Semantic search

Jump to navigation Jump to search
 Start dateSiteTitleDescription
IR 05000003/196401127 January 2012Indian Point
Farley
IR 05000348-11-005, 05000364-11-005, 05000348-11-014, and 05000364-11-1014, October 1, 2011 Through December 31, 2011, Joseph M. Farley Nuclear Plant, Units 1 and 2, Identification and Resolution of Problems
IR 05000171/200900711 September 2009Peach BottomIR 05000171-09-007; Exelon Generation Company LLC; 08/12/09, Peach Bottom Atomic Power Station, Unit 1, Delta, PA, Safestor Inspection
IR 05000171/20100071 September 2010Peach BottomIR 05000171-10-007, on 08/09 - 08/12/10, Peach Bottom Atomic Power Station, Unit 1, Delta, PA (Report)
IR 05000219/201401020 January 2015Oyster CreekIR 05000219/2014010, December 8, 2014 Through 11, 2014, Oyster Creek, NRC Supplemental Inspection Report
IR 05000250/20120115 October 2012Turkey PointIR 05000250-12-011, 05000251-12-011, on July 16 - August 2, 2012, Turkey Point Nuclear Plant, Units 3 and 4, Biennial Inspection of the Problem Identification and Resolution Program
IR 05000250/201300224 April 2013Turkey PointIR 05000250-13-002, 05000251-13-002, on 01/01/2013 - 03/31/2013, Turkey Point Nuclear Power Plant, Units 3 and 4, Component Design Basis Inspection, Occupational ALARA Planning and Controls, and Problem Identification and Resolution
IR 05000250/201400423 October 2014Turkey PointIR 05000250/2014004, 05000251/2014004; on 07/01/2014 - 09/30/2014; Turkey Point Nuclear Generating Station, Units 3 & 4; Problem Identification and Resolution
IR 05000250/201400530 January 2015Turkey PointIR 05000250/2014005, 05000251/2014005; on 10/01/2014 - 12/31/2014; Turkey Point Nuclear Generating Station, Units 3 & 4; Radiological Hazard Assessment and Exposure Controls; Followup of Events and Notices of Enforcement Discretion
IR 05000250/20140077 April 2014Turkey PointIR 05000250-14-007, 05000251-14-007; 01/27/2014 - 02/28/2014; Turkey Point Nuclear Generating Units 3 and 4; Component Design Bases Inspection
IR 05000250/201500717 March 2015Turkey PointIR 05000250/2015007 and 05000251/2015007, January 26, 2015, to February 6, 2015, Turkey Point, Units 3 & 4, NRC Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
IR 05000259/200701127 April 2007Browns FerryIR 05000259-07-011, on 04/09-13/2007, Browns Ferry Nuclear Plant Unit 1; License Renewal Inspection Program, Ti 2509/001
IR 05000259/201300214 May 2013Browns FerryIR 05000259-13-002, 05000260-13-002, 05000296-13-002; 01/01/2013 - 03/31/2013; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Operability Evaluations and Follow-up of Events
IR 05000271/201400712 May 2014Vermont YankeeIR 05000271-14-007; 3/17/2014 - 4/03/2014; Vermont Yankee Nuclear Power Station; Component Design Bases Inspection
IR 05000277/20080026 May 2008Peach BottomIR 05000277-08-002, 05000278-08-002 on 01/01/2008 - 03/31/2008 for Peach Bottom, Units 2 and 3, Fire Protection
IR 05000277/200800815 July 2008Peach BottomIR 05000277-08-008 and 05000278-08-008; on 06/02/2008 - 06/06/2008; Peach Bottom Atomic Power Station; Confirmatory Action Letter Status Report
IR 05000277/200840629 August 2008Peach BottomIR 05000277-08-406 and 05000278-08-406, on 07/21/2008 - 07/25/2008, Peach Bottom Atomic Power Station, Units 2 & 3, Supplemental Inspection 95001
IR 05000277/201000628 April 2010Peach BottomIR 05000277-10-006 and 05000278-10-006; 3/1/2010 - 3/19/2010; Peach Bottom Atomic Power Station, Units 2 and 3; Engineering Specialist Plant Modifications Inspection
IR 05000277/201100725 April 2011Peach BottomIR 05000277-11-007, 05000278-11-007; 02/14/2011 - 03/11/2011; Peach Bottom Atomic Power Station, Units 2 and 3; Component Design Bases Inspection
IR 05000277/201100913 May 2011Peach BottomIR 05000277/2011009 and 05000278/2011009; 04/15/2011 - 04/22/2011; Peach Bottom Atomic Power Station Plant; Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event
IR 05000293/200400814 January 2005PilgrimIR 05000293-04-008, on 11/15/2004 - 12/03/2004; Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station, Safety System Design and Performance Capability
IR 05000293/200930112 May 2009PilgrimEr 05000293/2009301; March 20 - April 14, 2009; Pilgrim Nuclear Power Station; Initial Operator Licensing Examination Report
IR 05000293/20100069 November 2010PilgrimIR 05000293-10-006, on 09/13/2010 - 09/30/2010, Pilgrim Nuclear Power Station, Engineering Specialist Plant Modifications Inspection
IR 05000293/201200814 December 2012PilgrimIR 05000293/2012008; 10/22/2012 - 11/8/2012; Entergy Nuclear Operations; Pilgrim Nuclear Power Station; Triennial Fire Protection Team Inspection
IR 05000346/20030114 February 2004Davis BesseIR 05000346-03-011(DRP), on 12/08-19/2003, Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station. Restart Readiness Assessment Team Inspection. Non-Cited Violations Noted
IR 05000346/200400425 March 2004Davis BesseIR 05000346-04-004 (Drp); on 02/02/2004 - 02/12/2004 for First Energy Nuclear Operating Company; Davis-Besse Nuclear Power Station. Restart Readiness Assessment Team Followup Inspection
IR 05000346/200500414 June 2005Davis BesseIR 05000346-05-004 (DRS) on 04/18/2005 - 05/06/2005 on Davis-Besse Nuclear Power Station; Safety System Design and Performance Capability
IR 05000346/2007006Davis Besse
IR 05000346/200750214 June 2007Davis BesseIR 05000346-07-502(DRS); on 05/14/2007 - 05/18/2007; Davis-Besse Nuclear Power Station; Routine Biennial Emergency Preparedness Exercise Baseline Inspection
IR 05000348/200701019 December 2007FarleyIR 05000348-07-010 and 05000364-07-010; 9/10-14/07; Joseph M. Farley Nuclear Plant, Units 1 and 2; Augmented Inspection
IR 05000348/200800613 May 2008FarleyIR 05000348-08-006, 05000364-08-006, on 03/10 - 14/2008 and 03/31 - 4/4/2008, Joseph M. Farley Nuclear Plant, Units 1 & 2, Triennial Fire Protection Inspection
IR 05000348/201400331 July 2014FarleyIR 05000348-14-003; and 05000364-14-003; on April 1, 2014, Through June 30, 2014; Joseph M. Farley Nuclear Plant, Units 1 and 2, Integrated Report
IR 05000348/20140059 February 2015FarleyIR 05000348/2014005; and 05000364/2014005, on October 1, 2014 Through December 31, 2014; Joseph M. Farley Nuclear Plant, Units 1 and 2, Problem Identification and Resolution; Event Follow-up
IR 05000348/201400728 July 2014FarleyIR 05000348-14-007 and 05000364-14-007, May 5, 2014, Through June 6, 2014,Joseph M. Farley Nuclear Plant, Units 1 and 2, Component Design Bases Inspection
IR 05000352/20140085 November 2014LimerickNRC Problem Identification and Resolution Inspection 05000352/2014008 and 05000353/2014008 Public Document
IR 05000354/201300331 July 2013Hope CreekIR 05000354-13-003, 04/01/2013 - 06/30/2013, Hope Creek Generating Station, Follow-up of Events and Notices of Enforcement Discretion
IR 05000354/201300511 February 2014Hope CreekIR 05000354-13-005, October 1, 2013, Through December 31, 2013, Hope Creek, Unit 1, Integrated Inspection Report and Exercise of Enforcement Discretion
IR 05000354/20130071 April 2013Hope CreekIR 05000354-13-007; January 28 February 15, 2013; Hope Creek Generating Station; Biennial Baseline Inspection of Problem Identification and Resolution
IR 05000354/201400430 October 2014Hope CreekNRC Integrated Inspection Report 05000354/2014004 (July 1, 2014-September 30, 2014)
IR 05000354/2016004Hope Creek
IR 05000368/20180109 August 2018Arkansas NuclearPost-Approval Site Inspection for Licensee Renewal Inspection Report 05000368/2018010
IR 05000382/20120085 November 2012WaterfordIR 05000382-12-008, July 16, 2012 - September 24, 2012, Waterford 3 Biennial Baseline Inspection of the Identification and Resolution of Problems.
IR 05000387/200400327 July 2004SusquehannaIR 05000387-04-003, 05000388-04-003, on 04/01/2004 - 06/30/2004, Susquehanna Steam Electric Station, Units 1 and 2; Personnel Performance During Non-Routine Plant Evolutions
IR 05000387/200700214 May 2007SusquehannaIR 05000387-07-002 and 05000388-07-002, on 01/01/2007 - 03/31/2007; Susquehanna Steam Electric Station, Units 1 and 2; Inservice Inspection Activities and Maintenance Effectiveness
IR 05000387/20090053 February 2010SusquehannaIR 05000387-09-005, 05000388-09-005; PPL Susquehanna, LLC, on 10/01/2009-12/31/2009; Susquehanna Steam Electric Station, Units 1 and 2; Fire Protection, Licensed Operator Requalification Program, NRC Integrated Inspection Report
IR 05000387/201000212 May 2010SusquehannaIR 05000387-10-002, 05000388-10-002; 01/01/2010 - 03/31/2010; Susquehanna Steam Electric Station, Units 1 and 2; Integrated Inspection Report
IR 05000387/201000615 March 2010SusquehannaIR 05000387-10-006 - 05000388-10-006; on 01/11/2010 - 01/29/2010; Susquehanna Steam Electric Station, Units 1 and 2; Identification and Resolution of Problems, Four Findings Were Identified in the Areas of Problem Identification, Problem Ev
IR 05000387/201100720 July 2011SusquehannaIR 05000387-11-007, 05000388-11-007, on 06/06/2011 - 06/24/2011, Susquehanna Steam Electric Station, Units 1 and 2, Triennial Fire Protection Team Inspection
IR 05000390/2011604Watts Bar
IR 05000390/2011605Watts Bar
IR 05000390/2011606Watts Bar