Issue date | Title | Topic | |
---|---|---|---|
ML20078K278 | 21 July 1983 | Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports | |
ML20078K284 | 5 August 1983 | Rev 1 to third-party Const Implementation Overview Approval | |
ML20078K294 | 5 August 1983 | Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting | |
ML20078K306 | 5 August 1983 | Rev 1 for third-party Const Implementation Overview Re QA Plan | |
ML20080A252 | 5 July 1983 | Rev 1 to Third-Party Const Implementation Overview Procedure | |
ML20081A599 | 26 August 1983 | Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies | |
ML20081A614 | 26 August 1983 | Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions | |
ML20081A626 | 26 August 1983 | Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts | |
ML20081C403 | 7 March 1984 | Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project | Probabilistic Risk Assessment Earthquake Backfit |
ML20084E170 | 27 April 1984 | Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 | |
ML20092C854 | 15 June 1984 | Midland Idcvp Auxiliary Feedwater Sys Performance Requirements | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Earthquake Turbine Missile |
ML20093D213 | 30 April 1984 | Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes | |
ML20127N389 | 31 January 1985 | Rev 1 to Midland Energy Ctr Project Shutdown Plan | Non-Destructive Examination Coatings Minimum staff Fire Protection Program Fire Watch Scaffolding |
ML20127N394 | 31 January 1985 | Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan | |
ML20138Q387 | 13 December 1985 | Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance |