Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217F35825 March 1998Notice of Violation from Insp on 980201-0314.Violation Noted:On 980216,16 Retaining Washer Tabs on Six Completed Mechanical Nozzle Seal Assemblies Were Not Bent Against Flats in Corresponding Threaded Fasteners
ML20235S79916 February 1989Notice of Violation from Insp on 880111-890112.Violation Noted:Chemistry Technician Did Not Verify Use of Latest Procedure Rev for Performing Reactor Coolant Chemistry Sampling
ML20236V60422 July 1998Notice of Violation from Insp on 980607-0711.Violation Noted:Abnormal Operating Instruction S023-13-3,temporary Change Notice 4-2,not Appropriate for Circumstances in That Procedure Did Not Differentiate Between Various Weather
ML20238F3671 September 1987Notice of Violation from Insp on 870208-0404.Violations Noted:Four Bags of Contaminated Pcs,Several Yellow Poly Bags,Tools,Air Hoses,Scaffolding,Tape,Oil,Electric Cords,Kim Wipes,Wire & Dollies Found Present in Train a ESF Pump RoomScaffolding
ML20246B57622 June 1989Notice of Violation from Insp on 881021-890410.Violation Noted:Refrigerant (Freon) Levels Necessary to Assure Operability of Emergency Chillers Were Not Properly Translated Into Procedures
ML20246P8955 May 1989Notice of Violation from Insp on 890313-0403.Violation Noted:On 881222,worker Not Informed of Storage of Radioactive Matl & Radiation Levels in Portions of Steam Generator a Platform & Not Instructed in Precautions
ML20247B13125 August 1989Notice of Violation from Insp on 890617-0729.Violations Noted:Adv HV-8419 Manually Closed at Local Station,Returned to Automatic Svc & Declared Operable W/Controller Equalizing Valve Left Open
ML20248C36127 May 1998Notice of Violation from Insp on 980315-0425.Violation Noted:Instrument & Control Technicians Failed to Implement Procedure SO123-II-9-3