Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-21-0270, Response to Second Request for Additional Information (RAI) Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-85328 October 2021Response to Second Request for Additional Information (RAI) Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853Weld Overlay
Stress corrosion cracking
RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 12 December 2021Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1Fire Barrier
Operating Basis Earthquake
Aging Management
Stress corrosion cracking
License Renewal
Subsequent License Renewal
Fire Protection Program
RA-21-0325, Response to NRC Requests for Confirmation of Information - Set 217 December 2021Response to NRC Requests for Confirmation of Information - Set 2Aging Management
License Renewal
Subsequent License Renewal
RA-21-0332, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a7 January 2022Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1aBoric Acid
Weld Overlay
Coatings
Operating Basis Earthquake
Aging Management
License Renewal
Subsequent License Renewal
Dissimilar Metal Weld
Power change
Flow Induced Vibration
Exclusive Use
Affidavit
Thermal fatigue
RA-22-0002, Appendix 10-B - Pump and Pipe Selection Calculations for a Hypothetical Cooling Tower Retrofit at Oconee Nuclear Station7 January 2022Appendix 10-B - Pump and Pipe Selection Calculations for a Hypothetical Cooling Tower Retrofit at Oconee Nuclear StationZebra Mussel
RA-22-0023, Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 321 January 2022Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 3Aging Management
License Renewal
Subsequent License Renewal
RA-22-0025, Supplemental Information for Relief Request to Utilize an Alternative Acceptance Criteria for Code Case, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material20 January 2022Supplemental Information for Relief Request to Utilize an Alternative Acceptance Criteria for Code Case, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for MaterialStress corrosion cracking
RA-22-0040, Subsequent License Renewal Application: Responses to NRC Request for Additional Information Set 321 February 2022Subsequent License Renewal Application: Responses to NRC Request for Additional Information Set 3Aging Management
Subsequent License Renewal
RA-22-0089, Response to Request for Additional Information Regarding Application to Revise Technical Specification 3.7.7, Low Pressure Service Water System, to Extend the Completion Time for One Required Inoperable LPSW14 April 2022Response to Request for Additional Information Regarding Application to Revise Technical Specification 3.7.7, Low Pressure Service Water System, to Extend the Completion Time for One Required Inoperable LPSWUnanalyzed Condition
Stroke time
Surveillance Frequency Control Program
Time Critical Operator Action
RA-22-0105, Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 422 March 2022Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 4Fire Barrier
Aging Management
License Renewal
Subsequent License Renewal
Fire Protection Program
RA-22-0111, Subsequent License Renewal Application, Follow-up Request for Additional Information Set 2 and 3 Updates31 March 2022Subsequent License Renewal Application, Follow-up Request for Additional Information Set 2 and 3 UpdatesAging Management
Subsequent License Renewal
Thermography
RA-22-0124, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 422 April 2022Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 4Boric Acid
Coatings
Nondestructive Examination
Aging Management
Flow Accelerated Corrosion
Eddy Current Testing
Subsequent License Renewal
RA-22-0129, Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-320 April 2022Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-3Aging Management
Subsequent License Renewal
RA-22-0137, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a20 May 2022Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1aSubsequent License Renewal
RA-22-0145, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L11 May 2022Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-LAging Management
License Renewal
Subsequent License Renewal
RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility13 May 2022Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations FacilityHealth Physics Network
High winds
RA-22-0158, Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a8 June 2022Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2aAging Management
Subsequent License Renewal
Thermography
RA-22-0159, Subsequent License Renewal Application Response to ONS SLRA Request for Additional Information (RAI) 3.1.2-127 May 2022Subsequent License Renewal Application Response to ONS SLRA Request for Additional Information (RAI) 3.1.2-1Boric Acid
Aging Management
Subsequent License Renewal
RA-22-0160, Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.625 July 2022Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6Boric Acid
Hydrostatic
Aging Management
License Renewal
Subsequent License Renewal
Power Uprate
Measurement Uncertainty Recapture
Affidavit
RA-22-0192, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a2 September 2022Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4aAging Management
Stress corrosion cracking
License Renewal
Subsequent License Renewal
EVT-1
Affidavit
RA-22-0193, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b8 July 2022Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4bStress corrosion cracking
Subsequent License Renewal
Affidavit
RA-22-0270, Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations7 October 2022Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations
RA-23-0051, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities9 March 2023Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement ActivitiesIncorporated by reference
Commercial Grade
RA-23-0104, Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report26 April 2023Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report
RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)20 July 2023Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)Non-Destructive Examination
RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require7 July 2023Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance RequireIncorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)20 June 2023Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)FLEX
License Renewal
Subsequent License Renewal
Environmental Justice
Power Uprate
Measurement Uncertainty Recapture
RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)20 July 2023Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Non-Destructive Examination
Weld Overlay
Finite Element Analysis
RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)12 October 2023Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)Subsequent License Renewal