05000334/LER-1982-052, Forwards LER 82-052/03L-0 | 2 December 1982 | Forwards LER 82-052/03L-0 | |
05000334/LER-1982-053, Forwards LER 82-053/03L-0 | 2 December 1982 | Forwards LER 82-053/03L-0 | |
05000334/LER-1982-054, Forwards LER 82-054/04L-0 | 13 December 1982 | Forwards LER 82-054/04L-0 | |
05000334/LER-1982-055, Forwards LER 82-055/03L-0 | 27 December 1982 | Forwards LER 82-055/03L-0 | |
05000334/LER-1982-056, Forwards LER 82-056/03L-0 | 15 December 1982 | Forwards LER 82-056/03L-0 | |
05000334/LER-1982-057, Forwards LER 82-057/03L-0 | 27 December 1982 | Forwards LER 82-057/03L-0 | |
05000334/LER-1982-058, Forwards LER 82-058/03L-0 | 21 December 1982 | Forwards LER 82-058/03L-0 | |
05000334/LER-1983-001, Forwards LER 83-001/03L-0 | 2 February 1983 | Forwards LER 83-001/03L-0 | Fire Barrier |
05000334/LER-1983-002, Forwards LER 83-002/03L-0 | 24 February 1983 | Forwards LER 83-002/03L-0 | |
05000334/LER-1983-003, Forwards LER 83-003/03L-0 | 24 February 1983 | Forwards LER 83-003/03L-0 | |
05000334/LER-1983-004, Forwards LER 83-004/03L-0 | 10 February 1983 | Forwards LER 83-004/03L-0 | |
05000334/LER-1983-005, Forwards LER 83-005/99X-0 | 28 February 1983 | Forwards LER 83-005/99X-0 | |
05000334/LER-1983-006, Forwards LER 83-006/03L-0 | 7 March 1983 | Forwards LER 83-006/03L-0 | |
05000334/LER-1983-007, Forwards LER 83-007/04T-0 | 18 February 1983 | Forwards LER 83-007/04T-0 | |
05000334/LER-1983-008, Forwards Updated LER 83-008/03X-1 | 25 April 1983 | Forwards Updated LER 83-008/03X-1 | |
05000334/LER-1983-009, Forwards LER 83-009/03L-0 | 4 April 1983 | Forwards LER 83-009/03L-0 | |
05000334/LER-1983-010, Forwards LER 83-010/99X-0 | 2 May 1983 | Forwards LER 83-010/99X-0 | |
05000334/LER-1983-011, Forwards LER 83-011/03L-0 | 9 May 1983 | Forwards LER 83-011/03L-0 | |
05000334/LER-1983-021, Requests That LER 83-021/03L-0 Be Withdrawn Based on Investigation Which Revealed That Surveillance Test Complies W/Requisite Actions for Limiting Condition for Tech Spec 3.9.9 Re Core Reload | 29 September 1983 | Requests That LER 83-021/03L-0 Be Withdrawn Based on Investigation Which Revealed That Surveillance Test Complies W/Requisite Actions for Limiting Condition for Tech Spec 3.9.9 Re Core Reload | |
05000334/LER-1988-013, Responds to NRC Re Violations Noted in Insp Repts 50-334/88-22 & 50-412/88-16.Corrective Actions:Replacement of Tray & Conduit Covers,Establishment of Action Plan to Correct Any Similar Situations & LER 88-013 Issued | 12 September 1988 | Responds to NRC Re Violations Noted in Insp Repts 50-334/88-22 & 50-412/88-16.Corrective Actions:Replacement of Tray & Conduit Covers,Establishment of Action Plan to Correct Any Similar Situations & LER 88-013 Issued | |
05000334/LER-1991-021, Forwards LER 91-021-01.Rev Issued to Clarify Method of Control Rod Insertion & Failure Description of Affected Fuse | 6 September 1991 | Forwards LER 91-021-01.Rev Issued to Clarify Method of Control Rod Insertion & Failure Description of Affected Fuse | |
05000334/LER-1991-023, Forwards Corrected Copy of ,Transmitting LER 91-023-00.Ltr ND3MNO:3179 Should Have Been ND3MNO:3194 | 4 September 1991 | Forwards Corrected Copy of ,Transmitting LER 91-023-00.Ltr ND3MNO:3179 Should Have Been ND3MNO:3194 | |
05000334/LER-1991-024, Forwards Corrected Copy of ,Transmitting LER 91-024-0.Ltr Number ND3MNO:3180 Should Have Been ND3MNO:3179 | 4 September 1991 | Forwards Corrected Copy of ,Transmitting LER 91-024-0.Ltr Number ND3MNO:3180 Should Have Been ND3MNO:3179 | |
05000334/LER-1996-004, Forwards Rev 2 to LER 96-004,covering Reportable Surveillance Inadequacies of SR Logic Discovered Since 960423 | 6 August 1996 | Forwards Rev 2 to LER 96-004,covering Reportable Surveillance Inadequacies of SR Logic Discovered Since 960423 | |
05000334/LER-1997-001, Forwards LER 97-001-01 Re Inadequate Surveillance Testing of Auxiliary Feedwater Pump Auto Start Circuitry,Per GL 96-01. Encl LER Suppl Provides Addl Info Re Issues Identified as Result of Reviews Performed in Response to GL 96 | 2 May 1997 | Forwards LER 97-001-01 Re Inadequate Surveillance Testing of Auxiliary Feedwater Pump Auto Start Circuitry,Per GL 96-01. Encl LER Suppl Provides Addl Info Re Issues Identified as Result of Reviews Performed in Response to GL 96-01 | |
05000334/LER-1997-008, Informs of Change in Scheduled Completion Date for LER 97-008-01 Commitment from 981130 to 990830 | 18 November 1998 | Informs of Change in Scheduled Completion Date for LER 97-008-01 Commitment from 981130 to 990830 | |
05000334/LER-1997-039, Forwards LER 97-039-00,per 10CFR50.73(a)(2)(ii) & 10CFR50.73 (a)(2)(v),re Gas Accumulation in Charging/High Head Safety Injection Pump Piping | 7 January 1998 | Forwards LER 97-039-00,per 10CFR50.73(a)(2)(ii) & 10CFR50.73 (a)(2)(v),re Gas Accumulation in Charging/High Head Safety Injection Pump Piping | |
05000334/LER-1998-002, Informs of Change in Scheduled Completion Date for Commitment Contained in LER 98-002-00.One of Seven Corrective Actions Can Not Be Completed on Schedule Originally Provided | 30 April 1998 | Informs of Change in Scheduled Completion Date for Commitment Contained in LER 98-002-00.One of Seven Corrective Actions Can Not Be Completed on Schedule Originally Provided | |
05000334/LER-1998-007, Informs That Commitment to Revise Maint Sps as Stated in LER 98-007 Is Being Revised to 990215.Maint Sps 1MSP-36.22-M,1MSP-36.36-M,1MSP-36.73-M & 1MSP-36.74-M & Date of Next Bvps,Unit 1 RFO,1R13,discussed | 2 December 1998 | Informs That Commitment to Revise Maint Sps as Stated in LER 98-007 Is Being Revised to 990215.Maint Sps 1MSP-36.22-M,1MSP-36.36-M,1MSP-36.73-M & 1MSP-36.74-M & Date of Next Bvps,Unit 1 RFO,1R13,discussed | |
05000334/LER-1998-014, Forwards LER 98-014-01,re Failure to Comply W/Ts SR 4.4.9.2.3 on Both Units & Subsequent Identification of Two Prior Instances of Exceeded Unit 1 Max Allowed Pressurizer Spray Water Differential Temp,Per TS 3.4.9.2.c | 14 August 1998 | Forwards LER 98-014-01,re Failure to Comply W/Ts SR 4.4.9.2.3 on Both Units & Subsequent Identification of Two Prior Instances of Exceeded Unit 1 Max Allowed Pressurizer Spray Water Differential Temp,Per TS 3.4.9.2.c | |
05000334/LER-1998-015, Forwards LER 98-015-01, Inadequate Performance of Channel Functional Tests, Per 10CFR50.73(a)(2)(i).Restatement of Corrective Action Provided with Underlined Words to Clarify Intent | 6 April 1999 | Forwards LER 98-015-01, Inadequate Performance of Channel Functional Tests, Per 10CFR50.73(a)(2)(i).Restatement of Corrective Action Provided with Underlined Words to Clarify Intent | |
05000334/LER-1998-016, Forwards LER 98-016-00 Re Missing Fire/Flood Seal in Main Steam Valve Room Shakespace | 28 April 1998 | Forwards LER 98-016-00 Re Missing Fire/Flood Seal in Main Steam Valve Room Shakespace | |
05000334/LER-1998-020, Forwards LER 98-020-01, Use of Non-Calibr Computer Points for TS Surveillances, IAW 10CFR50.73(a)(2)(i) | 13 July 1998 | Forwards LER 98-020-01, Use of Non-Calibr Computer Points for TS Surveillances, IAW 10CFR50.73(a)(2)(i) | |
05000334/LER-1998-022, Informs That Commitment to Revise Maint Surveillance Procedures,As Stated in LER 98-022,is Being Revised to 990225.Change in Commitment Schedule Does Not Represent Challenge to Plant Safety | 30 December 1998 | Informs That Commitment to Revise Maint Surveillance Procedures,As Stated in LER 98-022,is Being Revised to 990225.Change in Commitment Schedule Does Not Represent Challenge to Plant Safety | |
05000334/LER-1998-026, Discusses Change in Commitment Contained in LER 98-026-00, Dtd 980723,re Stroke Testing & Operability Verification of Listed RHR & CCR Valves | 4 August 1998 | Discusses Change in Commitment Contained in LER 98-026-00, Dtd 980723,re Stroke Testing & Operability Verification of Listed RHR & CCR Valves | |
05000334/LER-1998-027, Informs That Dl Intends to Issue Special Rept Providing Overview of TS Compliance Issues & Corrective Actions Taken. Based on Dl Intent to Provide Special Rept,Supplemental Rept to LER 98-027-00 Will Not Be Issued | 20 May 1998 | Informs That Dl Intends to Issue Special Rept Providing Overview of TS Compliance Issues & Corrective Actions Taken. Based on Dl Intent to Provide Special Rept,Supplemental Rept to LER 98-027-00 Will Not Be Issued | Missed surveillance |
05000412/LER-1987-016, Submits Revised Cover Ltr for LER 87-016-00, ESF Actuation- Inadvertent Start of Auxiliary Feedwater Pump. Rept Resubmitted Due to Inaccurate Event Description. Ltr | 21 September 1987 | Submits Revised Cover Ltr for LER 87-016-00, ESF Actuation- Inadvertent Start of Auxiliary Feedwater Pump. Rept Resubmitted Due to Inaccurate Event Description. Ltr | |
05000412/LER-1990-007, Responds to NRC Re Deviation 50-412/90-12-01 Noted in Insp Rept 50-412/90-12.Corrective Actions:Procedure OM 2.20-4.I Revised to Require Removal of Flanges Following Drain Operations & LER 90-007-00 Issued | 23 August 1990 | Responds to NRC Re Deviation 50-412/90-12-01 Noted in Insp Rept 50-412/90-12.Corrective Actions:Procedure OM 2.20-4.I Revised to Require Removal of Flanges Following Drain Operations & LER 90-007-00 Issued | |
05000412/LER-1990-011, Provides Corrected Copy of Licensee Event Rept W/Correct Number (LER-90-011-01) | 15 January 1992 | Provides Corrected Copy of Licensee Event Rept W/Correct Number (LER-90-011-01) | |
05000412/LER-1995-003, Forwards LER 95-003 Re Train B Recirculation Spray Sys Header Cooling Flow Below TS Requirements | 14 August 1995 | Forwards LER 95-003 Re Train B Recirculation Spray Sys Header Cooling Flow Below TS Requirements | |
05000412/LER-1996-003, Forwards LER 96-003-00 Re Inadequate Testing of Safety Related Logic,Per GL 96-01 | 8 July 1996 | Forwards LER 96-003-00 Re Inadequate Testing of Safety Related Logic,Per GL 96-01 | |
05000412/LER-1997-003, Forwards LER 97-003-01 Re Entry of TS 3.0.3 Due to Inoperability of Both Trains of Suppl Leak Collection & Release Sys | 27 April 1998 | Forwards LER 97-003-01 Re Entry of TS 3.0.3 Due to Inoperability of Both Trains of Suppl Leak Collection & Release Sys | |
05000412/LER-1998-002, Forwards LER 98-002-00,re Inadequate Testing of Diesel Fuel Oil Transfer Pumps as Required by TS | 30 March 1998 | Forwards LER 98-002-00,re Inadequate Testing of Diesel Fuel Oil Transfer Pumps as Required by TS | |
05000412/LER-1998-007, Forwards LER 98-007-02 Re Inadequate BVPS Unit 2 Procedures to Ensure Compliance W/Ts | 19 August 1998 | Forwards LER 98-007-02 Re Inadequate BVPS Unit 2 Procedures to Ensure Compliance W/Ts | |
05000412/LER-1998-008, Forwards LER 98-008-01, GL 96-01 TS Instrumentation Surveillance Inadequacies, Per 10CFR50.73(a)(2)(i) | 12 June 1998 | Forwards LER 98-008-01, GL 96-01 TS Instrumentation Surveillance Inadequacies, Per 10CFR50.73(a)(2)(i) | |
05000412/LER-1998-010, Forwards LER 98-010-00, Non-Safety Related Mechanical Seal Assembly Installed in Quench Spray Pump 'A' 2QSS-P21A, Per 10CFR50.73(a)(2)(i) | 12 June 1998 | Forwards LER 98-010-00, Non-Safety Related Mechanical Seal Assembly Installed in Quench Spray Pump 'A' 2QSS-P21A, Per 10CFR50.73(a)(2)(i) | |
05000412/LER-1998-011, Forwards LER 98-011-00, Cross-Connect Piping Installed Between Suction Lines of Hydrogen Recombiners, IAW 10CFR50.73(a)(2)(i) & (II) | 13 July 1998 | Forwards LER 98-011-00, Cross-Connect Piping Installed Between Suction Lines of Hydrogen Recombiners, IAW 10CFR50.73(a)(2)(i) & (II) | |
05000412/LER-1999-007, Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info | 19 August 1999 | Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info | |
L-75-584, Submits Results of Liquid Penetrant & Ultrasonic Volumetric Exams of All Six Reactor Pressure Vessel Nozzle Safe End Welds.No Recordable Indications Produced During Liquid Penetrant Exam.Unit 4 to Be Examined During Spring 1976 | 16 December 1975 | Submits Results of Liquid Penetrant & Ultrasonic Volumetric Exams of All Six Reactor Pressure Vessel Nozzle Safe End Welds.No Recordable Indications Produced During Liquid Penetrant Exam.Unit 4 to Be Examined During Spring 1976 | Liquid penetrant |
L-97-001, Forwards Response to NRC Re Violations Noted in Insp Repts 50-334/97-01,50-412/97-01,50-334/97-02 & 50-412/97-02 & Enforcement Conference.Corrective Actions: Quality Svcs Performed Assessment of TS SRs for Units 1 & 2 | 1 August 1997 | Forwards Response to NRC Re Violations Noted in Insp Repts 50-334/97-01,50-412/97-01,50-334/97-02 & 50-412/97-02 & Enforcement Conference.Corrective Actions: Quality Svcs Performed Assessment of TS SRs for Units 1 & 2 | Stroke time |