Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20054K388 | 24 June 1982 | Safety Evaluation of Degraded Grid Voltage Protection for Class IE Sys.Util Design Acceptable | |
ML20054L471 | 18 June 1982 | Safety Evaluation Supporting Amend 74 to License DPR-39 | |
ML20056C050 | 9 June 1992 | Safety Evaluation Supporting Amends 138 & 127 to Licenses DPR-39 & DPR-48,respectively | |
ML20056H500 | 27 August 1993 | Safety Evaluation Re Fire Protection Open Items from Section 3.2.1 of 780310 Safety Evaluation | |
ML20057A209 | 31 August 1993 | Safety Evaluation Denying Addl Exemptions from Fire Protection Requirements of 10CFR50,app R.Conclusions Reached When Granting Exemptions in 830307 & 880607 SEs Still Valid | |
ML20057B171 | 24 March 1993 | Safety Evaluation Granting Relief Requests to Licenses DPR-39 & DPR-48 Re Second 10-yr Interval Inservice Testing Plan for Pumps & Valves | |
ML20057F835 | 13 October 1993 | Safety Evaluation Supporting Amends 148 & 136 to Licenses DPR-39 & DPR-48,respectively | |
ML20058D808 | 31 October 1990 | Safety Evaluation Supporting Amends 120 & 109 to Licenses DPR-39 & DPR-48,respectively | |
ML20058E666 | 22 October 1993 | Corrected SE Re Revised Fuel Handling Accident Inside Containment.Se Mistakenly Gives Decontamination Factor for Elemental Iodine Value of 100 Instead of 133 | |
ML20058G298 | 29 November 1993 | Safety Evaluation Supporting Amends 151 & 139 to Licenses DPR-39 & DPR-48 | |
ML20059A721 | 14 October 1993 | Safety Evaluation Supporting Amends 149 & 137 to Licenses DPR-39 & DPR-48,respectively | |
ML20059B196 | 22 October 1993 | Safety Evaluation Accepting Util 930913 Reanalysis of Fuel Handling Accident Inside Containment | |
ML20059C552 | 13 October 1993 | Corrected Safety Evaluation Supporting Amends 148 & 136 to Licenses DPR-39 & DPR-48,respectively | |
ML20059E287 | 30 December 1993 | Safety Evaluation Supporting Amends 57,57,45,45,93,77,152 & 140 to Licenses NPF-37,NPF-66,NPF-72,NPF-77,NPF-11,NPF-18, DPR-39 & DPR-48 Respectively | |
ML20059L680 | 9 November 1993 | Safety Evaluation Re Update to Plant Reg Guide 1.97 Parameter Summary Table | |
ML20059L751 | 10 November 1993 | Safety Evaluation Accepting Category 3 Qualification in Lieu of Category 2 for Pressure Monitoring Instrumentation | |
ML20059M785 | 15 November 1993 | Safety Evaluation Supporting Amends 150 & 138 to Licenses DPR-39 & DPR-48,respectively | |
ML20062G582 | 30 July 1982 | Safety Evaluation Supporting Amend 75 to License DPR-39 | |
ML20126H910 | 9 April 1981 | Safety Evaluation Re Adequacy of Electric Distribution Sys Voltages.Voltage Analyses Demonstrate That Class IE Equipment Terminal Voltages Remain within Acceptable Operating Limits for Postulated Worst Case Conditions | |
ML20126L820 | 6 June 1985 | Safety Evaluation Supporting Revs 1 & 3 to 10-yr Inservice Insp Program & Request for Relief from Hydrostatic Testing Requirements | Hydrostatic |
ML20126L883 | 17 July 1985 | Safety Evaluation Supporting Response to Generic Ltr 83-28 Re post-trip Review Program & Procedures | |
ML20128D343 | 13 May 1985 | Safety Evaluation Supporting Amends 88 & 78 to Licenses DPR-39 & DPR-48,respectively | Power change |
ML20128G028 | 20 June 1985 | Safety Evaluation Supporting Util Responses to Generic Ltr 83-28 Re Preventive Maint & Surveillance Testing for Reactor Trip Breakers in PWRs | |
ML20129B223 | 5 July 1985 | Safety Evaluation Supporting Util 831105 & 840601 Responses to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2,4.1 & 4.5.1 | |
ML20129F129 | 24 May 1985 | Safety Evaluation Supporting Amends 89 & 79 to Licenses DPR-39 & DPR-48,respectively | |
ML20129H290 | 29 October 1996 | Safety Evaluation Supporting Amends 173 & 160 to Licenses DPR-39 & DPR-48,respectively | Nondestructive Examination |
ML20132F511 | 20 December 1996 | Safety Evaluation Supporting Amends 177 & 164 to Licenses DPR-39 & DPR-48,respectively | Hydrostatic Pressure and Temperature Limits Report Exemption Request |
ML20133G496 | 30 July 1985 | Safety Evaluation Supporting Rev 4 to First 10-yr Inservice Insp Program & Granting Relief from Hydrostatic Testing Requirements of ASME Code | Hydrostatic |
ML20134F985 | 6 November 1996 | Safety Evaluation Supporting Amends 174 & 161 to Licenses DPR-39 & DPR-48,respectively | |
ML20134H678 | 12 November 1996 | Safety Evaluation Supporting Amends 175 & 162 to Licenses DPR-39 & DPR-48,respectively | |
ML20134P337 | 27 August 1985 | Safety Evaluation Supporting Amends 90 & 80 to Licenses DPR-39 & DPR-48,respectively | |
ML20134P794 | 25 November 1996 | Safety Evaluation Supporting Amends 176 & 163 to Licenses DPR-39 & DPR-48,respectively | Shutdown Margin |
ML20135D897 | 25 November 1996 | Corrected SE Supporting Amends 176 & 163 to Licenses DPR-39 & DPR-48,respectively | Shutdown Margin |
ML20137A602 | 31 December 1985 | Safety Evaluation Supporting Amends 91 & 81 to Licenses DPR-39 & DPR-48,respectively | Probabilistic Risk Assessment |
ML20137M725 | 16 January 1986 | Safety Evaluation Supporting Amends 92 & 82 to Licenses DPR-39 & DPR-48,respectively | |
ML20137V490 | 22 January 1986 | Safety Evaluation Supporting Amends 93 & 83 to Licenses DPR-39 & DPR-48,respectively | |
ML20138M192 | 3 October 1985 | Safety Evaluation Re Review of Util Response to Generic Ltr 83-28.Post-trip Review Data & Info Capabilities Re Item 1.2 May Be Inadequate for Diagnosing Causes of Unscheduled Reactor Shutdowns & for Evaluating safety-related Equipment | |
ML20141D325 | 24 March 1986 | Safety Evaluation Supporting Amends 96 & 86 to Licenses DPR-39 & DPR-48,respectively | Anticipated operational occurrence Process Control Program |
ML20141E027 | 27 March 1986 | Safety Evaluation Supporting Amends 97 & 87 to Licenses DPR-39 & DPR-48,respectivley | |
ML20141F235 | 11 February 1986 | Safety Evaluation Supporting Util 830627,840626 & 0814 Requests for Relief from Second 10-yr Inservice Testing Requirements Found Impractical to Perform by Science Applications Intl Corp | Boric Acid Hydrostatic VT-2 |
ML20141M932 | 19 February 1986 | Safety Evaluation Supporting Amends 94 & 84 to Licenses DPR-39 & DPR-48,respectively | |
ML20141P002 | 10 March 1986 | Safety Evaluation Supporting Amends 95 & 85 to Licenses DPR-39 & DPR-48,respectively | Power change |
ML20147B883 | 26 February 1988 | SER Re Matl Properties for Fracture Toughness Requirements for Protection Against PTS Events.Nrc Concludes That Many of 30 Measurements Added to List in WCAP-10962 Not Credible | |
ML20147C376 | 30 November 1978 | Safety Eval Rept in Support of Amend 40 to Oper Lic 39 & Amend 37 to Oper Lic 48 | Shutdown Margin |
ML20148P495 | 4 April 1988 | Safety Evaluation Supporting Amends 110 & 99 to Licenses DPR-39 & DPR-48,respectively | |
ML20149H554 | 5 February 1988 | Safety Evaluation Supporting Amend 108 to License DPR-39 | |
ML20150F060 | 28 March 1988 | Safety Evaluation Supporting Amends 109 & 98 to Licenses DPR-39 & DPR-48,respectively | |
ML20151M128 | 6 April 1988 | Safety Evaluation Supporting Amends 111 & 100 to Licenses DPR-39 & DPR-48,respectively | |
ML20154A778 | 15 April 1988 | Safety Evaluation Supporting Amends 112 & 110 to Licenses DPR-39 & DPR-48,respectively | |
ML20155G577 | 7 June 1988 | Safety Evaluation Recommending That Util 840727 Exemption Request from Sections III.G.2 & III.G.3 of 10CFR50,App R Be Granted.One Exemption Request Determined as Unnecessary | Safe Shutdown Fire Barrier Coatings Exemption Request |