Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-02-110, Request for Amendment to Technical Specifications Table 3.3.8.1-1, Loss of Power Instrumentation.8 July 2002Request for Amendment to Technical Specifications Table 3.3.8.1-1, Loss of Power Instrumentation.Reactor Vessel Water Level
RS-02-111, Registration of Use of Cask to Store Spent Fuel11 June 2002Registration of Use of Cask to Store Spent Fuel
RS-02-119, Request for Amendment to Technical Specification 3.2.2, Minimum Critical Power Ratio (Mcpr), Addition of a New Surveillance Requirement31 July 2002Request for Amendment to Technical Specification 3.2.2, Minimum Critical Power Ratio (Mcpr), Addition of a New Surveillance RequirementAnticipated operational occurrence
RS-02-122, Justification for Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure & Temperature (P/T) Limits.19 July 2002Justification for Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure & Temperature (P/T) Limits.
RS-02-123, Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations.18 July 2002Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
RS-02-124, Additional Information Regarding Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (Reactor Vessel Steam Dome Pressure - High)8 July 2002Additional Information Regarding Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (Reactor Vessel Steam Dome Pressure - High)Reactor Vessel Water Level
RS-02-125, Letter from Patrick R. Simpson Subject: Supplement to Response to Request for Additional Information Regarding Heavy Loads Handling8 July 2002Letter from Patrick R. Simpson Subject: Supplement to Response to Request for Additional Information Regarding Heavy Loads HandlingSafe Shutdown Earthquake
Operating Basis Earthquake
Control of Heavy Loads
RS-02-126, Supplemental Information Supporting Request for Technical Specification Changes for Minimum Critical Power Ratio Safety Limit3 July 2002Supplemental Information Supporting Request for Technical Specification Changes for Minimum Critical Power Ratio Safety Limit
RS-02-128, Request for Exemption from Certain Requirements of 10 CFR 55.592 July 2002Request for Exemption from Certain Requirements of 10 CFR 55.59Job Performance Measure
Exemption Request
RS-02-129, Revision to Request for Exemption from 10CFR 55.598 July 2002Revision to Request for Exemption from 10CFR 55.59Enforcement Discretion
Job Performance Measure
Exemption Request
RS-02-132, Submittal of Power Uprate Ascension Test Report for Quad Cities Nuclear Power Station, Unit 212 July 2002Submittal of Power Uprate Ascension Test Report for Quad Cities Nuclear Power Station, Unit 2Flow Induced Vibration
RS-02-133, Partial Withdrawal of Request for NRC Approval of Amendment to Permit Continued Fuel Movement with Inoperable Refueling Equipment Interlocks16 July 2002Partial Withdrawal of Request for NRC Approval of Amendment to Permit Continued Fuel Movement with Inoperable Refueling Equipment Interlocks
RS-02-137, Power Uprate Ascension Test Report1 August 2002Power Uprate Ascension Test ReportShutdown Margin
Temporary Modification
Flow Induced Vibration
RS-02-140, Supplemental Response to Commission Order to Modify License for Interim Safeguards and Security Measures for Interim Compensatory Measure B.4.e1 August 2002Supplemental Response to Commission Order to Modify License for Interim Safeguards and Security Measures for Interim Compensatory Measure B.4.e
RS-02-141, Revised Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations.7 August 2002Revised Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
RS-02-143, Units 1 & 2 Additional Information Supporting License Amendment Request on Technical Specifications Surveillance Requirement for Containment Spray Nozzles9 September 2002Units 1 & 2 Additional Information Supporting License Amendment Request on Technical Specifications Surveillance Requirement for Containment Spray NozzlesBoric Acid
Nondestructive Examination
Foreign Material Exclusion
RS-02-145, Supplemental Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit15 August 2002Supplemental Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit
RS-02-146, Revised Supplemental Response to Commission Order to Modify License for Interim Safeguards & Security Measures for Interim Compensatory Measure B.4.e14 August 2002Revised Supplemental Response to Commission Order to Modify License for Interim Safeguards & Security Measures for Interim Compensatory Measure B.4.e
RS-02-148, Long Term Solution Stability System Oscillation Power Range Monitor Revised Implementation Plan27 August 2002Long Term Solution Stability System Oscillation Power Range Monitor Revised Implementation Plan
RS-02-150, Additional Information Supporting the License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations23 August 2002Additional Information Supporting the License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power OperationsHydrostatic
Anchor Darling
RS-02-151, Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (Scram Discharge Volume Water Level - High)16 August 2002Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (Scram Discharge Volume Water Level - High)Reactor Vessel Water Level
Scram Discharge Volume
RS-02-154, Exelon/Amergen Thirty-Day Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs.11 September 2002Exelon/Amergen Thirty-Day Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs.Boric Acid
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Pressure Boundary Leakage
Through-Wall Leak
RS-02-155, Response to NRC Inspection Items Regarding Concrete Expansion Anchors11 September 2002Response to NRC Inspection Items Regarding Concrete Expansion Anchors
RS-02-156, Relief Request for Alternative Testing of Containment Sump Suction Valves 1/2SI8811A/B18 October 2002Relief Request for Alternative Testing of Containment Sump Suction Valves 1/2SI8811A/BStroke time
RS-02-158, Confirmation of Completion of Actions Implementing the Interim Compensatory Measures of the February 25, 2002, Commission Order to Modify License for Interim Safeguards and Security Measures12 September 2002Confirmation of Completion of Actions Implementing the Interim Compensatory Measures of the February 25, 2002, Commission Order to Modify License for Interim Safeguards and Security Measures
RS-02-160, Request for Amendment to TS 5.6.5, Core Operating Limits Report for Addition of New Analytical Methodology19 September 2002Request for Amendment to TS 5.6.5, Core Operating Limits Report for Addition of New Analytical Methodology
RS-02-163, Additional Information Supporting License Amendment Request to Revise Suppression Pool Water Level & Upper Containment Pool Water Level Requirements in Mode 34 October 2002Additional Information Supporting License Amendment Request to Revise Suppression Pool Water Level & Upper Containment Pool Water Level Requirements in Mode 3Reactor Vessel Water Level
GOTHIC
RS-02-164, Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.24 October 2002Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.Safe Shutdown
High winds
Fire Barrier
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Coatings
Tornado Generated Missile
Large early release frequency
Earthquake
Maintenance Rule Program
Turbine Missile
RS-02-165, Response to Request for Additional Information Re Excess Flow Check Valve Testing Surveillance and Relief Request RV-124 October 2002Response to Request for Additional Information Re Excess Flow Check Valve Testing Surveillance and Relief Request RV-12
RS-02-167, Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits.21 October 2002Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits.
RS-02-168, Request for License Amendment Related to Heavy Loads Handling26 September 2002Request for License Amendment Related to Heavy Loads HandlingSafe Shutdown
Design basis earthquake
Control of Heavy Loads
Affidavit
RS-02-169, Request for License Amendment Related to Appendix B, Environmental Protection Plan (Non-Radiological)27 September 2002Request for License Amendment Related to Appendix B, Environmental Protection Plan (Non-Radiological)
RS-02-171, Request for License Amendment Related to Heavy Loads Handling1 October 2002Request for License Amendment Related to Heavy Loads HandlingSafe Shutdown
Design basis earthquake
Earthquake
Control of Heavy Loads
Affidavit
RS-02-173, Request for License Amendment to Add Technical Specification Surveillance Requirement for Diesel Driven Auxiliary Feedwater Pump12 December 2002Request for License Amendment to Add Technical Specification Surveillance Requirement for Diesel Driven Auxiliary Feedwater Pump
RS-02-175, Request for Technical Specification Changes Related to Main Steam Safety Valve Operability Requirements10 October 2002Request for Technical Specification Changes Related to Main Steam Safety Valve Operability Requirements
RS-02-179, Request for Technical Specification Change Extension of Completion Time for Instrument Bus Inverters16 October 2002Request for Technical Specification Change Extension of Completion Time for Instrument Bus InvertersHigh winds
Anticipated operational occurrence
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
RS-02-182, Letter Regards Additional Information Supporting Request for TS Change for Minimum Critical Power Ratio Safety Limit18 October 2002Letter Regards Additional Information Supporting Request for TS Change for Minimum Critical Power Ratio Safety LimitSafety Limit Minimum Critical Power Ratio
RS-02-185, Additional Information Regarding Request for License Amendment Related to Heavy Loads Handling23 October 2002Additional Information Regarding Request for License Amendment Related to Heavy Loads HandlingControl of Heavy Loads
Affidavit
RS-02-187, Request for Relief from Certain Requirements of 10 CFR 50.55a(g)(4)(ii) Regarding Control Rod Drive Housing Welds (Relief Request Number CR-25)25 October 2002Request for Relief from Certain Requirements of 10 CFR 50.55a(g)(4)(ii) Regarding Control Rod Drive Housing Welds (Relief Request Number CR-25)VT-2
Liquid penetrant
Through-Wall Leak
RS-02-189, Withdrawal of Requested Amendment to Technical Specifications Excess Flow Check Valve Testing Surveillance and Relief Request RV-1230 October 2002Withdrawal of Requested Amendment to Technical Specifications Excess Flow Check Valve Testing Surveillance and Relief Request RV-12
RS-02-191, Revision 13 to Standardized Radiological Emergency Plan Annex5 November 2002Revision 13 to Standardized Radiological Emergency Plan Annex
RS-02-194, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station5 November 2002Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station
RS-02-196, Revised Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits.8 November 2002Revised Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits.Hydrostatic
RS-02-197, Reply to Request for Comments on Draft Response to Task Interface Agreement Concerning the Reactor Building Crane and Heavy Loads Handling11 November 2002Reply to Request for Comments on Draft Response to Task Interface Agreement Concerning the Reactor Building Crane and Heavy Loads HandlingSafe Shutdown
RS-02-203, Response to Request for Additional Information Regarding a License Amendment Request to Modify the Method of Controlling Unfavorable Exposure Time Related to an Anticipated Transient Without Scram Event26 November 2002Response to Request for Additional Information Regarding a License Amendment Request to Modify the Method of Controlling Unfavorable Exposure Time Related to an Anticipated Transient Without Scram Event
RS-02-205, Response to Request for Additional Information Supporting a License Amendment Request Revising TS Surveillance Requirements for Containment Spray Nozzles3 January 2003Response to Request for Additional Information Supporting a License Amendment Request Revising TS Surveillance Requirements for Containment Spray NozzlesForeign Material Exclusion
RS-02-208, Completion of Power Uprate Modifications for Dresden, Unit 3 and Quad Cities, Unit 113 December 2002Completion of Power Uprate Modifications for Dresden, Unit 3 and Quad Cities, Unit 1
RS-02-210, Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Annexes & Implementing Procedure16 December 2002Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Annexes & Implementing Procedure
RS-02-214, Response to Request for Additional Information Addressing Request for Amendment to Technical Specification 5.6.5, Core Operating Limits Report (Colr), for Addition of New Analytical Methodology26 December 2002Response to Request for Additional Information Addressing Request for Amendment to Technical Specification 5.6.5, Core Operating Limits Report (Colr), for Addition of New Analytical Methodology
RS-02-215, Request for License Amendment to Eliminate Main Steam Isolation Valve Closure & Low Condenser Vacuum Scram Functions During Startup Mode20 December 2002Request for License Amendment to Eliminate Main Steam Isolation Valve Closure & Low Condenser Vacuum Scram Functions During Startup ModeScram Discharge Volume
Fuel cladding