RA-20-0353, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1) | 24 February 2021 | Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1) | Fitness for Duty Ultimate heat sink Non-Destructive Examination Safe Shutdown Earthquake Coatings Operating Basis Earthquake Finite Element Analysis Foreign Material Exclusion Exemption Request Affidavit |
RA-21-0198, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 25 | 21 June 2021 | Inservice Inspection Program Owner'S Activity Report for Refueling Outage 25 | |
RA-21-0312, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) | 22 November 2021 | Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) | Post Accident Monitoring |
RA-22-0165, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24 | 9 June 2022 | Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24 | |
RNP-RA/02-0028, Request for Technical Specifications Change Re One-Time Extension of Containment Type a Test Interval | 26 March 2002 | Request for Technical Specifications Change Re One-Time Extension of Containment Type a Test Interval | |
RNP-RA/06-0048, Request for Technical Specifications, Change Related to Containment Peak Pressure | 17 July 2006 | Request for Technical Specifications, Change Related to Containment Peak Pressure | Ultimate heat sink |
RNP-RA/06-0062, Groundwater Protection - Data Collection Questionnaire | 24 July 2006 | Groundwater Protection - Data Collection Questionnaire | |
RNP-RA/08-0026, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 7 March 2008 | Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Boric Acid High Radiation Area Fire Barrier Coatings Foreign Material Exclusion Stress corrosion cracking Exemption Request Scaffolding Manual Operator Action |
RNP-RA/11-0100, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System | 23 November 2011 | Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System | |
RNP-RA/13-0037, Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 2012 | 25 April 2013 | Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 2012 | |
RNP-RA/13-0066, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication | 24 June 2013 | Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication | Post Accident Monitoring |
RNP-RA/13-0079, Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter | 21 August 2013 | Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter | Post Accident Monitoring |
RNP-RA/14-0012, Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3.... | 12 March 2014 | Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3.... | |
RNP-RA/14-0037, Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System | 8 April 2014 | Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System | |
RNP-RA/15-0018, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel | 26 February 2015 | Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel | Post Accident Monitoring |
RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) | 19 August 2015 | Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Mission time Fire Barrier Tornado Missile Time to boil FLEX B.5.b Fukushima Dai-Ichi Severe Accident Management Guideline Time Critical Operator Action Earthquake Scaffolding Weak link GOTHIC Unidentified leakage |
RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 | 25 May 2016 | Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 | Hot Short Safe Shutdown High winds Mission time Fire Barrier Time to boil Enforcement Discretion Probabilistic Risk Assessment Fire impairment Operator Manual Action Multiple Spurious Operation Significance Determination Process Thermoset Large early release frequency Exemption Request Fire Protection Program Fire Watch Very Early Warning Fire Detection |
RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors | 5 October 2016 | Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors | Post Accident Monitoring |
RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors | 31 October 2016 | Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors | Post Accident Monitoring |
RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2) | 2 April 2018 | Report of Changes Pursuant to 10 CFR 50.59(d)(2) | Unanalyzed Condition Open Phase Condition Fire Watch Overspeed trip |