Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17058A32512 April 2017Approval of Certified Fuel Handler Training and Retraining ProgramHigh Radiation Area
Job Performance Measure
Backfit
ML17066A13010 July 2017Pilgrim Nuclear Power Station - Issuance of Amendment No. 246, Revise Administrative Controls Section of Technical Specifications to Change Staffing and Training Requirements for Permanently Defueled Condition (CAC No. MF9304)
ML17093A89412 May 2017Pilgrim Nuclear Power Station - Relief Requests PNPS-ISI-001 and PNPS-ISI-002, Relief from ASME Code Volumetric Examination Requirements for the Fourth 10-Year Inservice Inspection Interval (CAC Nos. MF8092 and MF8093)
ML17264A10120 January 1988Issuance of Amendment No. 112 to License DPR-35, Revises Technical Specifications to Clarify Operability Requirements for the Standby Gas Treatment System and Control Room High Efficiency Air Filtration System
ML17264A1021 July 1986Issuance of Amendment No. 96, Revise Technical Specifications by Replacing Discontinued ASTM Standard References for Diesel Fuel Oil with Current ASTM Standard References (TAC No. 60935)
ML17264A10325 August 1987Issuance of Amendment No. 104, Administrative Changes to Technical Specifications Regarding Nuclear Safety Review Audit Committee
ML18128A0678 June 2018Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4Incorporated by reference
Through-Wall Leak
Through-Wall Leakage
ML18284A37530 November 2018Issuance of Amendment No. 248, Revise Site Emergency Plan for On-Shift and Emergency Response Organization Staffing to Address Permanently Defueled ConditionAbnormal operational transient
Severe Accident Management Guideline
Minimum staff
ML19122A19911 June 2019Review of Spent Fuel Management PlanExemption Request
ML19142A04318 December 2019Letter and Safety Evaluation, Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled ReactorProbabilistic Risk Assessment
B.5.b
Fukushima Dai-Ichi
Design basis earthquake
Spent Fuel Pool Instrumentation
License Renewal
Exemption Request
Earthquake
Control of Heavy Loads
Fuel cladding
Grace period
Fatality
ML19170A25022 August 2019Enclosure 3, Safety Evaluation for Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003)Exemption Request
Fire Protection Program
ML19235A05027 August 2019Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and ISFSI General License and Conforming AmendmentSafe Shutdown
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
ML19274C6742 January 2020Issuance of Amendment No. 251, Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled ConditionOffsite Dose Calculation Manual
Exemption Request
Minimum staff
Fire Protection Program
ML19276C4202 January 2020Issuance of Amendment No. 252, Request to Remove Cyber Security Plan Requirements for the Permanently Defueled ConditionCyber Security
Exemption Request
ML20328A2971 December 2020Amendment No. 253 - Non-Safeguards Version
ML21217A1755 August 2021Amendment No 255 Pilgrim Independent Spent Fuel Storage Installation (ISFSI) Only Physical Security Plan - Public Version