Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML04184011430 April 2004Engineering Report GE-NE-0000-0023-1250-1, Rev 0, Browns Ferry, Units 1, 2 and 3, Steam Dryer Analysis for Extended Power Uprate Conditions.Safe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
Earthquake
Flow Induced Vibration
ML04184011630 June 2004Proposed Technical Specifications Change TS-431, Extended Power Uprate UFSAR Review Matrix, Enclosure 6Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Non-Destructive Examination
Stroke time
Anticipated operational occurrence
Time to boil
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Finite Element Analysis
Significance Determination Process
Feedwater Controller Failure
Large early release frequency
MELLLA
Turbine Missile
Fuel cladding
Fire Protection Program
Flow Induced Vibration
GOTHIC
Power Uprate
Failure to Scram
ML04184041330 April 2004Engineering Report, Steam Dryer Analysis for Extended Power Uprate ConditionsSafe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
Earthquake
Flow Induced Vibration
ML0420803362 July 2004Response to Request for Additional Information Related to Technical Specifications Change No. TS-405 Alternative Source TermSafe Shutdown
Ultimate heat sink
Grab sample
Design basis earthquake
Earthquake
ML04233056318 March 2004TVA Systems and Analysis Browns Ferry Nuclear Plant, Probabilistic Safety Assessment Unit 3.Summary Report Rev. 1, January 2003Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML04238024331 August 2003Tennessee Valley Authority System and Analysis Browns Ferry Nuclear Plant, Probabilistic Safety Assessment, Certification and Per ResolutionSafe Shutdown
Mission time
Finite Element Analysis
Large early release frequency
Hardened vent
ML04280005227 May 2004Zebra Mussels: Biology, Impacts, and Control, Chapter 13Zebra Mussel
ML04280006531 July 2003Regional Electricity Supply & Demand Projections (Energy Information Agency (EIA)-411). Annual 617 Report of EIA-411 Submittals (Eventually Provided to the U.S. Department of Energy), July 31, 2003
ML04338032115 November 2004American Society of Mechanical Engineers Section XI, in Service Inspection ProgramProbabilistic Risk Assessment
Finite Element Analysis
Aging Management
EVT-1
ML05035027231 January 2005Biennial 10CFR 50.59, 10CFR 72.48 and Commitment Revision Reports for the Period 1/1/2003 Through 12/31/04Overtravel
ML05077037011 March 2005Technical Specifications (TS) Change TS-447, Request for Additional Information (RAI) - Extension of Channel Calibration Surveillance Requirement Performance Frequency and Allowable Value RevisionSafe Shutdown Earthquake
ML05117024225 April 2005(BFN) - Units 2, and 3 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-418 - Request for Extended Power Uprate OperationShutdown Margin
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Flow Induced Vibration
Coast down
ML05117024425 April 2005(BFN) - Unit 1 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-431 - Request for Extended Power Uprate OperationSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Feedwater Controller Failure
Earthquake
Flow Induced Vibration
Coast down
ML05130046227 April 2005Technical Specifications Change 438- Response to Request for Additional Information Regarding Excess Flow Check Valve Surveillance Test FrequencyHydrostatic
ML05136015512 August 1994IPE-PRA Revision 1, Unit 2.
ML05136016213 April 1995IPE-PRA Revision 1A, Unit 2.
ML05161049127 May 2005Report to the General Manager from the Director, Division of Licensing and Regulation, Entitled, Policy Aspects of the Peach Bottom Case
ML0603806712 February 2006Response to NRC Request for Additional Information Regarding Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities - Submittal of Browns Ferry Unit 1 Seismic and Internal Fires IPEEE ReportsHot Short
Safe Shutdown
High winds
Ultimate heat sink
Probabilistic Risk Assessment
Aging Management
Significance Determination Process
Design basis earthquake
License Renewal
Earthquake
ML06038067426 March 2004Seismic - Induced Ii/I Spray Evaluations at Browns Ferry Nuclear Plant Unit 1Safe Shutdown
Seismically rugged
Design basis earthquake
Earthquake
ML06062054827 February 2006Brown Ferry Nuclear EPU Containment Overpressure (COP) Credit Risk Assessment.
ML06068059330 November 1992Copies of Material Provided to Us Fish and Wildlife Service
ML06068059628 February 2005Hydrothermal Modeling of Browns Ferry with Units 1, 2, and 3 at Extended Power UprateUltimate heat sink
ML06068059931 March 2001Bear Creek Reservoirs Land Management Plan
ML06072025323 May 1975May 23, 1975 - Final Summary Report Unit 2 StartupPower change
Flow Induced Vibration
ML0607202729 May 1977May 9, 1977 - Final Summary Report Unit 3 StartupShutdown Margin
Grab sample
Stroke time
Fuel cladding
Power change
Flow Induced Vibration
ML06072027330 November 1992a Guide for Environmental and Best Management Practices for Tennessee Valley Authority Transmission Construction and Maintenance Activities
ML06072029328 February 2005Hydrothermal Modeling of Browns Ferry Nuclear Plant with Units 1, 2, and 3 at Extended Power UprateUltimate heat sink
ML06072035431 March 2006GE-NE-0000-0049-6652-01NP, Rev 0, General Electric Boiling Water Reactor Steam Dryer Scale Model Test Based Fluctuating Load Definition Methodology, March 2006 Benchmark ReportFinite Element Analysis
Flow Induced Vibration
ML0607204301 March 2006March 1, 2006 Public Meeting Slides for Proposed Generic Letter Post-Fire Safe-Shutdown Circuit Analysis Spurious Actuations.Hot Short
Safe Shutdown
Significance Determination Process
Thermoset
Exemption Request
Fire Protection Program
Backfit
ML06079036728 February 2006NPDES Permit PA0009733
ML06088041321 March 2006EPU Containment Overpressure Credit Risk Assessment, Rev. 1High winds
Mission time
Internal Flooding
Probabilistic Risk Assessment
Coatings
Large early release frequency
ML06088046421 March 2006BFN EPU Containment Overpressure (COP) Credit Risk Assessment, Rev. 1High winds
Mission time
Internal Flooding
Probabilistic Risk Assessment
Coatings
Large early release frequency
ML06107063230 April 2006Units 1, 2, & 3 - GENE-0000-0052-3661-01-NP, Test Report #1, Browns Ferry Nuclear Plant; Unit 1, Scale Model Test.
ML06130044131 May 2006C.D.I. Report 06-11, Rev 1, Hydrodynamic Loads on Browns Ferry, Unit 1 Steam Dryer to 200 Hz.
ML06130044331 May 2006GE-NE-0000-0053-7413-R0-NP, Browns Ferry, Units 1, 2 & 3 Steam Dryer Stress, Dynamic and Fatigue Analyses for EPU Conditions.Finite Element Analysis
Earthquake
Flow Induced Vibration
ML06145039515 May 20060043-8325-SRLR, Revision 1, Supplemental Reload Licensing Report for Brown Ferry 1, Reload 6 Cycle 7, Cover Through Page 122Shutdown Margin
Anticipated operational occurrence
MELLLA
ML06145039715 May 20060043-8325-SRLR, Revision 1, Supplemental Reload Licensing Report for Brown Ferry 1, Reload 6 Cycle 7, Pages 123 Through EndSafety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
ML06167015112 June 2006Extended Power Uprate (EPU) - Reload Analysis ReportShutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Abnormal operational transient
Feedwater Controller Failure
MELLLA
Fuel cladding
ML06209048210 July 2006BFN EPU Containment Overpressure (COP) Credit Risk Assessment, Rev. 2High winds
Mission time
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML06213034331 July 2006C.D.I. Report No. 06-11, Revision 2, Hydrodynamic Loads on Browns Ferry Nuclear Unit 1 Steam Dryer to 200 Hz.
ML06220027726 July 2006Technical Specifications (TS) Changes TS-431 & TS-418 - Extended Power Uprate (EPU) - Response to Round 7 Requests for Additional InformationVT-2
Finite Element Analysis
Flow Induced Vibration
ML06221010227 June 2006Technical Specifications (TS) Change TS-431 & TS-418 Extended Power Uprate (EPU) - Replacement Cooling TowerLicense Renewal
Power Uprate
ML06240047730 June 2006GENE-0000-0055-2994-R1-NP, Addendum to Browns Ferry Nuclear Plant Units 1, 2, and 3 Steam Dryer Stress, Dynamic, and Fatigue Analyses for EPU Conditions.
ML06251038531 May 2006Enclosure 3, Browns Ferry, Units 1, 2 & 3 - CDI Report No. 05-28P, Rev 1, Bounding Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements.
ML06279023231 August 2006Engineering Report, GE-NE-0000-0053-7413-R4-NP, Browns Ferry, Units 1, 2 and 3 - Steam Dryer Stress, Dynamic and Fatigue Analyses for EPU Conditions.Finite Element Analysis
Earthquake
Flow Induced Vibration
ML06292015613 September 2006Rev 1 to Technical Specification, NPSH Transient Study RHR and Core Spray Pumps, E12.5.1296
ML0631004421 November 2006Supplemental Information - Changes to Instrumentation Surveillance Test Intervals and Allowed Out-of-Service TimesReactor Vessel Water Level
Half scram
Stroke time
Scram Discharge Volume
ML0631802432 November 2006Gnf Additional Information Regarding the Requested Changes to Technical Specification SLMCPR, Cycle 7Anticipated operational occurrence
Minimum Critical Power Ratio
ML06325025816 November 2006Response to NRC Request for Additional Information Regarding TSTF-475, Revision 0, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action, Dated March 21, 2005Probabilistic Risk Assessment
ML0634601317 December 2006Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS BarrierDeep Dose Equivalent
Fuel cladding