 Issue dateTitleTopic
RA-20-0353, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1)24 February 2021Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1)Fitness for Duty
Ultimate heat sink
Non-Destructive Examination
Safe Shutdown Earthquake
Coatings
Operating Basis Earthquake
Finite Element Analysis
Foreign Material Exclusion
Exemption Request
Affidavit
RA-21-0198, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2521 June 2021Inservice Inspection Program Owner'S Activity Report for Refueling Outage 25
RA-21-0312, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)22 November 2021Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)Post Accident Monitoring
RA-22-0165, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 249 June 2022Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24
RNP-RA/02-0028, Request for Technical Specifications Change Re One-Time Extension of Containment Type a Test Interval26 March 2002Request for Technical Specifications Change Re One-Time Extension of Containment Type a Test Interval
RNP-RA/06-0048, Request for Technical Specifications, Change Related to Containment Peak Pressure17 July 2006Request for Technical Specifications, Change Related to Containment Peak PressureUltimate heat sink
RNP-RA/06-0062, Groundwater Protection - Data Collection Questionnaire24 July 2006Groundwater Protection - Data Collection Questionnaire
RNP-RA/08-0026, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors7 March 2008Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorsBoric Acid
High Radiation Area
Fire Barrier
Coatings
Foreign Material Exclusion
Stress corrosion cracking
Exemption Request
Scaffolding
Manual Operator Action
RNP-RA/11-0100, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System23 November 2011Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System
RNP-RA/13-0037, Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 201225 April 2013Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 2012
RNP-RA/13-0066, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication24 June 2013Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve IndicationPost Accident Monitoring
RNP-RA/13-0079, Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter21 August 2013Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure TransmitterPost Accident Monitoring
RNP-RA/14-0012, Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3....12 March 2014Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3....
RNP-RA/14-0037, Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System8 April 2014Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System
RNP-RA/15-0018, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel26 February 2015Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux ChannelPost Accident Monitoring
RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)19 August 2015Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Mission time
Fire Barrier
Tornado Missile
Time to boil
FLEX
B.5.b
Fukushima Dai-Ichi
Severe Accident Management Guideline
Time Critical Operator Action
Earthquake
Scaffolding
Weak link
GOTHIC
Unidentified leakage
RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-17425 May 2016Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174Hot Short
Safe Shutdown
High winds
Mission time
Fire Barrier
Time to boil
Enforcement Discretion
Probabilistic Risk Assessment
Fire impairment
Operator Manual Action
Multiple Spurious Operation
Significance Determination Process
Thermoset
Large early release frequency
Exemption Request
Fire Protection Program
Fire Watch
Very Early Warning Fire Detection
RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors5 October 2016Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation MonitorsPost Accident Monitoring
RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors31 October 2016Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation MonitorsPost Accident Monitoring
RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2 April 2018Report of Changes Pursuant to 10 CFR 50.59(d)(2)Unanalyzed Condition
Open Phase Condition
Fire Watch
Overspeed trip