Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML21098A188 | 14 April 2021 | Final SE of Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections | Anticipated operational occurrence Nondestructive Examination Foreign Material Exclusion |
ML21106A239 | 20 April 2021 | Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements | Pressure Boundary Leakage |
ML21188A225 | 11 July 2021 | Final Model SE of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling | |
ML21188A227 | 11 July 2021 | Final Traveler SE of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling | |
ML23153A144 | 11 September 2023 | Draft SE of Traveler TSTF-591, Revise Risk-Informed Completion Time (RICT) Program | Probabilistic Risk Assessment |
ML23206A075 | 31 July 2023 | Final Model SE of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | Reactor Vessel Water Level High Radiation Area Anticipated operational occurrence |
ML23206A076 | 31 July 2023 | Final Traveler SE of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | Reactor Vessel Water Level High Radiation Area Anticipated operational occurrence |
ML23241B040 | 11 September 2023 | Final Traveler SE of TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown | Safe Shutdown Recently irradiated fuel Offsite Circuit |
ML23262B230 | 21 September 2023 | Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program | Probabilistic Risk Assessment |
ML23325A214 | 18 December 2023 | Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program | Probabilistic Risk Assessment |
ML24029A147 | 31 January 2024 | TSTF-592 Cover Letter for Final SE of TSTF-592 | |
ML24029A148 | 31 January 2024 | Final Traveler SE of TSTF-592 | |
TSTF-18-07, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 2 | 2 July 2018 | TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 2 | |
TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. | 5 November 2019 | TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. | Safe Shutdown Ultimate heat sink Anticipated operational occurrence |