Issue date | Title | |
---|---|---|
05000390/FIN-2018010-02 | Potential Failure to Perform a 50.59 Evaluation for Auxiliary Building and Containment Isolation | |
CNL-14-154, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12 | 2 September 2014 | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12 |
CNL-14-180, Technical Specification Sections 3.0 and 3.10.1 | 22 January 2015 | Technical Specification Sections 3.0 and 3.10.1 |
CNL-15-088, Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13) | 17 June 2015 | Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13) |
CNL-15-121, Shutdown Technical Specifications for Component Cooling System and Essential Raw Cooling Water System to Support Dual Unit Operation | 17 June 2015 | Shutdown Technical Specifications for Component Cooling System and Essential Raw Cooling Water System to Support Dual Unit Operation |
CNL-15-137, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13 | 27 July 2015 | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13 |
CNL-15-153, Response to Request for Additional Information Related to Application to Revise Technical Specifications for Component Cooling Water and Essential Raw Cooling Water to Support Dual Unit Operation | 3 August 2015 | Response to Request for Additional Information Related to Application to Revise Technical Specifications for Component Cooling Water and Essential Raw Cooling Water to Support Dual Unit Operation |
CNL-15-168, Notification of Construction Substantially Complete and Request for Operating License | 12 August 2015 | Notification of Construction Substantially Complete and Request for Operating License |
CNL-15-170, Responses to NRC Audit Review Questions for Essential Raw Cooling Water and Component Cooling Water System License Amendment Request | 28 August 2015 | Responses to NRC Audit Review Questions for Essential Raw Cooling Water and Component Cooling Water System License Amendment Request |
CNL-15-177, Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Manual. | 4 September 2015 | Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Manual. |
CNL-15-181, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4 | 3 September 2015 | Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4 |
CNL-15-203, Response to Question Regarding GDC-5 Guidance for Dual Unit Shutdown | 21 September 2015 | Response to Question Regarding GDC-5 Guidance for Dual Unit Shutdown |
CNL-16-137, Response to Request for Additional Information Regarding Request to Revise Technical Specifications for Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources Operating . | 13 October 2016 | Response to Request for Additional Information Regarding Request to Revise Technical Specifications for Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources Operating . |
CNL-17-119, Application to Modify Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications 3.8.9 Regarding Alternating Current (AC) Vital Buses (WBN-TS-17-19) | 28 February 2018 | Application to Modify Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications 3.8.9 Regarding Alternating Current (AC) Vital Buses (WBN-TS-17-19) |
CNL-17-144, Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) | 20 December 2017 | Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) |
CNL-18-119, Application to Revise Watt Bar Nuclear Plant, Units 1 & 2, Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9, Regarding Electrical Power Systems (WBN-TS-1808) | 26 November 2018 | Application to Revise Watt Bar Nuclear Plant, Units 1 & 2, Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9, Regarding Electrical Power Systems (WBN-TS-1808) |
CNL-19-110, Application to Revise Technical Specifications 3.8.1, AC Sources - Operating (WBN-TS-18-10) | 17 December 2019 | Application to Revise Technical Specifications 3.8.1, AC Sources - Operating (WBN-TS-18-10) |
CNL-20-012, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16) | 19 May 2020 | Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16) |
CNL-21-062, Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board Cleaning (WBN-TS-19-019) | 29 September 2021 | Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board Cleaning (WBN-TS-19-019) |
IR 05000390/2014604 | 25 June 2014 | IR 05000391-14-604, 04/01/2014 - 05/17/2014, Watts Bar, Unit 2, NRC Integrated Inspection |
IR 05000390/2015608 | 21 October 2015 | Watts Bar Nuclear Plant 2 Integrated Inspection Report IR2015608 |
IR 05000390/2018010 | 4 May 2018 | NRC Evaluation of Changes, Tests, and Experiments Report No. 05000390/2018010 and 05000391/2018010 (Public) |
IR 05000391/2014604 | 25 June 2014 | IR 05000391-14-604, 04/01/2014 - 05/17/2014, Watts Bar, Unit 2, NRC Integrated Inspection |
L-19-022, Amendment 2 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted | 18 March 2019 | Amendment 2 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted |
ML022540925 | 23 September 2002 | Amendment No. 40, Irridiate Up to 2304 Tritium-Producing Burnable Absorber Rods in the Reactor Core |
ML053530127 | 13 December 2005 | Unit 1 - Proposed License Amendment Request Change No. WBN-TS-05-06 to Change the Steam Generator Secondary Side Water Level to Greater than or Equal to 321 Percent of Narrow Range |
ML053540054 | 15 December 2005 | Technical Specification (TS) Change No. TVA-WBN-TS-05-09 - Ice Condenser Ice Weight Increase Due to Replacement Steam Generators |
ML053540115 | 13 December 2005 | Proposed License Amendment Request Change No. WBN-TS-05-06 to Change the Steam Generator Secondary Side Water Level to Greater than or Equal to 32% of Narrow Range |
ML072190047 | 3 August 2007 | Unit 2 - Reactivation of Construction Activities |
ML080320443 | 29 January 2008 | Regulatory Framework for the Completion of Construction and Licensing Activities |
ML080770237 | 13 March 2008 | Regulatory Framework for the Completion of Construction and Licensing Activities for Unit 2 - Restructured Tables |
ML081010116 | 8 May 2008 | Review Topics for Safety Evaluation, Attachment 1 |
ML081700293 | 16 June 2008 | Response to Additional Information Request on Regulatory Framework for the Completion of Construction and Licensing, Revision 1 |
ML081930344 | 28 August 2008 | SECY-09-0012 - EnclosuLIC-110, Watts Bar Unit 2 License Application Review Appendix B, Safety Evaluation Review Responsibilities |
ML082670361 | 18 September 2008 | Unit 1 - License Amendment (TS-08-09) to Revise the Technical Specifications (Ts), Bases and Updated Final Safety Analysis Report (UFSAR) for the Unit 2 Vital Inverters |
ML082730261 | 8 October 2008 | Issuance of Amendment Regarding Control Room Envelope Habitability |
ML082840361 | 10 October 2008 | Status of Regulatory Framework for the Completion of Operating License Review (Tac MD9424) |
ML083460177 | 9 December 2008 | Unit 2 - Licensing Basis Preservation and Construction Refurbishment Program for Structures, Systems and Components (Sscs) |
ML090340721 | 18 December 2008 | Final Safety Analysis Report, Amendment 92, Section 9.0, Auxiliary Systems - 9.3.8 Heat Tracing |
ML090340727 | 18 December 2008 | Final Safety Analysis Report, Amendment 92, Section 6.0 Engineered Safety Features - 6.2.6 Containment Leakage Testing |
ML090340747 | 18 December 2008 | Final Safety Analysis Report, Amendment 92, Section 10.0, Main Steam and Power Conversion Systems - 10.4 Other Features of Steam and Power Conversion System |
ML090570741 | 28 February 2009 | NUREG-0847, Supp. 21, Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2 |
ML091400647 | 30 April 2009 | Final Safety Analysis Report (Fsar), Amendment 93, Section 8, Electric Power Through Page 8E-12 |
ML091400648 | 30 April 2009 | Final Safety Analysis Report (Fsar), Amendment 93, Section 9.0, Auxiliary Systems Through Figure 9.3-21 |
ML091400682 | 30 April 2009 | Final Safety Analysis Report (Fsar), Amendment 93, Section 6.0, Engineered Safety Features Through Page 6.2.6-28 |
ML091400694 | 30 April 2009 | Final Safety Analysis Report (Fsar), Amendment 93, Section 10, Main Steam and Power Conversion Systems Through Figure 10.4-37 |
ML092170587 | 14 August 2009 | Confirmation of Schedule for Submission of Information to Support Operating Licence Application Review |
ML092470307 | 27 August 2009 | Final Safety Analysis Report, Amendment 94, Section 6, Engineered Safety Features, Table of Contents Through Table 6.2.6-4 |
ML092470310 | 27 August 2009 | Final Safety Analysis Report, Amendment 94, Section 8, Electric Power |
ML092470325 | 27 August 2009 | Final Safety Analysis Report, Amendment 94, Section 9, Auxiliary Systems, Table of Contents Through Figure 9.3-21 |