I Companyof New Hampshw e PUBUC SERVICE
'SEABROOK STATION Engineering Office:
20 Turnpike Road
- Westborough, MA 01581 August 21, 1980 SEN-131 T.F.-Q 2.2.2 U.S. Nuclear Regulatory Commission i
Region ~I 631 Park Avenue King of Prussia, Pennsylvania 19406 i-Attention: Office.of Inspection and Enforcement
Reference:
1.-
Docket No. 50-443 and 50-444 2.
Telecon of ll/16/79 between Joseph Mattia NRC and David Maidrand YAEC 3.
Westinghouse letter dated 11/15/79 to John G. Davis NRC 4.
Westinghouse letter No. NS-TMA-2167 dated 11/28/79 to A.T. Schwencer NRC 5.
Public Service Co of NH letter No. SBN-109 dated 12/13/79 to NRC I&E.
Subject:
10 CFR 50.55 (e) Interim Report on Red Drop Analysis
Dear Sir:
Reference 5 was submitted in accordance with the requirements of 10 CFR 4
(
50.55 (e) and identified a deficiency in the* rod drop analysis.
That interim report made a commitment to review the Westinghouse prepared topical report, which was to -be prepared by mid 1980, and submit a final report c,n the rod drop analysis to you by 8/28/80.
We now find that the Westinghouse topical report will not be avail'able until late September,.1980 and we are therefore unable to provide a final report at this time.
We now expect to have a-fi7al report to you on this subject by December, 1980.
ery truly yours, h,
j<
d John DeVincentis DAMatan Project Manager cc: