Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
JAFP-04-0024, January 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant12 February 2004January 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant
JAFP-04-0035, February 2004 Monthly Operating Report for James a FitzPatrick10 March 2004February 2004 Monthly Operating Report for James a FitzPatrickFrazil ice
Downpower
JAFP-04-0054, Annual Radioactive Effluent Release Report for the Period of January 1, 2003 Through December 31, 200321 April 2004Annual Radioactive Effluent Release Report for the Period of January 1, 2003 Through December 31, 2003Time of Discovery
High winds
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
JAFP-04-0058, 2003 Personnel Radiation Exposure Summary Report22 April 20042003 Personnel Radiation Exposure Summary Report
JAFP-04-0062, Supplemental Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-For-Duty29 April 2004Supplemental Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-For-DutyEnforcement Discretion
JAFP-04-0069, Transmittal of Annual Radiological Environmental Operating Report for 200311 May 2004Transmittal of Annual Radiological Environmental Operating Report for 2003Annual Radiological Environmental Operating Report
JAFP-04-0071, Response to Request for Information Regarding Proposed One Time Deferral of Integrated Containment Leak Rate Testing - Proposed Relief Request to James A. FitzPatrick Nuclear Power Plant (JAFNPP) ISI Program20 May 2004Response to Request for Information Regarding Proposed One Time Deferral of Integrated Containment Leak Rate Testing - Proposed Relief Request to James A. FitzPatrick Nuclear Power Plant (JAFNPP) ISI ProgramCoatings
Scaffolding
JAFP-04-0072, 2nd Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval20 May 20042nd Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval
JAFP-04-0086, May 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant14 June 2004May 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power PlantPower change
JAFP-04-0100, June 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant12 July 2004June 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power PlantDownpower
JAFP-04-0101, Operator Licensing Examination Data12 July 2004Operator Licensing Examination DataGeneric Fundamentals Examination
JAFP-04-0115, Response to Request for Additional Information Training and Qualification Plan22 July 2004Response to Request for Additional Information Training and Qualification PlanFitness for Duty
JAFP-04-0117, Response to Request for Additional Information Regarding Proposed License Amendment to Safety Limit Minimum Critical Power Ratio (SLMCPR)27 July 2004Response to Request for Additional Information Regarding Proposed License Amendment to Safety Limit Minimum Critical Power Ratio (SLMCPR)Minimum Critical Power Ratio
JAFP-04-0119, Follow-up to Responses to Request for Additional Information Regarding Security Plan Sections 1 - 192 August 2004Follow-up to Responses to Request for Additional Information Regarding Security Plan Sections 1 - 19
JAFP-04-0122, July 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant6 August 2004July 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power PlantDownpower
JAFP-04-0123, Response to Request for Additional Information Regarding Safeguards Contingency Plan and Physical Security Plan Section 9.4.111 August 2004Response to Request for Additional Information Regarding Safeguards Contingency Plan and Physical Security Plan Section 9.4.1Fitness for Duty
JAFP-04-0129, Follow-up Response to Request for Additional Information Regarding Safeguards Contingency Plan and Physical Security Plan Section 9.4.119 August 2004Follow-up Response to Request for Additional Information Regarding Safeguards Contingency Plan and Physical Security Plan Section 9.4.1
JAFP-04-0135, James a FitzPatrick, 10 CFR 50.46 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models23 August 2004James a FitzPatrick, 10 CFR 50.46 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models
JAFP-04-0138, Follow-up to Responses to Request for Additional Information Regarding Security Plan Sections 1 - 19 and Safeguards Contingency Plan25 August 2004Follow-up to Responses to Request for Additional Information Regarding Security Plan Sections 1 - 19 and Safeguards Contingency Plan
JAFP-04-0146, Letter to Document Control Desk from T.A. Sullivan, 20-Day Response to Order for Implementation of Additional Security Measures Associated with Access Authorization at the James A. FitzPatrick Nuclear Power Plant7 September 2004Letter to Document Control Desk from T.A. Sullivan, 20-Day Response to Order for Implementation of Additional Security Measures Associated with Access Authorization at the James A. FitzPatrick Nuclear Power Plant
JAFP-04-0149, Re-submittal of Security Plan9 September 2004Re-submittal of Security Plan
JAFP-04-0150, August 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant14 September 2004August 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power PlantPower change
Coast down
JAFP-04-0152, Supplemental Response to the April 29, 2003, Orders to James A. FitzPatrick Nuclear Power Plant14 September 2004Supplemental Response to the April 29, 2003, Orders to James A. FitzPatrick Nuclear Power PlantEnforcement Discretion
JAFP-04-0158, Follow-up Response to Request for Additional Information and Revision to Proposed License Amendment to Safety Limit Minimum Critical Power Ratio (SLMCPR)27 September 2004Follow-up Response to Request for Additional Information and Revision to Proposed License Amendment to Safety Limit Minimum Critical Power Ratio (SLMCPR)Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
JAFP-04-0159, Entergy Nuclear Operations, Inc., NRC Generic Letter 2003-01, Control Room Habitability, Initial Summary Actions Report27 September 2004Entergy Nuclear Operations, Inc., NRC Generic Letter 2003-01, Control Room Habitability, Initial Summary Actions ReportSafe Shutdown
Fire Barrier
Power Uprate
JAFP-04-0161, Final Submittal of Security Plan28 September 2004Final Submittal of Security Plan
JAFP-04-0166, September 2004 Monthly Operating Report for James a FitzPatrick Nuclear Power Plant11 October 2004September 2004 Monthly Operating Report for James a FitzPatrick Nuclear Power PlantDownpower
Coast down
JAFP-04-0168, Updated Submittal of Security Plan14 October 2004Updated Submittal of Security Plan
JAFP-04-0172, Core Operating Limits Report, Revision 15 (Cycle 17 Update)26 October 2004Core Operating Limits Report, Revision 15 (Cycle 17 Update)
JAFP-04-0173, Updated Submittal of Security Plan26 October 2004Updated Submittal of Security Plan
JAFP-04-0177, Confirmation of Implementation of April 29, 2003, Order EA-03-039 to James A. FitzPatrick Nuclear Power Plant1 November 2004Confirmation of Implementation of April 29, 2003, Order EA-03-039 to James A. FitzPatrick Nuclear Power PlantFitness for Duty
JAFP-04-0181, October 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant10 November 2004October 2004 Monthly Operating Report for James A. FitzPatrick Nuclear Power Plant
JAFP-04-0186, November 2004 Monthly Operating Report for James A. FitzPatrick7 December 2004November 2004 Monthly Operating Report for James A. FitzPatrick
JAFP-04-0189, Response to Request for Additional Information Regarding Proposed License Amendment to Safety Limit Minimum Critical Power Ratio (SLMCPR) (TAC No. MC3391). Non-proprietary Version14 December 2004Response to Request for Additional Information Regarding Proposed License Amendment to Safety Limit Minimum Critical Power Ratio (SLMCPR) (TAC No. MC3391). Non-proprietary VersionSafety Limit Minimum Critical Power Ratio
MELLLA
JAFP-04-0190, In-Vessel Visual Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17)15 December 2004In-Vessel Visual Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17)VT-2
EVT-1
JAFP-04-0195, Application for Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency30 December 2004Application for Technical Specification Improvement to Revise Control Rod Scram Time Testing FrequencyIncorporated by reference
JAFP-05-0013, Inservice Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17)19 January 2005Inservice Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17)
JAFP-05-0017, Confirmation of Implementation of April 29, 2003, Orders to James A. FitzPatrick Nuclear Power Plant28 January 2005Confirmation of Implementation of April 29, 2003, Orders to James A. FitzPatrick Nuclear Power PlantEnforcement Discretion
JAFP-05-0039, Core Operating Limits Report, Revision 16 (Cycle 17 Update)15 March 2005Core Operating Limits Report, Revision 16 (Cycle 17 Update)
JAFP-05-0069, Summary of Plant Changes, Tests, and Experiments for 2003 and 2004 as Required by 10 CFR 50.59 and 10 CFR 72.48, and Summary of Commitment Changes for 2003 and 20045 May 2005Summary of Plant Changes, Tests, and Experiments for 2003 and 2004 as Required by 10 CFR 50.59 and 10 CFR 72.48, and Summary of Commitment Changes for 2003 and 2004Scram Discharge Volume
Fire Protection Program
Power change
JAFP-05-0072, Transmittal of Annual Radiological Environmental Operating Report - 200412 May 2005Transmittal of Annual Radiological Environmental Operating Report - 2004Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
JAFP-05-0080, Response to NRC Guidance Regarding Mitigation Strategies for James A. Fitzpatrick Nuclear Plant26 May 2005Response to NRC Guidance Regarding Mitigation Strategies for James A. Fitzpatrick Nuclear PlantB.5.b Mitigating Strategies
JAFP-05-0082, Technical Specification Amendment to DC Electrical System Requirements27 April 2005Technical Specification Amendment to DC Electrical System RequirementsSafe Shutdown
Abnormal operational transient
Battery sizing
JAFP-05-0084, Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (CLIIP)31 May 2005Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (CLIIP)Time of Discovery
Ultimate heat sink
Grab sample
Post Accident Monitoring
Incorporated by reference
Offsite Circuit
JAFP-05-0087, Request Exigent Processing of License Amendment Request Dated April 27, 20053 June 2005Request Exigent Processing of License Amendment Request Dated April 27, 2005
JAFP-05-0102, Request for Approval of Relief Request No. RR-37. Alternative Test Per 10 CFR 60.55a (a)(3)(I) from 1998 Edition of ASME Section XI as Supplemented by the 1892 Edition ASME Section Xl Through 1992 Addenda For.6 July 2005Request for Approval of Relief Request No. RR-37. Alternative Test Per 10 CFR 60.55a (a)(3)(I) from 1998 Edition of ASME Section XI as Supplemented by the 1892 Edition ASME Section Xl Through 1992 Addenda For.VT-2
JAFP-05-0104, Request for Additional Information on Relief Request No. RR-377 July 2005Request for Additional Information on Relief Request No. RR-37
JAFP-05-0105, Request for Approval of Relief Request No. RR-38, Proposed Alternative to Perform a Temporary Non-Code Repair in Accordance with 10 CFR 50.55a(a)(3)(ii)9 July 2005Request for Approval of Relief Request No. RR-38, Proposed Alternative to Perform a Temporary Non-Code Repair in Accordance with 10 CFR 50.55a(a)(3)(ii)Safe Shutdown
Temporary Modification
Abnormal operational transient
JAFP-05-0106, Request for Additional Information on Relief Request No. RR-38, Proposed Alternative to Perform a Temporary Non-Code Repair in Accordance with 10 CFR 50.55a(a)(3)(ii)10 July 2005Request for Additional Information on Relief Request No. RR-38, Proposed Alternative to Perform a Temporary Non-Code Repair in Accordance with 10 CFR 50.55a(a)(3)(ii)VT-2
Design basis earthquake
JAFP-05-0118, Request for Exemption from 10 CFR 50, Appendix R, III.G.2.c Requirement for a One-Hour Rated Fire Barrier Wrap27 July 2005Request for Exemption from 10 CFR 50, Appendix R, III.G.2.c Requirement for a One-Hour Rated Fire Barrier WrapSafe Shutdown
Fire Barrier
Hemyc
Exemption Request
Fire Protection Program
Fire Watch