ML19325D826
| ML19325D826 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 09/30/1989 |
| From: | Feigenbaum T, Nardone P PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NYN-89121, NUDOCS 8910260269 | |
| Download: ML19325D826 (6) | |
Text
-
l New Hampshire Tod C..:.
.m I
Senior Vice Prnident and
)
s Chief Operating Officer l
l-j l
NYN-89121 October 16, 1989 l
t l
United Str.tes Nuclear Regulatory conv4r $1on i
Va t h.togt nt, M 20555>
l vnf4
, Attention Docamant Centrol D nk
References:
Facility Op9 rating L.icense NP?-57, Docket No. 50-443 Subjecte Monthly Operating Report Gentleran:
In accordance with Technleni S}+cification Section 6.8.1.5, enclosed please find Monthly Operating Report 89-09 covering the operation and shutdown experience relating to Seabrook Station Unit 1.
i Very truly yours,
((
Ted C. Feigenbaum Fnclosure
(
cca Mr. Villiam T. Russell Regional Administrator United States Nuclear Regulatory Commission Region I 475 Allendale Road l
King of Prussia PA 19406 Mr. Antone C. Cerne NRC Senior Resident Inspector P.O. Box 1149
)
Seabrook, NH 03874 i
4 8910260269 890930
[g)/
PDR ADOCK 05000443 R
PNU New Hampshire Yonkee D: vision of Public Servke Company of New Hampshire P.O. Box 300
- Seasook, NH 03874
- Telephone (603) 474 9521
CPIERTDG DMR RitKRT DOCKET 10.
50-443 IMIT " u.A 1 DME 10/04/89 OCMPLETi!D BY P. Nardcme i
TELEPIDEC f603) 474-9521 l
(Ext. 4074)
I (PIERTIIG STMUS 1.
thit Names caahmdk Station thit 1
. 2.
Reporting Period:
SEPTIMER 1989 i
3.
Idoensed 'Jhemel Powur (Wt):
3411
.l 4.
Nameplate Rat.ing (Gross Me):
1197 5.
Cecign Fler:'trical Rating (!bt Wa):
1348 e
6.
Maxinn Depr.dable Cgacity (Gross.%):
1107 (Irltial dwign value) 7.
Naxiusn Deperdable Capacity (Nat me)t 1140 (Initial design value)
(
- 8.. If Changes Oxur in Capacity Ratings (Items Number 3 'Ihro.yh 7)
Siro, last Repart, Give Reascrw Nat ]gj!. cable,
- 9. Iw Lovel 'IO Which Restrteted, d Any:,,dQ_CZ~,Zi
[ _ ~
f
- 10. Reasans for Restriut.icns, If Aiy:
14cemme issued m 05/25/82 Ja /dm E%r.
Ustaae _authoritinaJrgetiuDAIggsf.ct_.cva tower.%Mg, rot. M w.csse, of Ulamiawatta tMnnal.
l
'1his Mcoth Yr.-to-Date Curulative r
- 11. Hours In Reporting Period 720.0 6551.0 25920.0
- 12. Number Of Hours Reactor Was Critical 0.0 194.4 194.4
- 13. Reactor Reserve Shutdown Houts 0.0 0.0 0.0
- 14. Hours Generator Ch-Line 0.0 0.0 0.0 I
- 15. thit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross 'Ihermal Ehergy Generated (MHH) 0 1090 1090
[
- 17. Gross Elec. Energy Generated (MHH) 0 0
0
- 18. Het Electrical Energy Generated ()tti) 0 0
0
- 19. thit Service Factor 0.0 0.0 0.0
- 20. thit Availability Factor 0.0 0.0 0.0
- 21. thit Capacity Factor (Using MDC Net) 0.0 0.0 0.0 l
- 22. thit Capacity Factor (Using DER Net) 0.0 0.0 0.0
- 23. thit Forced Outage Rate 0.0 0.0 0.0
- 24. Shutdowns Scheduled Over Next 6 Mcnths (Type, Data, and Duration of Each):
p Reactor shutdown as of 06/22/89 for indefinJte duration, j
- 25.. If Shut Down At End Of Report Period, Estimated Date Of Startup Indefinite
}
I
- 26. Prior to Ccmmercial Operation:
Forecast Achieved INITIAL CRITICALITY 1999 06/13/89 i
INITIAL ELECIRICITY 1989 Not Acolicable
[
I OCHMERCIAL OPERATION 1989 Not Acolicable l
i 1 of 5
~
e-1
.'#IBUGE IRILY INIT POGR IJMIL l
DOCKET NO.
50-443 LMIT '" d 1
)
IRTE 10/04/89 CO@iJIT!!D BY P. Nardone Tl!LEPHCNE f 603) 474-9521
(!!kt. 4074) i MMlH SEPT 1DGilR 1989 1
y-
' LVJ AVI! RAGE IRILY PCHER 7.WI!L DAY AVI!RAGR TRILY KMER IE/PL l
(h.Wt)
(!Mb-Net) j 1
_0 16
_A,,,,,,,,,,,,,,,,,,,
2 0
17 o____.
[
3
__L
'8
_ _!1_ __.
1 4
0 19 0 -
t 5
0 20 0,_
6 0
21 0
7 0
22 0
8 0
23 0
{
9 0
24 0
10 0
25 0
11 0
26 0
12 0
27 0
i 13 0
28 0
14 0
29 0
i 15 0
30 0
l INS 7RUCTICNS
- m this fontet, list the average daily unit power level in MWe-Net for each day in the reporting month. Cmpute to the nearest whole megawatt.
l l
L 2 of 5
~
_ :a e
UtIT SEU1000EG AIO PODEIR REDUCTIQ6 000Er10.
50-443
' "-- i 1 gelt IMrE 10/04/89 REPGtt MNDI SEPENER,1989 0:?5PLETED BY P. IImrdrme
~2E[J!21DE f 6031 474-9521
^
(Ext. 4074) l Ib. Date Type Duration asason2 Methai of Licensee Cause & GuuCdve (Hours)
Shutting Event Irtion to Down Esecu.a.3 y,
4 ND HTTRIES PCR 'DIIS MNDI 1
2 3
F: Forced Reason:
Metled:
l S: Scharhi ed A-Mytirmant Failure (Pmp1 min) f-Ma,maal l
B-Maintenance at Test 2-iar.ucl Scnct l
C-RefielinJ 3-As h ic Scrami INHecJulatory Restriction 4-Cbati.rsami freum FrCn.aha: Training & License Epaminatim previces monih F-Administrative 5-Poncx M*rtion G-Operational Error (Explain)
(Danition e O)
H-Other (Explain) 9-Other (Ruplain) 3 of 5
_.. _... _ _ _ _, _ _ ~... _ _. _ _. _ _ _ _,. _ _ _..,,....
4
. q 3v
~.
, D00Wr10.
M Imrr sisuntwaak 1 trJE 10/04/99 (IRRBCTIVE 79LIlmME80! SW99EY RR SMTTY REIAGED EKTIPM!sff ME2) BY P. leerdnne REPORT PO mi SEP2 PEER,1989 m f603) 474-9521 (Ext. 4074) nm:
srsmt conemerr anenmecs acrias 09/05/89 Buergency 1-DGA-FY-AS-2 SolenGid failed time.esponse test Diesel Train A surveillance. W solenoid.
Generator Air Start Solenoid 4
09/20/89 Ibecare 1-NI-let-6690 High voltage power Mg: ply failure at IGuclear Train A signal poressor. Ieplaced power sqply.
Instnamentatica PAM Nuclear Instrumentation Channel 1
t i
4 of 5 1
d
= -
. ~, +
e,
.-,,,.m.
v.----..
--w
,w-....- -.,,,...--3,e,,~
,,w
,..,,e_.v,,,-c,,,.-,,.r_,..
r
-w.
.s-.
,_..,,,w,,
c.
V
- 1. o DOCKET K).
50-443 IMIT " ucA 1 DME 10/04/89 COGLLTED BY P. Nardans TILEFfENE f 603) 474-9521 (Ext. 4074) iulruzLuc neucaTIm REQUEST
- 1. Name of facility:
Ranhen:A thit 1
- 2. Scheduled data for next refueling shutdown: Not Scheduled i
- 3. Schedaled date for ;;ettart folbwirn refaelingt !bt Scheduled L Uill refwlirr; or resur. en ef qperaticn thermfter zoqvm a tachtdcal spW:tfication #mpe or othre It<wwe araxheut/P
.i.
f.takrew, at tMa tim.
l
- 5. Schedulrxi date(s) for subnitting licensing action and supprting j
infonnations i
Not 14plicable 1
- 6. Iryortant licensa.g ccnsiderations associaced with refueling, e.g.,
new or different fusi design or surolf.or, enrmrised design or j
perfonnance ar.alyala methods, significant changes in fuel design, 1
new operatJ ag suc=3 ares
)
None l
- 7. N number of fuel assemblies (a) in the core and (b) in the spent
)
fuel storage pools i
i (a) In Core:
193 (b) 0 I
- 8. 'Ihe smit licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or 1s planned, in number of fuel assmblies:
Present licensed capacity: 1236 i
No increase in storage capacity requested or planned.
J i
- 9. h projected date of the last refueling that can be discharged to i
the spent fuel pool assuming the present licensed capacity:
)
P Licensed capacity of 1236 fuel assemblies based en sixteen refuelings and full core offload capability.
h current licensed capacity is adequate until at least the year 2007.
5 of 5 1
,..