Semantic search

Jump to navigation Jump to search
 SiteStart dateTitleDescription
ENS 56612Summer11 May 2023 16:50:00Part 21 - CAP Screw Improper LengthThe following information was provided by the licensee via email: This is a non-emergency notification required by 10 CFR 21.21(d)(3)(i). A written notification in accordance with 10 CFR 21.21(d)(3)(ii) will be provided within 30 days. Steam generator emergency feedwater header discharge isolation check valves (XVC01009A-EF, XVC01009B-EF, and XVC01009C-EF) were designed specifically for and supplied to VC Summer Nuclear Station (VCSNS) by Flowserve under purchase order 4500653391 to replace the previous valves in the emergency feedwater system during refueling outage 27. On May 11, 2023, after valve installation, but prior to initial service, the socket head cap screws were identified as being shorter than the required design length. Valve drawings indicate a design length of 1.25" while the socket head cap screws received were 0.875". The correct length cap screws were installed prior to initial service. VCSNS completed a substantial safety hazard evaluation and determined that the improper length of the cap screws constituted a substantial safety hazard. This deviation in cap screw length resulted in a partial engagement of the cap screw to the cylinder rod extension and could potentially affect valve operation. The NRC Senior Resident Inspector has been notified.
ENS 57159Oconee3 June 2024 04:51:00Automatic Actuation of Emergency Feedwater SystemThe following information was provided by the licensee via phone and email: At 0051 EDT on June 3, 2024, with Unit 3 in Mode 3 at 0 percent power, an actuation of the emergency feedwater system (EFW) occurred as main steam pressure was being lowered as part of reactor coolant system (RCS) cooldown for a planned shutdown. The reason for the EFW auto-start was lowering levels in the 3A and 3B steam generators following loss of the operating main feedwater pump. The main feedwater pump automatically tripped when main steam pressure was lowered below the automatic feedwater isolation system (AFIS) actuation setpoint before AFIS channels were taken to bypass. The 3A and 3B motor driven emergency feedwater pumps automatically started as designed when the low steam generator level signal was received for the 3A and 3B steam generators. This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the EFW system. There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.
IR 05000269/2000004Oconee12 May 2020Final ASP Analysis - Oconee 1, 2, and 3 (IR 050002692000004)
IR 05000269/2000008Oconee12 May 2020Final ASP Analysis - Oconee 1, 2, and 3 (IR 050002692000008)
IR 05000269/2002002Oconee25 July 2002IR 05000269-02-002, IR 05000270-02-002 & IR 05000287-02-002, on 03/31/2002-06/29/2002, Duke Energy Corporation, Oconee Nuclear Station; Inservice Inspection and Other Activities.. Two non-cited Violations Identified
IR 05000269/2004003Oconee23 July 2004IR 05000269-04-003, IR 05000270-04-003 & IR 05000287-04-003, on 03/28/2004 - 06/26/2004, Oconee Nuclear Station, Units 1, 2, and 3; Identification and Resolution of Problems and Other Activities
IR 05000269/2004011Oconee10 September 2004IR 05000269-04-011, IR 0500270-04-011, IR 05000287-04-011, on 08/9-13/2004; Oconee Nuclear Station; Supplemental Inspection for Degraded Mitigating Systems Cornerstone
IR 05000269/2005005Oconee30 January 2006IR 05000269-05-005, IR 05000270-05-005, IR 05000287-05-005, and IR 07200004-05-001, on 10/01-12/31/2005, Duke Energy Corporation
IR 05000269/2005008Oconee28 July 2005IR 05000269-05-008, 05000270-05-008, 05000287-05-008; 06/13/2005 - 07/01/2005; Oconee Nuclear Station, Units 1, 2, and 3; Additional Baseline Inspection of the Problem Identification and Resolution Program
IR 05000269/2006004Oconee
07200040
26 October 2006IR 05000269-06-004, IR 05000270-06-004, and IR 05000287-06-004, on 07/01/2006 - 09/30/2006, Duke Power Company
IR 05000269/2007002Oconee26 April 2007IR 05000269-07-002, IR 05000270-07-002, IR 05000287-07-002, 01/01/2007 - 03/31/2007; Oconee Nuclear Station, Units 1, 2, and 3; Maintenance Effectiveness
IR 05000269/2007003Oconee30 July 2007IR 05000269-07-003, 05000270-07-003 & 05000287-07-003, on 04/01/2007 - 06/30/2007, Oconee, Units 1, 2, and 3, Licensed Operator Requalification, Maintenance Effectiveness, Radioactive Material
IR 05000269/2007005Oconee31 January 2008IR-05000269-07-005, 05000270-07-005, 05000287-07-005 on 10/10/2007 - 12/31/07 for Ocenee, Units 1,2 & 3; Refueling & Outage Activities
IR 05000269/2007009Oconee12 October 2007Supplemental IR 05000269-07-009, 05000270-07-009 and 05000287-07-009, on 08/27/2007 - 08/31/2007, Oconee Station, Units 1, 2 & 3
IR 05000269/2008002Oconee30 April 2008IR 05000269-08-002, 05000270-08-002, 05000287-08-002, on 01/01/2008 - 03/31/2008, Oconee Nuclear Station, Units 1, 2, and 3, Post Maintenance Testing and Event Follow-up
IR 05000269/2008004Oconee29 October 2008IR 05000269-08-004, 05000270-08-004, 05000287-08-004, on 07/01/2008 - 09/30/2008, Oconee Nuclear Station, Units 1, 2, and 3, Routine Integrated Inspection Report
IR 05000269/2010005Oconee28 January 2011IR 05000269-10-005, 05000270-10-005 & 05000287-10-005, 10/01/2010 - 12/31/2010, Oconee Nuclear Station Units 1, 2 and 3, Adverse Weather Protection, Flood Protection Measures, Plant Modifications, Surveillance Testing
IR 05000269/2011003Oconee27 July 2011IR 05000269-11-003, 05000270-11-003, 05000287-11-003, 05000270-11-012, 05000287-11-012, on 04/01/2011 - 06/30/2011, Oconee Nuclear Station Units 1, 2 and 3, Adverse Weather Protection, Other Activities
IR 05000269/2011004Oconee28 October 2011IR 05000269-11-004, 05000270-11-004, 05000287-11-004, on 07/01/2011 - 09/30/2011, Oconee Nuclear Station Units 1, 2 & 3, Operability Evaluations, Plant Modifications, Post-Maintenance Testing IR 5000269-11-501, 05000270-11-501, 05000287-11-
IR 05000269/2011005Oconee
07200040
13 January 2012IR 05000269-11-005, 05000270-11-005, 05000287-11-005; 10/01/2011 - 12/31/2011; Oconee Nuclear Station Units 1, 2 and 3; Radiological Hazard Assessment and Exposure Controls
IR 05000269/2011014Oconee13 May 2011NRC Temporary Instruction 2515/183 Inspection Report 05000269/2011014, 05000270/2011014 and 05000287/2011014
IR 05000269/2012005Oconee25 January 2013IR 05000269-12-005, 05000270-12-005, 05000287-12-005; 10/01/2012 - 12/31/2012; Oconee Nuclear Station Units 1, 2 and 3; Operability Determinations and Functionality Assessments
IR 05000269/2013003Oconee30 July 2013IR 05000269-13-003, 05000270-13-003, 05000287-13-003; 04/01/2013 - 06/30/2013; Oconee Nuclear Station Units 1, 2 and 3; Follow-up of Events and Notices of Enforcement Discretion
IR 05000269/2013005Oconee6 February 2014IR 05000269-13-005, 05000270-13-005, 05000287-13-005; 05000269-13-502, 05000270-13-502, 05000287-13-502; on 10/01/2013 - 12/31/2013; Oconee Nuclear Station Units 1, 2 and 3; Problem Identification and Resolution
IR 05000269/2014002Oconee12 May 2014IR 05000269-14-002, 05000270-14-002, 05000287-14-002; 01/01/2014 03/31/2014; Oconee Nuclear Station Units 1, 2 and 3, Integrated Inspection
IR 05000269/2014003Oconee7 August 2014IR 05000269-14-003, 05000270-14-003, 05000287-14-003; on 04/01/2014 - 06/30/2014; Oconee Nuclear Station Units 1, 2 and 3; Integrated Inspection Report
IR 05000269/2014005Oconee3 February 2015IR 05000269/2014005, 05000270/2014005, 05000287/2014005, on 10/01/2014 - 12/31/2014, Oconee Nuclear Station, Units 1, 2, and 3, Problem Identification and Resolution, and Follow-up of Events and Notices of Enforcement Discretion (NOED)
IR 05000269/2014007Oconee27 June 2014IR 05000269-14-007, 05000270-14-007 and 05000287-14-007; on 2/10/2014 - 03/28/2014, 04/28/2014 - 05/02/2014, and 5/9/2014 - 05/09/2014; Oconee Nuclear Station, Units 1, 2, and 3; Component Design Bases Inspection
IR 05000269/2015001Oconee29 April 2015IR 05000269/2015-001, 05000270/2015-001, 05000287/2015-001; 01/01/2015 - 03/31/2015; Oconee Nuclear Station Units 1, 2 and 3; Integrated Inspection Report
IR 05000269/2015004Oconee3 February 2016NRC Integrated Inspection Report 05000269/2015004, 05000270/2015004, 05000287/2015004
IR 05000269/2015007Oconee26 May 2015IR 05000269/2015007, 05000270/2015007, 05000287/2015007; 04/13/ 2015 - 04/30/2015; Oconee Nuclear Station Units 1, 2 and 3; Biennial Inspection of the Problem Identification and Resolution Program
IR 05000269/2016001Oconee3 May 2016NRC Integrated Inspection Report 05000269/2016001, 05000270/2016001, and 05000287/2016001, January 1, 2016 Through March 31, 2016
IR 05000269/2017008Oconee30 May 2017NRC Problem Identification and Resolution Inspection Report 05000269/2017008, 05000270/2017008 and 05000287/2017008
IR 05000269/2018001Oconee3 May 2018NRC Integrated Inspection Report 05000269/2018001, 05000270/2018001, and 05000287/2018001
IR 05000269/2020003Oconee4 November 2020Integrated Inspection Report 05000269/2020003, 05000270/2020003, 05000287/2020003, and 07200004/2020002
IR 05000269/2020004Oconee22 February 2021Reissue- Oconee Nuclear Station Integrated Inspection Report 05000269/2020004, 05000270/2020004, 05000287/2020004
IR 05000269/2021001Oconee23 April 2021Integrated Inspection Report 05000269/2021001 and 05000270/2021001 and 05000287/2021001
IR 05000269/2021002Oconee4 August 2021Integrated Inspection Report 05000269/2021002 and 05000270/2021002 and 05000287/2021002
IR 05000269/2021003Oconee28 October 2021Integrated Inspection Report 05000269/2021003 and 05000270/2021003 and 05000287/2021003
IR 05000269/2021010Oconee17 September 2021Design Basis Assurance Inspection (Programs) Inspection Report 05000269/2021010 and 05000270/2021010 and 05000287/2021010
IR 05000269/2021011Oconee2 June 2021Biennial Problem Identification and Resolution Inspection Report 05000269/2021011 and 05000270/2021011 and 05000287/2021011
IR 05000269/2022001Oconee4 May 2022Integrated Inspection Report 05000269/2022001, 05000270/2022001 and 05000287/2022001
IR 05000269/2022003Oconee7 November 2022Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003
IR 05000269/2023001Oconee12 May 2023Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001
IR 05000269/2023003Oconee
07200040
14 November 2023Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion
IR 05000270/2022002Oconee29 July 2022Integrated Inspection Report 05000269/ 2022002 and 05000270/2022002 and 05000287/2022002
IR 05000301/2002002Point Beach
Crystal River
24 July 2002IR 05000301-02-002, on 03/31/2002 - 06/29/2002, Crystal River Unit 3, Resident Integrated Inspection Report
IR 05000302/1982005Crystal River20 April 1982IE Insp Rept 50-302/82-05 on 820304-26.Noncompliance Noted:Failure to Adhere to Administrative Procedure During Plant Operation & Failure to Perform Type C Leak Rate Testing
IR 05000302/1985009Crystal River3 June 1985Insp Rept 50-302/85-09 on 850304-08.Open Items Noted: Deficient Qualification Documentation Files & Incomplete Procedure Preparations or Revs to Program for Preserving Qualified Status of Equipment Through Maint & Surveillance
IR 05000302/1985030Crystal River20 September 1985Insp Rept 50-302/85-30 on 850729-0802.No Violation or Deviation Noted.Major Areas Inspected:Fire Protection & Licensee Action Re Implementation of Requirements of 10CFR50,App R,Sections Iii.G,Iii.J,Iii.L. & Iii.O