Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17251A83914 August 2017Wectec LLC - Closure of Interim 10 CFR Part 21 Report
ML17251A84119 June 2017Wectec LLC - Interim 10 CFR Part 21 Report Regarding a Reactor Coolant System Pipe Spool for V.C. Summer Unit 3 AP1000 Project
ML18361A58019 December 2018Stations, Units 1 & 2 - Part 21 Report Providing Updated Anchor Darling Double Disc Gate Valve Information and Repair StatusStroke time
Anchor Darling
ML19008A0434 January 2019Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146
ML19263A6669 September 2019Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518
ML20028D38013 January 202010CFR21 Notification for Ashcroft 2-1/2 & 3-1/2 1009, 63mm 2008, 63mm & 100mm 1008 Industrial Gauges, Weksler 3-1/2 Regal Gauges
NL-04-2459, 10 CFR 21 Report, Electric Power Research Institute Motor Operated Valve Performance Prediction Methodology Versions 1.0 Through 3.215 December 200410 CFR 21 Report, Electric Power Research Institute Motor Operated Valve Performance Prediction Methodology Versions 1.0 Through 3.2
NL-05-0317, 10 CFR 21 Interim Report Cutler-Hammer Freedom Series Model C306 Thermal Overload Relays and Heater Packs2 March 200510 CFR 21 Interim Report Cutler-Hammer Freedom Series Model C306 Thermal Overload Relays and Heater Packs
PLA-7629, Transmittal of 10CFR 21 Notification17 August 2017Transmittal of 10CFR 21 Notification
RA-17-059, Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues29 August 2017Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 IssuesAnchor Darling
ULNRC-04921, 10CFR21 Notification for GE Nuclear AKE-30 Low Voltage Circuit Breaker Upper Stud Assemblies, Part Number Q139C4632G120 November 200310CFR21 Notification for GE Nuclear AKE-30 Low Voltage Circuit Breaker Upper Stud Assemblies, Part Number Q139C4632G1