of Check Valves XVC09591A/B/C-CC.

ECR 72186 - Correction to FSAR Section 9 Figure 9.3-3 This change corrected piping configuration upstream of the Reactor Building (RB) Instrument Air (IA) 23 18-024 2018-09 Figure 9.3-3 Compressors to reflect the as-built configuration of plant. Equipment IDs IPI08364 and IPI08374 High Root Valves were corrected. The electrical connection to the A RB IA Compressor Motor will be drawn to show it cross over the 6-inch header to the A Compressor.

ECR 71289 - Correction to FSAR Section 9 Figure 9.3-7 24 18-025 2018-06 Figure 9.3-7 This change corrected two labels (J-6 and J-9) at location F-11 and added a label to location H-12 for FD-23 on E-911-103.

VC Summer Nuclear Station Page 3 of 6

APPROVED FSAR REVISION NOTICES INCORPORATED SINCE MAY 2018 UPDATE - EFFECTIVE May 31, 2019 DATE

  1. RN # SECTIONS BRIEF DESCRIPTION APPROVED ECR 72395 - Corrections to FSAR Figure 302 Drawings Figure 9.2-1, SH1 This change revised FSAR Section 9 Figure 9.2-1, Drawing 302-221 Sheet 1, Revision 32 and Figure 9.2-9A, 25 18-026 2018-10 Figure 9.2-9A Drawing 302-162, Revision 14; Section 10 Figure 10.4-7A, Drawing 302-165, Revision 29 and Section 11, Figure Figure 10.4-7A 11.3-4, Sheet 3, and Drawing E-302-742, Revision 17. These changes were completed to ensure that the Figure 11.3-4, SH3 drawings reflected the as-built configuration of the systems.

ECR 72404 - Low Pressure Nitrogen Missing Needle Valves Document & Database Changes 26 18-028 2019-01 Figure 5.2-8a This change revised FSAR Figure 5.2-SA to include two missing needle valves (XVN06300-NN and XVN06301-NN) in the Low Pressure Nitrogen System.

CR-17-00717 - Correction to FSAR Section 3A 27 18-029 2018-07 Section 3A This change revised the VCSNS regulatory position on quality requirements associated with Reg. Guide 1.189.

ECR 72406 - Addition of XVG15522-DW to FSAR Figure 9.2-9 28 18-030 2019-01 Figure 9.2-9 This change revised FSAR Figure 9.2-9, Demineralizer Water System Flow Diagram to include XVG15522-DW.

ECR 72429 - Misaligned Instrument Air Valve 29 18-033 2018-12 Figure 9.3-2 This change revised FSAR Section 9.3 Drawing D-302-271 to correct the valve XVA76670-IA to XVA72670-IA.

ECR 72431 - Correction to FSAR Section 6.2, Figure 6.2-59 30 18-034 2018-10 Figure 6.2-59 This change corrected Equipment IDs for valves associated with IFI07304, IFI07305, and IFI07313 on the Reactor Containment Leak Rate Test Panel.

ECR 72425 - Reactor Building Spray Operation Basis Reconciliation 31 18-036 2018-12 Section 6.2 This change to the FSAR clarifies the operating time of the Reactor Building Spray System following a design basis Loss of Coolant Accident from 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

ECR 50874AD - Reactor Building Cooling Upgrade Major Revision 32 18-039 2019-04 Figure 9.4-25, SH2 This change revised FSAR Figure 9.4-25 to include the installation of oil coolers to XHX0010B and XHX0010C.

ECR 72444 - Corrections to FSAR Figure 9.2-4 Figure 9.2-4 This change revised FSAR Figure 9.2-4 to reflect the as-built configuration of the plant. The location of the 33 18-040 2019-05 plugged recirculation line, valve symbol used for XVA09614-CC, added IFX7081, and flanges on either side of the CC Chem Inj Pump Oil Trap were added to the figure.

VC Summer Nuclear Station Page 4 of 6

APPROVED FSAR REVISION NOTICES INCORPORATED SINCE MAY 2018 UPDATE - EFFECTIVE May 31, 2019 DATE

  1. RN # SECTIONS BRIEF DESCRIPTION APPROVED CR-14-01490 - Revise Reactor Building Spray System and Feedwater System Design Information Section 6.2 34 18-042 2018-10 This change revised FSAR Sections 6.2 and 10.4 to include a description of relief valves installed to prevent Section 10.4 pressure locking of the Reactor Building Spray System and Feedwater System Valves.

ACAD 17-001 Training Program 35 18-043 2018-10 Section 13.2 This change revised FSAR Section 13.2.1, Item 9 to remove the reference to Mechanical Maintenance Supervisor Training Program as an INPO Accredited Training Program.

ECR 72207 NC/CR-11-03747 Accept-As-Is/ Current Penstocks Operation Acceptable 36 18-044 2019-01 Figure 10.4-17 This change revised FSAR Figure 10.4-17 to permanently accept the current condition/operation of the Liquid Waste System at the Penstocks, with section of piping removed & valve XVG06904A-LW out of service.

ECR 50933 - Repair Service Water (SW) Pipe Leaks Using PM Caps This change revised FSAR Figure 9.2-2 to move the design flags from the outlet of the XVB03121A(B)-SW to the 37 18-045 2019-01 Figure 9.2-2, SH1 outlet of the orifice XPS0245A(B). These changes were a result of cavitation damage at the outlet of Figure 9.2-2, SH3 XVB03121A(B)SW, EDG Cooler A and B Service Water Return Valves, the material downstream is changed to stainless and an orifice is installed to lessen the throttling duty of the valves.

ECR 71630 - Correction to FSAR Section 10 Figure 10.4-7A, Drawing D-302-165, Revision 30 38 18-046 2019-05 Figure 10.4-7A This change revised FSAR Figure 10.4-7A to include Pressure indicator (IPI16631) and the associated HR valve (IPI16631-HR-WI). These changes were made to reflect the as-built configuration of the plant.

ECR 50931, Incore Detector System Ten Path Vent Removal 39 18-047 2019-03 Figure 5.2-8A This change revised FSAR Section 5.2, Figure 5.2-8A to incorporate the incore detector system ten path vent removal. This revision consisted of removing portion of the CO2 Purge System tubing and installing an overflow drain line to ILS50402.

ECR 72474 - Piping and Valve Corrections to FSAR Figure 9.27 40 18-048 2019-01 Figure 9.2-7 This change revised FSAR Section 9., Figure 9.27 to reconnect ITI07003B to the Charging/SI Pump cooling water return line and redraw valve symbols for XVT09530A/B/CCC and XVT09686A/B/CCC.

ECR 50628 - Fire Protection Program Transition to NFPA 805 This change revised FSAR Section 9.5.1 Figure 9.5-1, S1, S3, S4, and S5 to correct errors identified during ECR 50628 implementation. Figure 9.5-1 S1 was revised to add a reducer downstream of XVT06017-FS and to Shift Figures 9.5-1 41 18-050 2019-05 border for AFSPH back to proper location. Figure 9.5-1 S3 & S4 was revised to remove safety classification flags SH 1, 3, 4 & 5 to show fire hose stations that are listed in SAP-131A and Figure 9.5-1 S3 & S4. Since these Hose stations are Quality Related (QR) Note 3 was which states Valve is QR, Hose Station is Non-Safety Related. Figure 9.5-1 S5 was revised to remove the safety classification flag upstream of XVM041 05-FS.

VC Summer Nuclear Station Page 5 of 6

APPROVED FSAR REVISION NOTICES INCORPORATED SINCE MAY 2018 UPDATE - EFFECTIVE May 31, 2019 DATE

  1. RN # SECTIONS BRIEF DESCRIPTION APPROVED ECR 72478 - Piping Correction to FSAR Figure 11.3-4 42 18-052 2019-01 Section 11.3 SH 1 This change revised FSAR Section 11.3, Figure 11.3-4 to remove a cross-connection at a coordinate (F-8) that does not exist.

ECR 72479 - Airflow/Flow Path Corrections to FSAR Figure 9.2-9 and FSAR Figure 9.3-2 Figure 9.2-9 43 18-053 2019-03 This change revised FSAR Figure 9.2-9 and 9.3-2 to correctly show the instrument air flow requirements for the Figure 9.3-2 DW Demineralizers. These changes were made to reflect the approved, as-built configuration of the plant.

FSAR Appendix 3A Division 1 NRC Regulatory Guides applicable to the VCSNS. (CR-16-01194) 44 18-054 2019-01 Section 3A This change revised the specific revisions listed for Regulatory Guides 1.84 and 1.192 in FSAR Appendix 3A.

FSAR Appendix 3A was also revised to show that Regulatory Guide 1.85 was withdrawn and eliminated.

ECR 72491 - Renaming XVA72670 to XVN72670 45 19-001 2019-05 Figure 9.3-2 This change revised FSAR Figure 9.3-2 to correct the valve symbol to show a needle valve for VN72670.

VC Summer Nuclear Station Page 6 of 6