Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19318A037 | 2 June 1980 | Part 21 Rept Re Util Use of Invalid Seismic Amplified Response Spectra.Confirms Rh Leonard 800530 Telcon W/Wg Reinmuth of Revision to Final Rept date.Short-term Audit & Redesign of Containment Annular Steel Complete | |
ML19318D158 | 3 July 1980 | Annual Financial Rept 1979 | Stolen |
ML19318D159 | 4 January 1980 | Annual Financial Rept 1979 | |
ML19318D163 | 25 January 1980 | Annual Financial Rept 1979 | |
ML19318D165 | 14 February 1980 | Annual Financial Rept 1979 | |
ML19318D167 | 15 February 1980 | Annual Financial Rept 1979 | |
ML19318D168 | 7 February 1980 | Annual Financial Rept 1979 | |
ML19318D169 | 6 March 1980 | Annual Financial Rept 1979 | |
ML19318D172 | 28 March 1980 | Annual Financial Rept 1979 | |
ML19318D173 | 3 July 1980 | Annual Financial Rept 1979 | Earthquake |
ML19318D175 | 7 March 1980 | Annual Financial Rept 1979 | |
ML19318D177 | 26 February 1980 | Annual Financial Rept 1979 | |
ML19318D178 | 22 February 1980 | Annual Financial Rept 1979 | |
ML19318D180 | 3 March 1980 | Annual Financial Rept 1979 | |
ML19318D184 | 15 March 1980 | Annual Financial Rept 1979 | |
ML19318D188 | 14 March 1980 | Annual Financial Rept 1979 | |
ML19322E140 | 31 December 1978 | Annual Financial Rept 1978 | |
ML19323C538 | 14 February 1980 | Annual Financial Rept 1979. | |
ML19323G243 | 13 May 1980 | Part 21 Rept Re Discrepancy in Seismic Design in Containment Annular Area.Cause Unstated.Details Contained in Util 791206 Deficiency Rept | |
ML19325C789 | 5 October 1989 | LER 89-011-00:on 890905,determined That Three Piping Penetrations in Condensate Storage Tank Encl Not Sealed.Root Cause Under Investigation.Penetrations Sealed & Tech Specs Surveillance Log revised.W/891005 Ltr | Tornado Missile |
ML19325C952 | 29 September 1989 | Part 21 Rept Re Potential Common Failure of SMB-000 & SMB-00 Cam Type Torque Switches Supplied Prior to 1981 & 1976. Vendor Recommends That Switch W/Fiber Spacer Be Replaced | |
ML19325D826 | 30 September 1989 | Monthly Operating Rept for Sept 1989 for Seabrook Station Unit 1.W/891016 Ltr | |
ML19325E086 | 16 October 1989 | Followup Part 21 Rept Re Class 1E Battery Chargers W/ Transformers Running at Temps Exceeding Those Used in Qualification Rept When Operating at or Near Full Load Rating of Equipment.Listed Corrective Actions Underway | |
ML19325E491 | 23 October 1989 | Ro:Containment post-LOCA Area Radiation Monitor 1-RM-6576B Deenergized & Inoperable Since 891002,exceeding 7-day Tech Spec Limit.Caused by Allowance for Design Change for Power Source.Monitor to Be Returned to Svc on 891024 | |
ML19325F330 | 10 November 1989 | LER 89-012-00:on 891011,one of Two Suction Valves on RHR Train a Pump Closed,Causing Loss of All RHR Cooling Capability.Caused by Procedure Inadequacies.Procedure Revised to Specify Sequence of restoration.W/891110 Ltr | |
ML19327A997 | 31 December 1988 | Public Svc of New Hampshire 1988 Annual Rept. | |
ML19327A999 | 31 December 1988 | United Illuminating Co 1988 Annual Rept. | |
ML19327B001 | 31 December 1988 | Eastern Utils Assoc 1988 Annual Rept. | |
ML19327B002 | 31 December 1988 | Massachusetts Municipal Wholesale Electric Co 1988 Annual Rept. | |
ML19327B004 | 31 December 1988 | Northeast Utils 1988 Annual Rept. | |
ML19327B006 | 31 December 1988 | Commonwealth Energy Sys 1988 Annual Rept. | |
ML19327B008 | 31 December 1988 | New England Electric Sys 1988 Annual Rept. | |
ML19327B009 | 31 December 1988 | Taunton Municipal Lighting Plant 1988 Annual Rept. | |
ML19327B010 | 31 December 1988 | Hudson Light & Power Dept 1988 Annual Rept. | |
ML19327B401 | 31 July 1989 | Safety Evaluation for Byron/Braidwood Stations Units 1 & 2 Transition to Westinghouse 17 X 17 Vantage 5 Fuel. | |
ML19327C068 | 30 September 1989 | Nuclear Safety & Compliance Semiannual Rept Number 11,Apr- Sept 1989. W/891027 Ltr | High Radiation Area Hydrostatic NJPDES |
ML19331D769 | 21 August 1980 | Interim Deficiency Rept Re Rod Drop Analysis.Westinghouse Topical Rept Unavailable Until Late Sept 1980.Final Rept Expected by Dec 1980 | |
ML19331E239 | 28 August 1980 | Final Deficiency Rept Re Use of Invalid Seismic Amplified Response spectra.Short-term Audit of Seismic Category 1 Sys & Components Complete.Redesign of Containment Annular Steel Complete.Seismic Verification Program Will Be Completed | |
ML19332A671 | 29 August 1980 | Part 21 Final Rept Re Use of Invalid Seismic Amplified Response Spectra in Design of Components Supported by Containment Bldg Annular Steel Framing.Annular Steel Redesigned to Increase Rigidity | Operating Basis Earthquake |
ML19332C851 | 22 November 1989 | LER 89-013-00:on 891023,discovered That Monitor Used to Satisfy Requirements of Tech Spec 3.3.3.1,Action 27 Had Been Unplugged.Caused by Personnel Error.Individual Counseled & Meeting Held W/Health Physics technicians.W/891122 Ltr | |
ML19338F624 | 21 August 1980 | Interim Deficiency Rept on Rod Drop Analysis Advising That Westinghouse Topical Rept Will Not Be Available Until Sept 1980.Util Will Submit Final Rept by Dec 1980 | |
ML19338F629 | 28 August 1980 | Final Deficiency Rept Re Use of Invalid Seismic Amplified Response Data.Corrective Actions:Containment Bldg Annular Steel Frame Redesigned to Increase Rigidity & long-term Audit of All Seismic Category I Sys Will Be Conducted | |
ML19340C277 | 6 November 1980 | Interim Deficiency Rept Re Defective Cooling Tower Concrete Beams,Initially Reported on 801008.Testing Is in Process to Determine If Significant Deficiency Exists & Will Be Completed by 810216 | |
ML19341A425 | 15 January 1981 | Final Deficiency Rept,Originally Reported on 801216,re Pipe Supports Not Meeting ASME Code Requirements.Caused by Design & Human Error.Formal Design Manual Issued,Check List Initiated to Confirm Requirements & Training Session Begun | |
ML19345C819 | 31 August 1980 | Public Version of Seabrook Station Evacuation Analysis: Technical Memorandum 1,Summary of Local Meetings, Prepared for FEMA | |
ML19345F961 | 28 February 1981 | on Application of Probabilistic Method to Estimation of Seismic Risk at Seabrook Nuclear Power Plant Site. | |
ML19351A235 | 29 December 1988 | Gpu Operational QA Plan for TMI-1 & Oyster Creek. | Safe Shutdown Offsite Dose Calculation Manual Coatings Nondestructive Examination Temporary Modification Condition Adverse to Quality Minimum staff |
ML19351A294 | 9 October 1989 | Part 21 Rept Re Potential of Ambient Compensated Molded Case Circuit Breakers to Deviate from Published Info. Instantaneous Trip Check Will Be Instituted on All Class 1E Thermal/Magnetic Ambient Breakers Prior to Shipment | |
ML19351A419 | 30 September 1989 | Mark-BW Reload LOCA Analysis for Catawba & McGuire Units. | Boric Acid |
ML19351F746 | 16 December 1980 | Interim Deficiency Rept Re Rod Drop Analysis,Originally Reported 791213.Westinghouse Topical Rept Incomplete & Unavailable Until Second Quarter 1981.Final Deficiency Rept Expected to Be Submitted by Jul 1981 |