Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
05000250/LER-2014-002 | Reactor Coolant System Pressure Boundary Leakage at Pressurizer Heater Sleeve Attachment Weld | |
IR 05000250/2001006 | 25 January 2002 | IR 05000250/2001-006, IR 05000251/2001-006 Turkey Point Nuclear Plant, Inspection on 09/30/2001 - 12/29/2001 |
IR 05000250/2004005 | 28 January 2005 | IR 05000250-04-005, IR 05000251-04-005 on 09/26/2004 - 12/31/2004 for Turkey Point, Units 3 and 4; Event Followup; Inservice Inspection Activities; and Other Activities |
IR 05000250/2007004 | 30 October 2007 | |
IR 05000250/2010005 | 27 January 2011 | |
IR 05000250/2014003 | 31 July 2014 | IR 05000250-14-003, 05000251-14-003; on 01/01/2014 - 03/31/2014; Turkey Point Nuclear Plant, Units 3 & 4; Surveillance Testing |
IR 05000250/2018004 | 11 February 2019 | Nuclear Regulatory Commission Integrated Inspection Report 05000250/2018004 and 05000251/2018004 |
IR 05000250/2021004 | 2 February 2022 | Integrated Inspection Report 05000250/2021004 and 05000251/2021004 |
Information Notice 1998-13, Post-Refueling Outage Reactor Pressure Vessel Leak Testing Before Core Criticality | 20 April 1998 | Post-Refueling Outage Reactor Pressure Vessel Leak Testing Before Core Criticality |
L-2002-061, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity | 2 April 2002 | Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity |
L-2003-007, NRC Bulletin 2002-01, Request for Additional Information Response | 31 January 2003 | NRC Bulletin 2002-01, Request for Additional Information Response |
L-2003-104, Response to NRC Comment on Relief Request Risk Informed ISI | 14 May 2003 | Response to NRC Comment on Relief Request Risk Informed ISI |
L-2003-162, Inservice Inspection Report: Submittal of the NIS-2 Forms Omitted from L-2003-162 Submittal | 22 July 2003 | Inservice Inspection Report: Submittal of the NIS-2 Forms Omitted from L-2003-162 Submittal |
L-2003-194, Revision to End of Cycle 18 Steam Generator Tube Plugging Report (L-2003-194) | 30 July 2003 | Revision to End of Cycle 18 Steam Generator Tube Plugging Report (L-2003-194) |
L-2003-234, NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity Inspection Results. | 19 December 2003 | NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity Inspection Results. |
L-2003-260, Clarification Regarding NDE Examinations for the Risk Informed Inservice Inspection Relief Request | 13 October 2003 | Clarification Regarding NDE Examinations for the Risk Informed Inservice Inspection Relief Request |
L-2004-025, Transmittal of Inservice Inspection Report | 30 January 2004 | Transmittal of Inservice Inspection Report |
L-2004-144, Revised Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity | 27 July 2004 | Revised Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity |
L-2004-160, NRC Bulletin 2004-01 Inspection of Alloy 821182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors | 27 July 2004 | NRC Bulletin 2004-01 Inspection of Alloy 821182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors |
L-2005-046, Refueling Outage Summary of Inservice Inspection Examinations. | 15 February 2005 | Refueling Outage Summary of Inservice Inspection Examinations. |
L-2005-136, NRC BL-03-002 Plant Reactor Pressure Vessel Lower Head Penetrations Post Outage Inspection Results | 20 June 2005 | NRC BL-03-002 Plant Reactor Pressure Vessel Lower Head Penetrations Post Outage Inspection Results |
L-2006-158, Inservice Inspection Record | 28 June 2006 | Inservice Inspection Record |
L-2007-013, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds | 31 January 2007 | Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds |
L-2007-036, Inservice Inspection Report | 8 March 2007 | Inservice Inspection Report |
L-2013-113, Inservice Inspection Plan Submittal of Relief Request No. 12 | 24 May 2013 | Inservice Inspection Plan Submittal of Relief Request No. 12 |
L-2013-288, Response to Request for Additional Information and Re-submittal of Relief Request No. 12 | 9 October 2013 | Response to Request for Additional Information and Re-submittal of Relief Request No. 12 |
L-2014-073, Inservice Inspection Plan Relief Request No. 14 | 14 March 2014 | Inservice Inspection Plan Relief Request No. 14 |
L-2014-096, Inservice Inspection Plan - Fifth Inspection Interval Unit 3 Relief Request No. 1 | 4 April 2014 | Inservice Inspection Plan - Fifth Inspection Interval Unit 3 Relief Request No. 1 |
L-2015-020, Closeout of the Fourth Ten-Year Inservice Inspection (ISI) Interval Relief Requests Nos. 15, 16, 17 | 13 February 2015 | Closeout of the Fourth Ten-Year Inservice Inspection (ISI) Interval Relief Requests Nos. 15, 16, 17 |
L-2015-040, Submittal of Fifth 10 Year Interval Inservice Inspection (ISI) Program Plan | 11 March 2015 | Submittal of Fifth 10 Year Interval Inservice Inspection (ISI) Program Plan |
L-2015-100, Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 2 | 8 June 2015 | Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 2 |
L-2016-006, Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 4 | 14 January 2016 | Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 4 |
L-2018-166, WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings. | 31 October 2018 | WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings. |
L-2022-035, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II | 10 March 2022 | Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II |
L-2022-051, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information | 29 March 2022 | Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information |
ML020330094 | 24 January 2002 | Inservice Inspection Report for Turkey Point, Unit 3, in Accordance with the Provisions of the ASME Code, Section XI |
ML022490140 | 19 February 2002 | to 33-5016874-00, CRDM Id Temperbead Repair Stress Report for Turkey Point, Unit 3. |
ML023260260 | 22 November 2002 | Request for Additional Information Regarding Bulletin 2002-01, 60-Day Response |
ML032130558 | 1 August 2003 | Evaluation of Relief Request Concerning risk-informed Inservice Inspection |
ML033040149 | 30 October 2003 | Clarification Regarding Relief Request Concerning risk-informed Inservice Inspection |
ML050350363 | 3 March 2005 | Relief Request 1, Authorization of ISI Interval |
ML050810621 | 22 April 2005 | Turkey Pt. Units 3 & 4, Ltr, Response to Bulletin 2003-02 Leakage from RPV Lh Penetrations and RCPB Integrity |
ML060270304 | 27 January 2006 | Notification of Inspection and Request for Information |
ML062500118 | 29 August 2006 | Notification of Inspection and Request for Information |
ML080670499 | 7 March 2008 | Notification of Inspection and Request of Information |
ML090350453 | 31 January 2003 | NRC Bulletin 2002-01 Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, Request for Additional Information Response |
ML090440188 | 13 February 2009 | Notification of Inspection and Request for Information |
ML101720552 | 8 June 2010 | Transcript for Advisory Committee on Reactor Safeguards - License Renewal Subcommittee (Duane Arnold), Pages 1-186 |
ML110280004 | 27 January 2011 | Integrated Inspection Report 2010-005 |
ML13282A185 | 9 September 2013 | NRR E-mail Capture - RAIs for TACs MF1903-08 Regarding Relief Request #12 |