JAFP-04-0024, January 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant | 12 February 2004 | January 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant | |
JAFP-04-0035, February 2004 Monthly Operating Report for James a FitzPatrick | 10 March 2004 | February 2004 Monthly Operating Report for James a FitzPatrick | Frazil ice Downpower |
JAFP-04-0054, Annual Radioactive Effluent Release Report for the Period of January 1, 2003 Through December 31, 2003 | 21 April 2004 | Annual Radioactive Effluent Release Report for the Period of January 1, 2003 Through December 31, 2003 | Time of Discovery High winds Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
JAFP-04-0058, 2003 Personnel Radiation Exposure Summary Report | 22 April 2004 | 2003 Personnel Radiation Exposure Summary Report | |
JAFP-04-0062, Supplemental Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-For-Duty | 29 April 2004 | Supplemental Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-For-Duty | Enforcement Discretion |
JAFP-04-0069, Transmittal of Annual Radiological Environmental Operating Report for 2003 | 11 May 2004 | Transmittal of Annual Radiological Environmental Operating Report for 2003 | Annual Radiological Environmental Operating Report |
JAFP-04-0071, Response to Request for Information Regarding Proposed One Time Deferral of Integrated Containment Leak Rate Testing - Proposed Relief Request to James A. FitzPatrick Nuclear Power Plant (JAFNPP) ISI Program | 20 May 2004 | Response to Request for Information Regarding Proposed One Time Deferral of Integrated Containment Leak Rate Testing - Proposed Relief Request to James A. FitzPatrick Nuclear Power Plant (JAFNPP) ISI Program | Coatings Scaffolding |
JAFP-04-0072, 2nd Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval | 20 May 2004 | 2nd Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval | |
JAFP-04-0086, May 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant | 14 June 2004 | May 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant | Power change |
JAFP-04-0100, June 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant | 12 July 2004 | June 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant | Downpower |
JAFP-04-0101, Operator Licensing Examination Data | 12 July 2004 | Operator Licensing Examination Data | Generic Fundamentals Examination |
JAFP-04-0115, Response to Request for Additional Information Training and Qualification Plan | 22 July 2004 | Response to Request for Additional Information Training and Qualification Plan | Fitness for Duty |
JAFP-04-0117, Response to Request for Additional Information Regarding Proposed License Amendment to Safety Limit Minimum Critical Power Ratio (SLMCPR) | 27 July 2004 | Response to Request for Additional Information Regarding Proposed License Amendment to Safety Limit Minimum Critical Power Ratio (SLMCPR) | Minimum Critical Power Ratio |
JAFP-04-0119, Follow-up to Responses to Request for Additional Information Regarding Security Plan Sections 1 - 19 | 2 August 2004 | Follow-up to Responses to Request for Additional Information Regarding Security Plan Sections 1 - 19 | |
JAFP-04-0122, July 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant | 6 August 2004 | July 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant | Downpower |
JAFP-04-0123, Response to Request for Additional Information Regarding Safeguards Contingency Plan and Physical Security Plan Section 9.4.1 | 11 August 2004 | Response to Request for Additional Information Regarding Safeguards Contingency Plan and Physical Security Plan Section 9.4.1 | Fitness for Duty |
JAFP-04-0129, Follow-up Response to Request for Additional Information Regarding Safeguards Contingency Plan and Physical Security Plan Section 9.4.1 | 19 August 2004 | Follow-up Response to Request for Additional Information Regarding Safeguards Contingency Plan and Physical Security Plan Section 9.4.1 | |
JAFP-04-0135, James a FitzPatrick, 10 CFR 50.46 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models | 23 August 2004 | James a FitzPatrick, 10 CFR 50.46 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models | |
JAFP-04-0138, Follow-up to Responses to Request for Additional Information Regarding Security Plan Sections 1 - 19 and Safeguards Contingency Plan | 25 August 2004 | Follow-up to Responses to Request for Additional Information Regarding Security Plan Sections 1 - 19 and Safeguards Contingency Plan | |
JAFP-04-0146, Letter to Document Control Desk from T.A. Sullivan, 20-Day Response to Order for Implementation of Additional Security Measures Associated with Access Authorization at the James A. FitzPatrick Nuclear Power Plant | 7 September 2004 | Letter to Document Control Desk from T.A. Sullivan, 20-Day Response to Order for Implementation of Additional Security Measures Associated with Access Authorization at the James A. FitzPatrick Nuclear Power Plant | |
JAFP-04-0149, Re-submittal of Security Plan | 9 September 2004 | Re-submittal of Security Plan | |
JAFP-04-0150, August 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant | 14 September 2004 | August 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant | Power change Coast down |
JAFP-04-0152, Supplemental Response to the April 29, 2003, Orders to James A. FitzPatrick Nuclear Power Plant | 14 September 2004 | Supplemental Response to the April 29, 2003, Orders to James A. FitzPatrick Nuclear Power Plant | Enforcement Discretion |
JAFP-04-0158, Follow-up Response to Request for Additional Information and Revision to Proposed License Amendment to Safety Limit Minimum Critical Power Ratio (SLMCPR) | 27 September 2004 | Follow-up Response to Request for Additional Information and Revision to Proposed License Amendment to Safety Limit Minimum Critical Power Ratio (SLMCPR) | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio |
JAFP-04-0159, Entergy Nuclear Operations, Inc., NRC Generic Letter 2003-01, Control Room Habitability, Initial Summary Actions Report | 27 September 2004 | Entergy Nuclear Operations, Inc., NRC Generic Letter 2003-01, Control Room Habitability, Initial Summary Actions Report | Safe Shutdown Fire Barrier Power Uprate |
JAFP-04-0161, Final Submittal of Security Plan | 28 September 2004 | Final Submittal of Security Plan | |
JAFP-04-0166, September 2004 Monthly Operating Report for James a FitzPatrick Nuclear Power Plant | 11 October 2004 | September 2004 Monthly Operating Report for James a FitzPatrick Nuclear Power Plant | Downpower Coast down |
JAFP-04-0168, Updated Submittal of Security Plan | 14 October 2004 | Updated Submittal of Security Plan | |
JAFP-04-0172, Core Operating Limits Report, Revision 15 (Cycle 17 Update) | 26 October 2004 | Core Operating Limits Report, Revision 15 (Cycle 17 Update) | |
JAFP-04-0173, Updated Submittal of Security Plan | 26 October 2004 | Updated Submittal of Security Plan | |
JAFP-04-0177, Confirmation of Implementation of April 29, 2003, Order EA-03-039 to James A. FitzPatrick Nuclear Power Plant | 1 November 2004 | Confirmation of Implementation of April 29, 2003, Order EA-03-039 to James A. FitzPatrick Nuclear Power Plant | Fitness for Duty |
JAFP-04-0181, October 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant | 10 November 2004 | October 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant | |
JAFP-04-0186, November 2004 Monthly Operating Report for James A. FitzPatrick | 7 December 2004 | November 2004 Monthly Operating Report for James A. FitzPatrick | |
JAFP-04-0189, Response to Request for Additional Information Regarding Proposed License Amendment to Safety Limit Minimum Critical Power Ratio (SLMCPR) (TAC No. MC3391). Non-proprietary Version | 14 December 2004 | Response to Request for Additional Information Regarding Proposed License Amendment to Safety Limit Minimum Critical Power Ratio (SLMCPR) (TAC No. MC3391). Non-proprietary Version | Safety Limit Minimum Critical Power Ratio MELLLA |
JAFP-04-0190, In-Vessel Visual Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17) | 15 December 2004 | In-Vessel Visual Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17) | VT-2 EVT-1 |
JAFP-04-0195, Application for Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency | 30 December 2004 | Application for Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency | Incorporated by reference |
JAFP-05-0013, Inservice Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17) | 19 January 2005 | Inservice Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17) | |
JAFP-05-0017, Confirmation of Implementation of April 29, 2003, Orders to James A. FitzPatrick Nuclear Power Plant | 28 January 2005 | Confirmation of Implementation of April 29, 2003, Orders to James A. FitzPatrick Nuclear Power Plant | Enforcement Discretion |
JAFP-05-0039, Core Operating Limits Report, Revision 16 (Cycle 17 Update) | 15 March 2005 | Core Operating Limits Report, Revision 16 (Cycle 17 Update) | |
JAFP-05-0069, Summary of Plant Changes, Tests, and Experiments for 2003 and 2004 as Required by 10 CFR 50.59 and 10 CFR 72.48, and Summary of Commitment Changes for 2003 and 2004 | 5 May 2005 | Summary of Plant Changes, Tests, and Experiments for 2003 and 2004 as Required by 10 CFR 50.59 and 10 CFR 72.48, and Summary of Commitment Changes for 2003 and 2004 | Scram Discharge Volume Fire Protection Program Power change |
JAFP-05-0072, Transmittal of Annual Radiological Environmental Operating Report - 2004 | 12 May 2005 | Transmittal of Annual Radiological Environmental Operating Report - 2004 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
JAFP-05-0080, Response to NRC Guidance Regarding Mitigation Strategies for James A. Fitzpatrick Nuclear Plant | 26 May 2005 | Response to NRC Guidance Regarding Mitigation Strategies for James A. Fitzpatrick Nuclear Plant | B.5.b Mitigating Strategies |
JAFP-05-0082, Technical Specification Amendment to DC Electrical System Requirements | 27 April 2005 | Technical Specification Amendment to DC Electrical System Requirements | Safe Shutdown Abnormal operational transient Battery sizing |
JAFP-05-0084, Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (CLIIP) | 31 May 2005 | Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (CLIIP) | Time of Discovery Ultimate heat sink Grab sample Post Accident Monitoring Incorporated by reference Offsite Circuit |
JAFP-05-0087, Request Exigent Processing of License Amendment Request Dated April 27, 2005 | 3 June 2005 | Request Exigent Processing of License Amendment Request Dated April 27, 2005 | |
JAFP-05-0102, Request for Approval of Relief Request No. RR-37. Alternative Test Per 10 CFR 60.55a (a)(3)(I) from 1998 Edition of ASME Section XI as Supplemented by the 1892 Edition ASME Section Xl Through 1992 Addenda For. | 6 July 2005 | Request for Approval of Relief Request No. RR-37. Alternative Test Per 10 CFR 60.55a (a)(3)(I) from 1998 Edition of ASME Section XI as Supplemented by the 1892 Edition ASME Section Xl Through 1992 Addenda For. | VT-2 |
JAFP-05-0104, Request for Additional Information on Relief Request No. RR-37 | 7 July 2005 | Request for Additional Information on Relief Request No. RR-37 | |
JAFP-05-0105, Request for Approval of Relief Request No. RR-38, Proposed Alternative to Perform a Temporary Non-Code Repair in Accordance with 10 CFR 50.55a(a)(3)(ii) | 9 July 2005 | Request for Approval of Relief Request No. RR-38, Proposed Alternative to Perform a Temporary Non-Code Repair in Accordance with 10 CFR 50.55a(a)(3)(ii) | Safe Shutdown Temporary Modification Abnormal operational transient |
JAFP-05-0106, Request for Additional Information on Relief Request No. RR-38, Proposed Alternative to Perform a Temporary Non-Code Repair in Accordance with 10 CFR 50.55a(a)(3)(ii) | 10 July 2005 | Request for Additional Information on Relief Request No. RR-38, Proposed Alternative to Perform a Temporary Non-Code Repair in Accordance with 10 CFR 50.55a(a)(3)(ii) | VT-2 Design basis earthquake |
JAFP-05-0118, Request for Exemption from 10 CFR 50, Appendix R, III.G.2.c Requirement for a One-Hour Rated Fire Barrier Wrap | 27 July 2005 | Request for Exemption from 10 CFR 50, Appendix R, III.G.2.c Requirement for a One-Hour Rated Fire Barrier Wrap | Safe Shutdown Fire Barrier Hemyc Exemption Request Fire Protection Program Fire Watch |