TSTF-03-02, Traveler - August 12, 2003 Transmits TSTF-423, Technical Specifications End States, NEDC-32988-A. | 12 August 2003 | Traveler - August 12, 2003 Transmits TSTF-423, Technical Specifications End States, NEDC-32988-A. | Safe Shutdown Stroke time Recently irradiated fuel Offsite Circuit |
TSTF-03-06, Transmittal Letter - Withdrawal of Travelers from NRC Review | 31 October 2003 | Transmittal Letter - Withdrawal of Travelers from NRC Review | |
TSTF-03-09, Traveler - November 10, 2003 - Transmits TSTF-430, R.1, AOT Extension to 7 Days for LPI and Containment Spray (BAW-2295-A, Rev. 1) | 10 November 2003 | Traveler - November 10, 2003 - Transmits TSTF-430, R.1, AOT Extension to 7 Days for LPI and Containment Spray (BAW-2295-A, Rev. 1) | |
TSTF-03-10, Traveler - November 10, 2003, Transmits Response to June 23, 2003 Request for Additional Information on TSTF-422, R.1, Change in Technical Specifications End States (CE NPSD-1186). | 10 November 2003 | Traveler - November 10, 2003, Transmits Response to June 23, 2003 Request for Additional Information on TSTF-422, R.1, Change in Technical Specifications End States (CE NPSD-1186). | |
TSTF-03-11, Traveler - November 17, 2003, Transmits TSTF-372, R.3 Addition of LCO 3.0.8, Inoperability of Snubbers | 17 November 2003 | Traveler - November 17, 2003, Transmits TSTF-372, R.3 Addition of LCO 3.0.8, Inoperability of Snubbers | Probabilistic Risk Assessment Earthquake |
TSTF-03-12, Traveler - November 10, 2003, Transmits TSTF-429, R.3 Ice Mass Determination Surveillance Requirements. | 10 November 2003 | Traveler - November 10, 2003, Transmits TSTF-429, R.3 Ice Mass Determination Surveillance Requirements. | Condition Adverse to Quality |
TSTF-04-03, TSTF-372, Revision 4, Addition of LCO 3.0.8, Inoperability of Snubbers. | 23 April 2004 | TSTF-372, Revision 4, Addition of LCO 3.0.8, Inoperability of Snubbers. | Probabilistic Risk Assessment Earthquake |
TSTF-04-04, TSTF-467, Revision 0, Add Restriction for Lowest Loop T(Ave) During Mode 2 Physics Testing. | 28 June 2004 | TSTF-467, Revision 0, Add Restriction for Lowest Loop T(Ave) During Mode 2 Physics Testing. | |
TSTF-04-05, TSTF-468, Revision 0, Declare Systems Inoperable Due to an Inoperable MCC or Distribution Panel in Lieu of ITS 3.8.9. | 30 August 2004 | TSTF-468, Revision 0, Declare Systems Inoperable Due to an Inoperable MCC or Distribution Panel in Lieu of ITS 3.8.9. | Safe Shutdown Post Accident Monitoring Offsite Circuit |
TSTF-04-07, TSTF-475, Revision 0, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action. | 30 August 2004 | TSTF-475, Revision 0, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action. | Shutdown Margin Anticipated operational occurrence Scram Discharge Volume Overtravel Earthquake Grace period |
TSTF-04-08, TSTF-425, Revision 0, Relocate Surveillance Frequencies to Licensee Control. | 31 August 2004 | TSTF-425, Revision 0, Relocate Surveillance Frequencies to Licensee Control. | Safe Shutdown Reactor Vessel Water Level High Radiation Area Stroke time Hydrostatic Probabilistic Risk Assessment Squib Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency Battery sizing Overtravel Fuel cladding Pressure Boundary Leakage Offsite Circuit Backfit Unidentified leakage |
TSTF-04-09, TSTF-426, Revision 0, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c | 30 August 2004 | TSTF-426, Revision 0, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c | |
TSTF-04-10, TSTF-476, Revision 0, Improved BPWS Control Rod Insertion Process (NEDO-33091) | 30 August 2004 | TSTF-476, Revision 0, Improved BPWS Control Rod Insertion Process (NEDO-33091) | Shutdown Margin Probabilistic Risk Assessment Scram Discharge Volume |
TSTF-04-11, TSTF-477, Revision 0, Add Action for Two Inoperable Control Room AC Subsystems | 30 August 2004 | TSTF-477, Revision 0, Add Action for Two Inoperable Control Room AC Subsystems | Post Accident Monitoring Recently irradiated fuel |
TSTF-04-12, Submittal and Request for Fee Waiver for Review of TSTF-478, Revision 0, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control. | 25 April 2005 | Submittal and Request for Fee Waiver for Review of TSTF-478, Revision 0, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control. | Probabilistic Risk Assessment Severe Accident Management Guideline Fuel cladding Backfit |
TSTF-04-13, TSTF-449, Revision 2, Steam Generator Tube Integrity. | 7 October 2004 | TSTF-449, Revision 2, Steam Generator Tube Integrity. | Non-Destructive Examination Post Accident Monitoring Nondestructive Examination Fuel cladding Pressure Boundary Leakage |
TSTF-04-15, TSTF-479, Revision 0, Changes to Reflect Revision of 10 CFR 50.55a. | 2 December 2004 | TSTF-479, Revision 0, Changes to Reflect Revision of 10 CFR 50.55a. | Stroke time Incorporated by reference Offsite Circuit |
TSTF-04-16, TSTF-446, Revision 1, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791). | 31 January 2005 | TSTF-446, Revision 1, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791). | High Radiation Area Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program Fuel cladding |
TSTF-05-03, Transmittal of TSTF-482, Revision 0, Correct LCO 3.0.6 Bases, for NRC Consideration | 15 February 2005 | Transmittal of TSTF-482, Revision 0, Correct LCO 3.0.6 Bases, for NRC Consideration | Offsite Circuit |
TSTF-05-05, Letter Transmitting TSTF-449, Revision 4, Steam Generator Tube Integrity. | 14 April 2005 | Letter Transmitting TSTF-449, Revision 4, Steam Generator Tube Integrity. | Non-Destructive Examination Post Accident Monitoring Nondestructive Examination Fuel cladding Pressure Boundary Leakage |
TSTF-05-06, TSTF-05-06, Transmit TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities. | 5 May 2005 | TSTF-05-06, Transmit TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities. | Hydrostatic |
TSTF-05-07, Submittal and Request for Fee Waiver for Review of TSTF-343, Revision 1, Containment Structural Integrity. | 29 June 2005 | Submittal and Request for Fee Waiver for Review of TSTF-343, Revision 1, Containment Structural Integrity. | |
TSTF-05-08, Submittal and Request for Fee Waiver for Review of TSTF-485, Revision 0, Correct Example 1.4-1. | 31 May 2005 | Submittal and Request for Fee Waiver for Review of TSTF-485, Revision 0, Correct Example 1.4-1. | Missed surveillance |
TSTF-05-10, TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. | 20 June 2005 | TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. | Safe Shutdown Time of Discovery Shutdown Margin Offsite Circuit |
TSTF-05-12, TSTF-05-12, Transmit TSTF-448, Revision 2, Control Room Habitability. | 18 August 2005 | TSTF-05-12, Transmit TSTF-448, Revision 2, Control Room Habitability. | Safe Shutdown Condition Adverse to Quality Recently irradiated fuel |
TSTF-05-13, Technical Specification Task Force (TSTF) Response to May 25, 2005 Notice of Opportunity to Comment on Model Safety Evaluation on Technical Specification Improvement Re Revision to the Completion Time in STS 3.6.1.3, Primary Containment I | 25 July 2005 | Technical Specification Task Force (TSTF) Response to May 25, 2005 Notice of Opportunity to Comment on Model Safety Evaluation on Technical Specification Improvement Re Revision to the Completion Time in STS 3.6.1.3, Primary Containment Iso | Probabilistic Risk Assessment Large early release frequency |
TSTF-05-14, Writer'S Guide for Plant-Specific Improved Technical Specifications, TSTF-GG-05-01 | 9 August 2005 | Writer'S Guide for Plant-Specific Improved Technical Specifications, TSTF-GG-05-01 | |
TSTF-05-15, TSTF-454, Revision 1, Extend PCIV Completion Times (NEDC-33046) | 21 September 2005 | TSTF-454, Revision 1, Extend PCIV Completion Times (NEDC-33046) | High Radiation Area Squib Large early release frequency |
TSTF-05-16, TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. | 13 September 2005 | TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. | Pressure Boundary Leakage Power change |
TSTF-05-17, TSTF-IG-05-02, Implementation Guidance for TSTF-423, Revision 0, Technical Specifications End States, NEDC-32988-A. | 19 September 2005 | TSTF-IG-05-02, Implementation Guidance for TSTF-423, Revision 0, Technical Specifications End States, NEDC-32988-A. | Safe Shutdown |
TSTF-05-18, Transmittal of TSTF-491, Revision 0, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications. | 13 September 2005 | Transmittal of TSTF-491, Revision 0, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications. | Stroke time |
TSTF-05-19, TSTF-492, Rev. 0, Modify RHR - High Water Level Bases to Address Decay Heat Removal with Upper Internals Installed. | 25 October 2005 | TSTF-492, Rev. 0, Modify RHR - High Water Level Bases to Address Decay Heat Removal with Upper Internals Installed. | Boric Acid Fuel cladding |
TSTF-05-20, TSTF-05-20, Request for Review Fee Billing Change for TSTF-468, Revision 0 | 13 October 2005 | TSTF-05-20, Request for Review Fee Billing Change for TSTF-468, Revision 0 | |
TSTF-05-21, TSTF-05-21, Transmittal of TSTF-491, Revision 1, Removal of Main Steam & Main Feedwater Valve Isolation Times from Technical Specifications. | 13 October 2005 | TSTF-05-21, Transmittal of TSTF-491, Revision 1, Removal of Main Steam & Main Feedwater Valve Isolation Times from Technical Specifications. | Stroke time |
TSTF-05-22, Response to the Nrc'S August 15, 2005 and September 19, 2005 Letters Regarding Fee Exemption Requests for Traveler Reviews | 2 November 2005 | Response to the Nrc'S August 15, 2005 and September 19, 2005 Letters Regarding Fee Exemption Requests for Traveler Reviews | Exemption Request |
TSTF-06-01, TSTF-412, Revision 2, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable. | 31 January 2006 | TSTF-412, Revision 2, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable. | Power change |
TSTF-06-02, TSTF-459, Revision 1, Provide an Exception to the Requirement to Have One RHR Shutdown Cooling System in Operation | 13 February 2006 | TSTF-459, Revision 1, Provide an Exception to the Requirement to Have One RHR Shutdown Cooling System in Operation | Safe Shutdown Shutdown Margin Time to boil |
TSTF-06-03, TSTF-493, Revision 0, Clarify Application of Setpoint Methodology for LSSS Functions. | 27 January 2006 | TSTF-493, Revision 0, Clarify Application of Setpoint Methodology for LSSS Functions. | Reactor Vessel Water Level Anticipated operational occurrence Incorporated by reference Scram Discharge Volume Operability Determination Fuel cladding Backfit Power Uprate |
TSTF-06-04, Technical Specification Task Force (TSTF) Response to the December 14, 2005 Technical Specification Improvement for Boiling Water Reactors Plants to Risk-Inform Requirements Regarding Selected Required Action End States Using the Consolid | 13 January 2006 | Technical Specification Task Force (TSTF) Response to the December 14, 2005 Technical Specification Improvement for Boiling Water Reactors Plants to Risk-Inform Requirements Regarding Selected Required Action End States Using the Consolidat | |
TSTF-06-05, TSTF-427, Revision 1, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | 3 February 2006 | TSTF-427, Revision 1, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | Fire Barrier Internal Flooding Probabilistic Risk Assessment Tornado Generated Missile Large early release frequency Turbine Missile |
TSTF-06-06, TSTF-477, Revision 1, Add Action for Two Inoperable Control Room AC Subsystems. | 31 March 2006 | TSTF-477, Revision 1, Add Action for Two Inoperable Control Room AC Subsystems. | Post Accident Monitoring |
TSTF-06-07, TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability. | 3 May 2006 | TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability. | Fire Barrier Tornado Missile Internal Flooding Probabilistic Risk Assessment Large early release frequency Turbine Missile |
TSTF-06-08, Technical Specification Task Force Request for NRC Reconsideration of January 31, 2003 Letter Regarding Collection of Review Fees for Generic Standard Technical Specifications Improvements | 28 April 2006 | Technical Specification Task Force Request for NRC Reconsideration of January 31, 2003 Letter Regarding Collection of Review Fees for Generic Standard Technical Specifications Improvements | |
TSTF-06-11, Response to NRC Request for Additional Information Regarding TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities, Dated April 7, 2006 | 5 June 2006 | Response to NRC Request for Additional Information Regarding TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities, Dated April 7, 2006 | Hydrostatic |
TSTF-06-14, TSTF-497, Revision 0, Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less. | 12 July 2006 | TSTF-497, Revision 0, Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less. | |
TSTF-06-15, Response to NRC Request for Review of Draft Safety Evaluation and Request for Additional Information Regarding TSTF-412, Revision 2, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Dated 04/14/2006 | 12 July 2006 | Response to NRC Request for Review of Draft Safety Evaluation and Request for Additional Information Regarding TSTF-412, Revision 2, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Dated 04/14/2006 | |
TSTF-06-19, TSTF-477, Revision 2, Add Action for Two Inoperable Control Room AC Subsystems | 18 July 2006 | TSTF-477, Revision 2, Add Action for Two Inoperable Control Room AC Subsystems | Post Accident Monitoring |
TSTF-06-20, TSTF-495, Revision 0, Bases Change to Address GE Part 21 SC05-03. | 18 July 2006 | TSTF-495, Revision 0, Bases Change to Address GE Part 21 SC05-03. | Reactor Vessel Water Level Fuel cladding |
TSTF-06-22, TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems. | 8 September 2006 | TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems. | Post Accident Monitoring |
TSTF-06-25, Response to NRC Request for Additional Information Regarding TSTF-487, Revision 0, Relocate DNB Parameters to the COLR, Dated September 5, 2006 | 27 October 2006 | Response to NRC Request for Additional Information Regarding TSTF-487, Revision 0, Relocate DNB Parameters to the COLR, Dated September 5, 2006 | |