Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13105A01816 May 2013Request for Additional Information Regarding APS Overall Integrated Plan in Response to Order EA-12-049Boric Acid
Shutdown Margin
Time to boil
Internal Flooding
FLEX
ML13150A0813 June 2013Request for Additional Information, Round 4, Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev. 3Safe Shutdown
Control of Heavy Loads
ML13154A4834 June 2013Rai'S Following Ifib Analysis of Ap'S 2013 Decommissioning Funding Status Report for Palo Verde Units 1, 2 and 3
ML13157A06510 June 2013Request for Additional Information, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (TAC MF0774-MF0776)FLEX
Spent Fuel Pool Instrumentation
ML13161A26520 June 2013Redacted, Request for Additional Information, 3/12/2012 NRC Order EA 12-049 Related to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (TAC Nos. MF0829-MF0831)Boric Acid
Shutdown Margin
Time to boil
Internal Flooding
FLEX
ML13170A09619 June 2013Request for Additional Information Email, Review of 2013 Decommissioning Funding Status Report
ML13177A29826 June 2013Request for Additional Information Email, License Amendment Request to Adopt TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360
ML13238A04222 April 2014Draft RAI
ML13296A00629 October 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
Safe Shutdown Earthquake
Cyber Security
Finite Element Analysis
FLEX
Spent Fuel Pool Instrumentation
Battery sizing
Earthquake
Fire Protection Program
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML14148A3742 June 2014Request for Additional Information, Review of Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, Revision 16 (TAC No. D91660)
ML14155A4954 June 2014Licensed Operator Fitness for Duty TestFitness for Duty
ML14330A5104 December 2014Request for Additional Information, Relief Request RR 52 - Request for Approval of Alternate to Flaw Removal, Flaw Characterization and Successive Examinations, for the Remainder of Its Useful Life
ML15113A49723 April 2015Request for Additional Information Regarding Relief Request 53Boric Acid
Liquid penetrant
Dissimilar Metal Weld
ML16006A3666 January 2016NRR E-mail Capture - Request for Additional Information Change to Quality Assurance Program Description for Palo Verde Nuclear Generating Station, Units 1, 2, and 3
ML16060A00226 February 2016NRR E-mail Capture - Palo Verde, Units 1, 2, and 3: Draft Request for Additional Information Amendment to Adopt TSTF-505 (CAC Nos. MF6576 MF6577 and MF6578)Unanalyzed Condition
Probabilistic Risk Assessment
ML16064A4977 March 2016Request for Additional Information, Adopt Technical Specification Task Force (TSTF)-505, Revision 1, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4bProbabilistic Risk Assessment
ML16083A25023 March 2016NRR E-mail Capture - Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Official RAIs for EAL LARHigh winds
Reactor Vessel Water Level
Ultimate heat sink
ML16111B33120 April 2016Notification of NRC Component Design Bases Inspection (05000528/2016007; 05000529/2016007; 05000530/2016007) and Initial Request for InformationProbabilistic Risk Assessment
Temporary Modification
ML16258A03114 September 2016PVNGS Units 1-3 - Notif of NRC Insp of the Implementation of Mitigation Strategies and Spent Fuel Pool Instr. Orders and Emer. Prep. Comm./Staffing/Multi-Unit Dose Assessment Plns(05000528/ 2016009;05000529/2016009;and 05000530/2016009) andSafe Shutdown
Safe Shutdown Earthquake
FLEX
Spent Fuel Pool Instrumentation
ML17003A0182 January 2017NRR E-mail Capture - Palo Verde, Unit 3 - Draft RAIs for the Second Emergency LAR Associated with EDG 3B FailureProbabilistic Risk Assessment
Arc flash
FLEX
Job Performance Measure
Continuous fire watch
Fire Watch
ML17082A44628 March 2017PVNGS Units 1, 2, and 3 Transition to CE 16x16 Ngf - Draft RAIs Rev 3Boric Acid
ML17107A00514 April 2017NRR E-mail Capture - Palo Verde 1, 2, and 3 - Ngf LAR and Exemption RAIs (CAC Nos. MF8076 to MF8081)Boric Acid
ML17248A01631 August 2017NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAI for RRs PRR-03, PRR-04 and PRR-05, Pump Testing
ML18066A7037 March 2018Notification of Nrc Design Bases Assurance Inspection (Programs) 05000528/2018011, 05000529/2018011, and 05000530/2018011 Initial Request for InformationCommercial Grade Dedication
ML18094B1124 April 2018NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAIs for TSTF-505 (Initiative 4b) LAR (CAC Nos. MF6576, MF6577, and MF6578: EPID L-2015-LLA-0001)Safe Shutdown
Ultimate heat sink
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
ML18099A0076 April 2018NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for 10 CFR 50.69 LAR (CAC Nos. MF9971, MF9972, and MF9973; EPID L-2017-LLA-0276)High winds
Internal Flooding
Probabilistic Risk Assessment
Tornado Missile Protection
Large early release frequency
Risk-Informed Steering Committee
Earthquake
ML18124A0113 May 2018NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official Eeob RAIs for TSTF-505 (4b) LAR (CAC Nos. MF6576, MF6577, and MF6578; EPID L-2015-LLA-0001)Anticipated operational occurrence
Probabilistic Risk Assessment
ML18192A39324 October 1975Request for Additional Financial Information. (Response to Items 5 Through 12)
ML18221A51023 August 2018Request for Additional Information License Amendment Request to Adopt Risk-Informed Completion Times (CAC Nos. MF6576, MF6577, and MF6578; EPID: L-2015-LLA-0001)
ML18227A86715 August 2018NRR E-mail Capture - Request for Additional Information Relief Request 58: Impractical Examinations for the Third 10-Year Inservice Inspection Interval Arizona Public Service Company Palo Verde Nuclear Generation Station, Unit 2
ML18229A31317 August 2018NRR E-mail Capture - Request for Additional Information Relief Request 58: Impractical Examinations for the Third 10-Year Inservice Inspection Interval Arizona Public Service Company Palo Verde Nuclear Generation Station, Unit 2 - Second Se
ML18271A0392 October 2018Non Proprietary - Supplemental Information Needed for Acceptance of Requested License Amendments and Exemptions Implementation of Framatome High Thermal Performance Fuel (Epids L-2018-LLA-0194 and L-2018-LLE-0010)Exemption Request
ML18341A0253 December 2018Notification of NRC Design Bases Assurance Inspection (Teams)(05000528/2019011, 05000529/2019011, and 05000530/2019011) and Initial Request for InformationUltimate heat sink
Probabilistic Risk Assessment
Temporary Modification
Large early release frequency
ML19008A3618 January 2019NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR Associated with Response Time Testing of Pressure Transmitters
ML19044A73413 February 2019NRR E-mail Capture - Palo Verde1, 2, and 3 - Official Requests for Additional Information for RR 62, Third and Fourth 10-Year ISI Intervals, Proposed Alternative - Pressurizer Heat Sleeve Repairs
ML19095A6554 April 2019NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 3 - Mphb Official RAIs for RR-63, Impractical Examinations for the Third 10-Year ISI Interval
ML19155A18430 May 2019NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 3 - Mvib Official RAIs for RR-63, Impractical Examinations for the Third 10-Year ISI Interval
ML19234A32029 August 2019Redacted - Request for Additional Information for Amendment and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel (EPID L-2018-LLA-0194; EPID L-2018-LLE-0010)Loop seal
Anticipated operational occurrence
Exemption Request
Earthquake
ML19317D07813 November 2019NRR E-mail Capture - Palo Verde 1 - Requests for Additional Information on Unit 1 21st Refueling Outage Steam Generator Tube Inspection Report
ML20021A31721 January 2020NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 1 - Official RAIs for Relief Request 64, Impractical Examinations for the Third 10-Year ISI Interval
ML20049A02512 February 2020NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 1 - Official RAIs for License Amendment Request Associated with Changes to Emergency Plan Staffing RequirementsMinimum staff
ML20049A09914 February 2020Notification of Cyber Security Inspection (NRC Inspection Report 05000528/2020401; 05000529/2020401; and 05000530/2020401) and Request for InformationCyber Security
ML20118D13628 April 2020Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information
ML20227A09914 August 2020Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information
ML21011A19712 January 2021Unit 2, and Unit 3 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000528/2021012, 05000529/2021012 and 05000530/2021012) and Request for InformationSafe Shutdown
Commercial Grade Dedication
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
Aging Management
Job Performance Measure
Pandemic
Fire Protection Program
ML21023A02113 January 2021PVNGS PI&R Request for Information RATemporary Modification
Pandemic
ML21042B96918 February 2021Notification of NRC Design Bases Assurance Inspection and Initial Request for InformationStroke time
Power-Operated Valves
ML21043A14611 February 2021NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAI for an Order Associated with Indirect License Transfer from Public Service Company of New Mexico to Avangrid, Inc
ML21064A2373 March 2021ISI Request for Information RlsBoric Acid
Nondestructive Examination
Pandemic
Scaffolding