Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13105A018 | 16 May 2013 | Request for Additional Information Regarding APS Overall Integrated Plan in Response to Order EA-12-049 | Boric Acid Shutdown Margin Time to boil Internal Flooding FLEX |
ML13150A081 | 3 June 2013 | Request for Additional Information, Round 4, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev. 3 | Safe Shutdown Control of Heavy Loads |
ML13154A483 | 4 June 2013 | Rai'S Following Ifib Analysis of Ap'S 2013 Decommissioning Funding Status Report for Palo Verde Units 1, 2 and 3 | |
ML13157A065 | 10 June 2013 | Request for Additional Information, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (TAC MF0774-MF0776) | FLEX Spent Fuel Pool Instrumentation |
ML13161A265 | 20 June 2013 | Redacted, Request for Additional Information, 3/12/2012 NRC Order EA 12-049 Related to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (TAC Nos. MF0829-MF0831) | Boric Acid Shutdown Margin Time to boil Internal Flooding FLEX |
ML13170A096 | 19 June 2013 | Request for Additional Information Email, Review of 2013 Decommissioning Funding Status Report | |
ML13177A298 | 26 June 2013 | Request for Additional Information Email, License Amendment Request to Adopt TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 | |
ML13238A042 | 22 April 2014 | Draft RAI | |
ML13296A006 | 29 October 2013 | Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation | High Radiation Area Safe Shutdown Earthquake Cyber Security Finite Element Analysis FLEX Spent Fuel Pool Instrumentation Battery sizing Earthquake Fire Protection Program |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML14148A374 | 2 June 2014 | Request for Additional Information, Review of Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, Revision 16 (TAC No. D91660) | |
ML14155A495 | 4 June 2014 | Licensed Operator Fitness for Duty Test | Fitness for Duty |
ML14330A510 | 4 December 2014 | Request for Additional Information, Relief Request RR 52 - Request for Approval of Alternate to Flaw Removal, Flaw Characterization and Successive Examinations, for the Remainder of Its Useful Life | |
ML15113A497 | 23 April 2015 | Request for Additional Information Regarding Relief Request 53 | Boric Acid Liquid penetrant Dissimilar Metal Weld |
ML16006A366 | 6 January 2016 | NRR E-mail Capture - Request for Additional Information Change to Quality Assurance Program Description for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 | |
ML16060A002 | 26 February 2016 | NRR E-mail Capture - Palo Verde, Units 1, 2, and 3: Draft Request for Additional Information Amendment to Adopt TSTF-505 (CAC Nos. MF6576 MF6577 and MF6578) | Unanalyzed Condition Probabilistic Risk Assessment |
ML16064A497 | 7 March 2016 | Request for Additional Information, Adopt Technical Specification Task Force (TSTF)-505, Revision 1, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b | Probabilistic Risk Assessment |
ML16083A250 | 23 March 2016 | NRR E-mail Capture - Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Official RAIs for EAL LAR | High winds Reactor Vessel Water Level Ultimate heat sink |
ML16111B331 | 20 April 2016 | Notification of NRC Component Design Bases Inspection (05000528/2016007; 05000529/2016007; 05000530/2016007) and Initial Request for Information | Probabilistic Risk Assessment Temporary Modification |
ML16258A031 | 14 September 2016 | PVNGS Units 1-3 - Notif of NRC Insp of the Implementation of Mitigation Strategies and Spent Fuel Pool Instr. Orders and Emer. Prep. Comm./Staffing/Multi-Unit Dose Assessment Plns(05000528/ 2016009;05000529/2016009;and 05000530/2016009) and | Safe Shutdown Safe Shutdown Earthquake FLEX Spent Fuel Pool Instrumentation |
ML17003A018 | 2 January 2017 | NRR E-mail Capture - Palo Verde, Unit 3 - Draft RAIs for the Second Emergency LAR Associated with EDG 3B Failure | Probabilistic Risk Assessment Arc flash FLEX Job Performance Measure Continuous fire watch Fire Watch |
ML17082A446 | 28 March 2017 | PVNGS Units 1, 2, and 3 Transition to CE 16x16 Ngf - Draft RAIs Rev 3 | Boric Acid |
ML17107A005 | 14 April 2017 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Ngf LAR and Exemption RAIs (CAC Nos. MF8076 to MF8081) | Boric Acid |
ML17248A016 | 31 August 2017 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAI for RRs PRR-03, PRR-04 and PRR-05, Pump Testing | |
ML18066A703 | 7 March 2018 | Notification of Nrc Design Bases Assurance Inspection (Programs) 05000528/2018011, 05000529/2018011, and 05000530/2018011 Initial Request for Information | Commercial Grade Dedication |
ML18094B112 | 4 April 2018 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAIs for TSTF-505 (Initiative 4b) LAR (CAC Nos. MF6576, MF6577, and MF6578: EPID L-2015-LLA-0001) | Safe Shutdown Ultimate heat sink Fire Barrier Internal Flooding Probabilistic Risk Assessment |
ML18099A007 | 6 April 2018 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for 10 CFR 50.69 LAR (CAC Nos. MF9971, MF9972, and MF9973; EPID L-2017-LLA-0276) | High winds Internal Flooding Probabilistic Risk Assessment Tornado Missile Protection Large early release frequency Risk-Informed Steering Committee Earthquake |
ML18124A011 | 3 May 2018 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official Eeob RAIs for TSTF-505 (4b) LAR (CAC Nos. MF6576, MF6577, and MF6578; EPID L-2015-LLA-0001) | Anticipated operational occurrence Probabilistic Risk Assessment |
ML18192A393 | 24 October 1975 | Request for Additional Financial Information. (Response to Items 5 Through 12) | |
ML18221A510 | 23 August 2018 | Request for Additional Information License Amendment Request to Adopt Risk-Informed Completion Times (CAC Nos. MF6576, MF6577, and MF6578; EPID: L-2015-LLA-0001) | |
ML18227A867 | 15 August 2018 | NRR E-mail Capture - Request for Additional Information Relief Request 58: Impractical Examinations for the Third 10-Year Inservice Inspection Interval Arizona Public Service Company Palo Verde Nuclear Generation Station, Unit 2 | |
ML18229A313 | 17 August 2018 | NRR E-mail Capture - Request for Additional Information Relief Request 58: Impractical Examinations for the Third 10-Year Inservice Inspection Interval Arizona Public Service Company Palo Verde Nuclear Generation Station, Unit 2 - Second Se | |
ML18271A039 | 2 October 2018 | Non Proprietary - Supplemental Information Needed for Acceptance of Requested License Amendments and Exemptions Implementation of Framatome High Thermal Performance Fuel (Epids L-2018-LLA-0194 and L-2018-LLE-0010) | Exemption Request |
ML18341A025 | 3 December 2018 | Notification of NRC Design Bases Assurance Inspection (Teams)(05000528/2019011, 05000529/2019011, and 05000530/2019011) and Initial Request for Information | Ultimate heat sink Probabilistic Risk Assessment Temporary Modification Large early release frequency |
ML19008A361 | 8 January 2019 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR Associated with Response Time Testing of Pressure Transmitters | |
ML19044A734 | 13 February 2019 | NRR E-mail Capture - Palo Verde1, 2, and 3 - Official Requests for Additional Information for RR 62, Third and Fourth 10-Year ISI Intervals, Proposed Alternative - Pressurizer Heat Sleeve Repairs | |
ML19095A655 | 4 April 2019 | NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 3 - Mphb Official RAIs for RR-63, Impractical Examinations for the Third 10-Year ISI Interval | |
ML19155A184 | 30 May 2019 | NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 3 - Mvib Official RAIs for RR-63, Impractical Examinations for the Third 10-Year ISI Interval | |
ML19234A320 | 29 August 2019 | Redacted - Request for Additional Information for Amendment and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel (EPID L-2018-LLA-0194; EPID L-2018-LLE-0010) | Loop seal Anticipated operational occurrence Exemption Request Earthquake |
ML19317D078 | 13 November 2019 | NRR E-mail Capture - Palo Verde 1 - Requests for Additional Information on Unit 1 21st Refueling Outage Steam Generator Tube Inspection Report | |
ML20021A317 | 21 January 2020 | NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 1 - Official RAIs for Relief Request 64, Impractical Examinations for the Third 10-Year ISI Interval | |
ML20049A025 | 12 February 2020 | NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 1 - Official RAIs for License Amendment Request Associated with Changes to Emergency Plan Staffing Requirements | Minimum staff |
ML20049A099 | 14 February 2020 | Notification of Cyber Security Inspection (NRC Inspection Report 05000528/2020401; 05000529/2020401; and 05000530/2020401) and Request for Information | Cyber Security |
ML20118D136 | 28 April 2020 | Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information | |
ML20227A099 | 14 August 2020 | Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information | |
ML21011A197 | 12 January 2021 | Unit 2, and Unit 3 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000528/2021012, 05000529/2021012 and 05000530/2021012) and Request for Information | Safe Shutdown Commercial Grade Dedication Hydrostatic Probabilistic Risk Assessment Temporary Modification Aging Management Job Performance Measure Pandemic Fire Protection Program |
ML21023A021 | 13 January 2021 | PVNGS PI&R Request for Information RA | Temporary Modification Pandemic |
ML21042B969 | 18 February 2021 | Notification of NRC Design Bases Assurance Inspection and Initial Request for Information | Stroke time Power-Operated Valves |
ML21043A146 | 11 February 2021 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAI for an Order Associated with Indirect License Transfer from Public Service Company of New Mexico to Avangrid, Inc | |
ML21064A237 | 3 March 2021 | ISI Request for Information Rls | Boric Acid Nondestructive Examination Pandemic Scaffolding |