Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
TMI-10-023, Response to Request for Additional Information Re Request for Exemption from 10 CFR 50, Appendix R, Section Iii.G, Fire Protection of Safe Shutdown Capability15 March 2010Response to Request for Additional Information Re Request for Exemption from 10 CFR 50, Appendix R, Section Iii.G, Fire Protection of Safe Shutdown CapabilityHot Short
Safe Shutdown
Fire Barrier
Operator Manual Action
Emergency Lighting
Thermoset
Exemption Request
Fire Protection Program
TMI-10-029, Biennial 10 CFR 50.59 and Commitment Revision Reports for 2008 and 200915 April 2010Biennial 10 CFR 50.59 and Commitment Revision Reports for 2008 and 2009Tornado Missile
Internal Flooding
B.5.b
TMI-10-030, Annual Radiological Environmental Operating Report28 April 2010Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Chernobyl
Tritium
TMI-10-031, Combined 2009 Annual Radioactive Effluent Release Reports28 April 2010Combined 2009 Annual Radioactive Effluent Release ReportsShutdown Margin
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
TMI-10-035, Technical Specification Change Request No. 351: Maximum Allowable Power with Inoperable Main Steam Safety Valves24 September 2010Technical Specification Change Request No. 351: Maximum Allowable Power with Inoperable Main Steam Safety ValvesShutdown Margin
Anticipated operational occurrence
Power change
TMI-10-040, Cycle 18 Startup Report23 April 2010Cycle 18 Startup ReportShutdown Margin
TMI-10-046, Submittal of Changes to Technical Specifications Bases22 April 2010Submittal of Changes to Technical Specifications BasesSafe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Incorporated by reference
Missed surveillance
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Operability Determination
Earthquake
Power-Operated Valves
Power Operated Valves
Fuel cladding
Fire Protection Program
Power change
Unidentified leakage
TMI-10-052, CFR 50.46 Report14 May 2010CFR 50.46 Report
TMI-10-053, Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld and Internal Examinations - Relief Requests RR-09-01 and RR-09-0224 May 2010Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld and Internal Examinations - Relief Requests RR-09-01 and RR-09-02
TMI-10-054, Technical Specifications Change Request (Tscr) No. 348 Relocation of Equipment Load List from TS 4.5.1.1 B, Sequence and Power Transfer Test, to the Updated Final Safety Analysis Report22 September 2010Technical Specifications Change Request (Tscr) No. 348 Relocation of Equipment Load List from TS 4.5.1.1 B, Sequence and Power Transfer Test, to the Updated Final Safety Analysis ReportProbabilistic Risk Assessment
Fuel cladding
TMI-10-069, Supplement to Cycle 17 Refueling (T1R18) Inservice Inspection (ISI) Summary Report7 July 2010Supplement to Cycle 17 Refueling (T1R18) Inservice Inspection (ISI) Summary Report
TMI-10-072, Response to Request for Additional Information, Application for Technical Specifications Change Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program29 July 2010Response to Request for Additional Information, Application for Technical Specifications Change Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled ProgramSurveillance Frequency Control Program
TMI-10-079, Submittal of Relief Requests Associated with the Fourth Inservice Inspection Interval10 August 2010Submittal of Relief Requests Associated with the Fourth Inservice Inspection IntervalWeld Overlay
Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Dissimilar Metal Weld
TMI-10-080, Response to Request for Additional Information, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled27 September 2010Response to Request for Additional Information, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee ControlledProbabilistic Risk Assessment
Surveillance Frequency Control Program
TMI-10-084, 10 CFR 50.46 30-Day Report Re Results of the Most Recent Small Break LOCA Analysis7 September 201010 CFR 50.46 30-Day Report Re Results of the Most Recent Small Break LOCA Analysis
TMI-10-095, (TMI-1) Renewed Operating License No. DPR-50 Docket No. 50-28 - Revision of Scheduling Operator Examinations28 October 2010(TMI-1) Renewed Operating License No. DPR-50 Docket No. 50-28 - Revision of Scheduling Operator Examinations
TMI-10-100, Submittal of Relief Request RR-10-02 Re Weld Overlay of the Pressurizer Spray Nozzle to Safe-End & Safe-End to Elbow Dissimilar Metal Welds30 September 2010Submittal of Relief Request RR-10-02 Re Weld Overlay of the Pressurizer Spray Nozzle to Safe-End & Safe-End to Elbow Dissimilar Metal WeldsWeld Overlay
Hydrostatic
Nondestructive Examination
Liquid penetrant
Dissimilar Metal Weld
TMI-10-101, Three Mile, Unit 1, Supplemental Information Request - Fourth Inservice Inspection (ISI) Interval Relief Request I4R-028 October 2010Three Mile, Unit 1, Supplemental Information Request - Fourth Inservice Inspection (ISI) Interval Relief Request I4R-02Probabilistic Risk Assessment
Seismically rugged
TMI-10-102, Submittal of Relief Request RR-10-01 Concerning Control Rod Drive Housing Examinations Associated with the Third Inservice Inspection (Lsi) Interval13 October 2010Submittal of Relief Request RR-10-01 Concerning Control Rod Drive Housing Examinations Associated with the Third Inservice Inspection (Lsi) IntervalVT-2
TMI-10-111, Submittal of Relief Requests Associated with the Fourth Inservice Inspection (ISI) Interval - Relief Request I4R-0129 October 2010Submittal of Relief Requests Associated with the Fourth Inservice Inspection (ISI) Interval - Relief Request I4R-01
TMI-11-007, Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection Interval25 January 2011Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection IntervalProbabilistic Risk Assessment
Large early release frequency
TMI-11-012, 2010 Annual Report23 February 20112010 Annual ReportPacking leak
TMI-11-017, Submittal of Relief Request RR-11-01 and RR-11-0210 February 2011Submittal of Relief Request RR-11-01 and RR-11-02Liquid penetrant
TMI-11-026, Decommissioning Funding Status Report30 March 2011Decommissioning Funding Status Report
TMI-11-030, Response to Request for Additional Information - Submittal of Relief Request RR-10-02 Concerning the Weld Overlay of the Pressurizer Spray Nozzle to Safe-End and Safe-End to Elbow Dissimilar Metal Welds9 March 2011Response to Request for Additional Information - Submittal of Relief Request RR-10-02 Concerning the Weld Overlay of the Pressurizer Spray Nozzle to Safe-End and Safe-End to Elbow Dissimilar Metal WeldsWeld Overlay
Dissimilar Metal Weld
TMI-11-056, Response to Request for Additional Information, Proposed Technical Specification Changes Regarding Relocation of Equipment Load List from Technical Specifications to a Licensee Controlled Document7 April 2011Response to Request for Additional Information, Proposed Technical Specification Changes Regarding Relocation of Equipment Load List from Technical Specifications to a Licensee Controlled DocumentEmergency Lighting
Surveillance Frequency Control Program
Fuel cladding
TMI-11-058, Combined 2010 Annual Radioactive Effluent Release Report27 April 2011Combined 2010 Annual Radioactive Effluent Release ReportShutdown Margin
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Incorporated by reference
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Fire Protection Program
Power change
TMI-11-059, 2010 Environmental Monitoring Program Report for 01/01 - 12/31/201030 April 20112010 Environmental Monitoring Program Report for 01/01 - 12/31/2010High winds
Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Chernobyl
Tritium
TMI-11-060, Response to a Request for Additional Information - Relief Request RR-10-01 Concerning Control Rod Drive Housing Examinations Associated with the Third Inservice Inspection Interval5 April 2011Response to a Request for Additional Information - Relief Request RR-10-01 Concerning Control Rod Drive Housing Examinations Associated with the Third Inservice Inspection IntervalNondestructive Examination
VT-2
Liquid penetrant
TMI-11-062, Response to Request for Additional Information - Submittal of Relief Request RR-10-02 Concerning the Weld Overlay of the Pressurizer Spray Nozzle to Safe-End and Safe-End to Elbow Dissimilar Metal Welds6 April 2011Response to Request for Additional Information - Submittal of Relief Request RR-10-02 Concerning the Weld Overlay of the Pressurizer Spray Nozzle to Safe-End and Safe-End to Elbow Dissimilar Metal WeldsSafe Shutdown Earthquake
Weld Overlay
Hydrostatic
Nondestructive Examination
Finite Element Analysis
Earthquake
Dissimilar Metal Weld
TMI-11-064, Submittal of Changes to Technical Specifications Bases15 April 2011Submittal of Changes to Technical Specifications BasesSafe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Incorporated by reference
Missed surveillance
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Operability Determination
Earthquake
Power-Operated Valves
Power Operated Valves
Fuel cladding
Fire Protection Program
Power change
Unidentified leakage
TMI-11-068, Comments on Draft Director'S Decision18 April 2011Comments on Draft Director'S Decision
TMI-11-075, Response to Request for Additional Information Related to Technical Specification Change Request No. 351 Maximum Allowable Power with Inoperable Main Steam Safety Valves21 April 2011Response to Request for Additional Information Related to Technical Specification Change Request No. 351 Maximum Allowable Power with Inoperable Main Steam Safety Valves
TMI-11-077, Supplemental Response to Request for Additional Information Related to Technical Specification Change Request No. 351: Maximum Allowable Power with Inoperable Main Steam Safety Valves.27 May 2011Supplemental Response to Request for Additional Information Related to Technical Specification Change Request No. 351: Maximum Allowable Power with Inoperable Main Steam Safety Valves.Shutdown Margin
TMI-11-078, Response to Request for Additional Information - Submittal of Relief Request RR-10-02 Concerning the Weld Overlay of the Pressurizer Spray Nozzle to Safe-End and Safe-End to Elbow Dissimilar Metal Welds25 April 2011Response to Request for Additional Information - Submittal of Relief Request RR-10-02 Concerning the Weld Overlay of the Pressurizer Spray Nozzle to Safe-End and Safe-End to Elbow Dissimilar Metal WeldsSafe Shutdown Earthquake
Weld Overlay
Hydrostatic
Earthquake
Dissimilar Metal Weld
TMI-11-080, Request, Procedure to Be Implemented 12/07/10 to Return to Records Management Department4 May 2011Request, Procedure to Be Implemented 12/07/10 to Return to Records Management Department
TMI-11-084, Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection (ISI) Interval11 May 2011Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection (ISI) Interval
TMI-11-086, Submittal of 10 CFR 50.46 Annual Report13 May 2011Submittal of 10 CFR 50.46 Annual Report
TMI-11-090, Supplement to Exelon Cyber Security Plan19 May 2011Supplement to Exelon Cyber Security PlanCyber Security
TMI-11-103, License Amendment Request to Revise Technical Specifications to Incorporate Administrative Changes18 October 2011License Amendment Request to Revise Technical Specifications to Incorporate Administrative ChangesShutdown Margin
Reactor Vessel Water Level
High Radiation Area
Offsite Dose Calculation Manual
Hydrostatic
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Power Operated Valves
TMI-11-115, Update 9 of the Post-Defueling Monitored Storage Safety Analysis Report24 August 2011Update 9 of the Post-Defueling Monitored Storage Safety Analysis ReportOffsite Dose Calculation Manual
Emergency Lighting
Tornado Generated Missile
Earthquake
TMI-11-128, Response to Request for Additional Information - Relief Request RR-11-01 and RR-11-0230 August 2011Response to Request for Additional Information - Relief Request RR-11-01 and RR-11-02
TMI-11-147, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1327 October 2011Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 13
TMI-11-153, Response to Request for Additional Information Related to the Decommissioning Funding Status Report2 November 2011Response to Request for Additional Information Related to the Decommissioning Funding Status Report
TMI-11-157, Cycle 19 Core Operating Limits Report, COLR TMI 1, Revision 816 November 2011Cycle 19 Core Operating Limits Report, COLR TMI 1, Revision 8Boric Acid
Shutdown Margin
TMI-11-158, Submittal of Relief Request PR-05 Associated with the Fourth Inservice Testing (IST) Interval28 October 2011Submittal of Relief Request PR-05 Associated with the Fourth Inservice Testing (IST) Interval
TMI-11-166, Closeout of Commitment Associated with Relief Request RR-1 0-02 Concerning the Weld Overlay of Pressurizer Spray Nozzle to Safe-End and Safe-End to Elbow Dissimilar Metal Welds and Completion of Inspection.2 December 2011Closeout of Commitment Associated with Relief Request RR-1 0-02 Concerning the Weld Overlay of Pressurizer Spray Nozzle to Safe-End and Safe-End to Elbow Dissimilar Metal Welds and Completion of Inspection.Weld Overlay
Dissimilar Metal Weld
TMI-11-171, Response to Request for Additional Information Related to the Proposed Administrative Changes to the Technical Specifications20 January 2012Response to Request for Additional Information Related to the Proposed Administrative Changes to the Technical Specifications
TMI-12-001, Correction of Steam Generator Tube Gap Size.17 January 2012Correction of Steam Generator Tube Gap Size.
TMI-12-006, Submittal of Decommissioning Funding Status Report30 March 2012Submittal of Decommissioning Funding Status Report