Semantic search

Jump to navigation Jump to search
 Issue dateTitle
05000250/LER-2014-002Reactor Coolant System Pressure Boundary Leakage at Pressurizer Heater Sleeve Attachment Weld
IR 05000250/200100625 January 2002IR 05000250/2001-006, IR 05000251/2001-006 Turkey Point Nuclear Plant, Inspection on 09/30/2001 - 12/29/2001
IR 05000250/200400528 January 2005IR 05000250-04-005, IR 05000251-04-005 on 09/26/2004 - 12/31/2004 for Turkey Point, Units 3 and 4; Event Followup; Inservice Inspection Activities; and Other Activities
IR 05000250/200700430 October 2007
IR 05000250/201000527 January 2011
IR 05000250/201400331 July 2014IR 05000250-14-003, 05000251-14-003; on 01/01/2014 - 03/31/2014; Turkey Point Nuclear Plant, Units 3 & 4; Surveillance Testing
IR 05000250/201800411 February 2019Nuclear Regulatory Commission Integrated Inspection Report 05000250/2018004 and 05000251/2018004
IR 05000250/20210042 February 2022Integrated Inspection Report 05000250/2021004 and 05000251/2021004
Information Notice 1998-13, Post-Refueling Outage Reactor Pressure Vessel Leak Testing Before Core Criticality20 April 1998Post-Refueling Outage Reactor Pressure Vessel Leak Testing Before Core Criticality
L-2002-061, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity2 April 2002Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity
L-2003-007, NRC Bulletin 2002-01, Request for Additional Information Response31 January 2003NRC Bulletin 2002-01, Request for Additional Information Response
L-2003-104, Response to NRC Comment on Relief Request Risk Informed ISI14 May 2003Response to NRC Comment on Relief Request Risk Informed ISI
L-2003-162, Inservice Inspection Report: Submittal of the NIS-2 Forms Omitted from L-2003-162 Submittal22 July 2003Inservice Inspection Report: Submittal of the NIS-2 Forms Omitted from L-2003-162 Submittal
L-2003-194, Revision to End of Cycle 18 Steam Generator Tube Plugging Report (L-2003-194)30 July 2003Revision to End of Cycle 18 Steam Generator Tube Plugging Report (L-2003-194)
L-2003-234, NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity Inspection Results.19 December 2003NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity Inspection Results.
L-2003-260, Clarification Regarding NDE Examinations for the Risk Informed Inservice Inspection Relief Request13 October 2003Clarification Regarding NDE Examinations for the Risk Informed Inservice Inspection Relief Request
L-2004-025, Transmittal of Inservice Inspection Report30 January 2004Transmittal of Inservice Inspection Report
L-2004-144, Revised Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity27 July 2004Revised Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity
L-2004-160, NRC Bulletin 2004-01 Inspection of Alloy 821182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors27 July 2004NRC Bulletin 2004-01 Inspection of Alloy 821182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors
L-2005-046, Refueling Outage Summary of Inservice Inspection Examinations.15 February 2005Refueling Outage Summary of Inservice Inspection Examinations.
L-2005-136, NRC BL-03-002 Plant Reactor Pressure Vessel Lower Head Penetrations Post Outage Inspection Results20 June 2005NRC BL-03-002 Plant Reactor Pressure Vessel Lower Head Penetrations Post Outage Inspection Results
L-2006-158, Inservice Inspection Record28 June 2006Inservice Inspection Record
L-2007-013, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds31 January 2007Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds
L-2007-036, Inservice Inspection Report8 March 2007Inservice Inspection Report
L-2013-113, Inservice Inspection Plan Submittal of Relief Request No. 1224 May 2013Inservice Inspection Plan Submittal of Relief Request No. 12
L-2013-288, Response to Request for Additional Information and Re-submittal of Relief Request No. 129 October 2013Response to Request for Additional Information and Re-submittal of Relief Request No. 12
L-2014-073, Inservice Inspection Plan Relief Request No. 1414 March 2014Inservice Inspection Plan Relief Request No. 14
L-2014-096, Inservice Inspection Plan - Fifth Inspection Interval Unit 3 Relief Request No. 14 April 2014Inservice Inspection Plan - Fifth Inspection Interval Unit 3 Relief Request No. 1
L-2015-020, Closeout of the Fourth Ten-Year Inservice Inspection (ISI) Interval Relief Requests Nos. 15, 16, 1713 February 2015Closeout of the Fourth Ten-Year Inservice Inspection (ISI) Interval Relief Requests Nos. 15, 16, 17
L-2015-040, Submittal of Fifth 10 Year Interval Inservice Inspection (ISI) Program Plan11 March 2015Submittal of Fifth 10 Year Interval Inservice Inspection (ISI) Program Plan
L-2015-100, Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 28 June 2015Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 2
L-2016-006, Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 414 January 2016Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 4
L-2018-166, WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings.31 October 2018WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings.
L-2022-035, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II10 March 2022Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II
L-2022-051, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information29 March 2022Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information
ML02033009424 January 2002Inservice Inspection Report for Turkey Point, Unit 3, in Accordance with the Provisions of the ASME Code, Section XI
ML02249014019 February 2002to 33-5016874-00, CRDM Id Temperbead Repair Stress Report for Turkey Point, Unit 3.
ML02326026022 November 2002Request for Additional Information Regarding Bulletin 2002-01, 60-Day Response
ML0321305581 August 2003Evaluation of Relief Request Concerning risk-informed Inservice Inspection
ML03304014930 October 2003Clarification Regarding Relief Request Concerning risk-informed Inservice Inspection
ML0503503633 March 2005Relief Request 1, Authorization of ISI Interval
ML05081062122 April 2005Turkey Pt. Units 3 & 4, Ltr, Response to Bulletin 2003-02 Leakage from RPV Lh Penetrations and RCPB Integrity
ML06027030427 January 2006Notification of Inspection and Request for Information
ML06250011829 August 2006Notification of Inspection and Request for Information
ML0806704997 March 2008Notification of Inspection and Request of Information
ML09035045331 January 2003NRC Bulletin 2002-01 Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, Request for Additional Information Response
ML09044018813 February 2009Notification of Inspection and Request for Information
ML1017205528 June 2010Transcript for Advisory Committee on Reactor Safeguards - License Renewal Subcommittee (Duane Arnold), Pages 1-186
ML11028000427 January 2011Integrated Inspection Report 2010-005
ML13282A1859 September 2013NRR E-mail Capture - RAIs for TACs MF1903-08 Regarding Relief Request #12