TMI-11-080, Request, Procedure to Be Implemented 12/07/10 to Return to Records Management Department

From kanterella
Jump to navigation Jump to search
Request, Procedure to Be Implemented 12/07/10 to Return to Records Management Department
ML11126A312
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/04/2011
From: Atherholt D
Exelon Nuclear, Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TMI-11-080
Download: ML11126A312 (1)


Text

ExelI n.

Nuclear May 04, 2011 TMI-1 1-080 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Procedure to be implemented 12/07/10

References:

(1) Letter from TMI Records Management to The Document Control Desk (U.S. NRC, "Procedure to be Implemented 12/07/10," dated December 6, 2010 In the Reference 1 letter, Three Mile Island Nuclear Power Station, Unit 1 (TMI Unit 1) submitted the Exelon Generation Company, LLC (Exelon) Quality Assurance Topical Report (QATR), NO-AA-10, Revision 85. TMI Unit 1has determined that the Reference 1 submittal was not required.

Every two years Exelon submits an updated revision of the Exelon QATR, NO-AA-1 0 to satisfy the 10 CFR 50.54(a)(3) requirements. The Exelon QATR submittal is on behalf of the Exelon fleet and includes TMI Unit 1.

Based on the above, TMI Unit 1 requests that the document submitted by Reference 1 be returned to the TMI Unit 1 Records Management Department.

If any additional information is needed, please contact Michael Fitzwater at (717) 948-8228.

Respectfully, David Atherholt Manager - Site Regulatory Affairs Three Mile Island Nuclear Power Station cc: USNRC Project Manager, TMI, Unit 1 USNRC Senior Resident Inspector, TMI, Unit 1

-,HY2