Similar Documents at Zion |
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20217J4791999-10-18018 October 1999 SER Approving Exemption from Certain Requirements of 10CFR73 for Zion Nuclear Power Station,Units 1 & 2.NRC Concluded That Proposed Alternative Measures for Protection Against Radiological Sabotage Meets Requirements of 10CFR73.55 ML20211K0401999-08-31031 August 1999 SER Accepting Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans for Plants,Units 1 & 2 ML20236U6331998-07-24024 July 1998 Safety Evaluation Supporting Amends 179 & 166 to Licenses DPR-39 & DPR-48,respectively ML20236S3281998-07-20020 July 1998 Safety Evaluation Supporting Certified Fuel Handlers Training & Retraining Program ML20198P8721998-01-0909 January 1998 Safety Evaluation Accepting Request for Alternative Insp Requirements for Augmented Exam of Reactor Presure Vessels for Zion Nuclear Power Station,Units 1 & 2 ML20198P8361998-01-0909 January 1998 SER Accepting Determination of Zone of Influnce for Coatings in Containment of Plant,Units 1 & 2 ML20202F0761997-12-0202 December 1997 Safety Evaluation Denying Licensee Proposed Alternative Contained in Request for Relief CR-13,Rev 1,of Removing Only Insulation Classified as Removable.Staff Determined That Submittal Does Not Provide Acceptable Level of Quality ML20132F5111996-12-20020 December 1996 Safety Evaluation Supporting Amends 177 & 164 to Licenses DPR-39 & DPR-48,respectively ML20135D8971996-11-25025 November 1996 Corrected SE Supporting Amends 176 & 163 to Licenses DPR-39 & DPR-48,respectively ML20134P7941996-11-25025 November 1996 Safety Evaluation Supporting Amends 176 & 163 to Licenses DPR-39 & DPR-48,respectively ML20134H6781996-11-12012 November 1996 Safety Evaluation Supporting Amends 175 & 162 to Licenses DPR-39 & DPR-48,respectively ML20134F9851996-11-0606 November 1996 Safety Evaluation Supporting Amends 174 & 161 to Licenses DPR-39 & DPR-48,respectively ML20129H2901996-10-29029 October 1996 Safety Evaluation Supporting Amends 173 & 160 to Licenses DPR-39 & DPR-48,respectively ML20059E2871993-12-30030 December 1993 Safety Evaluation Supporting Amends 57,57,45,45,93,77,152 & 140 to Licenses NPF-37,NPF-66,NPF-72,NPF-77,NPF-11,NPF-18, DPR-39 & DPR-48 Respectively ML20058G2981993-11-29029 November 1993 Safety Evaluation Supporting Amends 151 & 139 to Licenses DPR-39 & DPR-48 ML20059M7851993-11-15015 November 1993 Safety Evaluation Supporting Amends 150 & 138 to Licenses DPR-39 & DPR-48,respectively ML20059L7511993-11-10010 November 1993 Safety Evaluation Accepting Category 3 Qualification in Lieu of Category 2 for Pressure Monitoring Instrumentation ML20059L6801993-11-0909 November 1993 Safety Evaluation Re Update to Plant Reg Guide 1.97 Parameter Summary Table ML20059B1961993-10-22022 October 1993 Safety Evaluation Accepting Util 930913 Reanalysis of Fuel Handling Accident Inside Containment ML20058E6661993-10-22022 October 1993 Corrected SE Re Revised Fuel Handling Accident Inside Containment.Se Mistakenly Gives Decontamination Factor for Elemental Iodine Value of 100 Instead of 133 ML20059A7211993-10-14014 October 1993 Safety Evaluation Supporting Amends 149 & 137 to Licenses DPR-39 & DPR-48,respectively ML20059C5521993-10-13013 October 1993 Corrected Safety Evaluation Supporting Amends 148 & 136 to Licenses DPR-39 & DPR-48,respectively ML20057F8351993-10-13013 October 1993 Safety Evaluation Supporting Amends 148 & 136 to Licenses DPR-39 & DPR-48,respectively ML20057A2091993-08-31031 August 1993 Safety Evaluation Denying Addl Exemptions from Fire Protection Requirements of 10CFR50,app R.Conclusions Reached When Granting Exemptions in 830307 & 880607 SEs Still Valid ML20056H5001993-08-27027 August 1993 Safety Evaluation Re Fire Protection Open Items from Section 3.2.1 of 780310 Safety Evaluation ML20057B1711993-03-24024 March 1993 Safety Evaluation Granting Relief Requests to Licenses DPR-39 & DPR-48 Re Second 10-yr Interval Inservice Testing Plan for Pumps & Valves ML20056C0501992-06-0909 June 1992 Safety Evaluation Supporting Amends 138 & 127 to Licenses DPR-39 & DPR-48,respectively ML20058D8081990-10-31031 October 1990 Safety Evaluation Supporting Amends 120 & 109 to Licenses DPR-39 & DPR-48,respectively ML20247E7421989-09-0808 September 1989 Safety Evaluation Supporting Amends 118 & 107 to Licenses DPR-39 & DPR-48,respectively ML20245F1631989-08-0101 August 1989 Safety Evaluation Supporting Amends 117 & 106 to Licenses DPR-39 & DPR-48,respectively ML20247P9591989-05-30030 May 1989 Safety Evaluation Supporting Amends 116 & 105 to Licenses DPR-39 & DPR-48,respectively ML20247M7431989-05-22022 May 1989 Safety Evaluation Supporting Util Compliance W/Atws Rule 10CFR50.62 ML20245H8051989-04-27027 April 1989 Safety Evaluation Supporting Amends 115 & 104 to Licenses DPR-39 & DPR-48,respectively ML20244E4141989-04-14014 April 1989 Safety Evaluation Supporting Util post-accident Monitoring Instrumentation Per Reg Guide 1.97 & Generic Ltr 82-33 ML20196B8081988-12-0202 December 1988 Safety Evaluation Supporting Util Responses to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing Requirements ML20207K9971988-10-11011 October 1988 SER Supporting Amends 113 & 102 to Licenses DPR-39 & DPR-48, Respectively ML20155G5771988-06-0707 June 1988 Safety Evaluation Recommending That Util 840727 Exemption Request from Sections III.G.2 & III.G.3 of 10CFR50,App R Be Granted.One Exemption Request Determined as Unnecessary ML20154A7781988-04-15015 April 1988 Safety Evaluation Supporting Amends 112 & 110 to Licenses DPR-39 & DPR-48,respectively ML20151M1281988-04-0606 April 1988 Safety Evaluation Supporting Amends 111 & 100 to Licenses DPR-39 & DPR-48,respectively ML20148P4951988-04-0404 April 1988 Safety Evaluation Supporting Amends 110 & 99 to Licenses DPR-39 & DPR-48,respectively ML20150F0601988-03-28028 March 1988 Safety Evaluation Supporting Amends 109 & 98 to Licenses DPR-39 & DPR-48,respectively ML20147B8831988-02-26026 February 1988 SER Re Matl Properties for Fracture Toughness Requirements for Protection Against PTS Events.Nrc Concludes That Many of 30 Measurements Added to List in WCAP-10962 Not Credible ML20149H5541988-02-0505 February 1988 Safety Evaluation Supporting Amend 108 to License DPR-39 ML20237H5511987-08-17017 August 1987 Safety Evaluation Supporting Amends 107 & 97 to Licenses DPR-39 & DPR-48,respectively ML20236J3961987-07-20020 July 1987 Safety Evaluation Supporting Amends 106 & 96 to Licenses DPR-39 & DPR-48,respectively ML20235E9171987-06-23023 June 1987 Safety Evaluation Supporting Amends 105 & 95 to Licenses DPR-39 & DPR-48,respectively ML20213G6351987-05-0808 May 1987 Safety Evaluation Supporting Amends 104 & 94 to Licenses DPR-39 & DPR-48,respectively ML20215K3831987-05-0707 May 1987 Safety Evaluation Re Util 861229 Submittal Concerning Matl Properties for Fracture Toughness Requirements for Protection Against PTS Events,Per 10CFR50.61.Reported Values of Copper & Nickel Content Unacceptable ML20205Q9561987-03-26026 March 1987 Safety Evaluation Supporting Amends 103 & 93 to Licenses DPR-39 & DPR-48,respectively ML20205G7221987-03-19019 March 1987 Safety Evaluation Supporting Amends 102 & 92 to Licenses DPR-39 & DPR-48 1999-08-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217J4791999-10-18018 October 1999 SER Approving Exemption from Certain Requirements of 10CFR73 for Zion Nuclear Power Station,Units 1 & 2.NRC Concluded That Proposed Alternative Measures for Protection Against Radiological Sabotage Meets Requirements of 10CFR73.55 A99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20211K0401999-08-31031 August 1999 SER Accepting Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans for Plants,Units 1 & 2 A99022, Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99021, Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations A99016, Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195H9521999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2 A99013, Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results A990101, Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with A99002, Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98062, Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With ML20196J0061998-11-19019 November 1998 Rev 66 to Topical Rept CE-1-A, QA Program ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB A98057, Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98052, Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98049, Special Rept 304-123-98-001SR:on 980902,valid Failure Rept for 2A EDG Occurred.Cause Unknown.Util Submitted Written Certification of Permanent Cessation of Operations at Zion Station,Units 1 & 21998-09-25025 September 1998 Special Rept 304-123-98-001SR:on 980902,valid Failure Rept for 2A EDG Occurred.Cause Unknown.Util Submitted Written Certification of Permanent Cessation of Operations at Zion Station,Units 1 & 2 ML20195D1221998-08-31031 August 1998 DSAR, for Zion Station A98048, Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept A98042, Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 2 ML20236U6331998-07-24024 July 1998 Safety Evaluation Supporting Amends 179 & 166 to Licenses DPR-39 & DPR-48,respectively ML20236S3281998-07-20020 July 1998 Safety Evaluation Supporting Certified Fuel Handlers Training & Retraining Program A98041, Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 2 ML20236J7911998-06-12012 June 1998 LER 98-S02-00:on 980517,first Shift Security Officer Reported Being Wounded by Unknown Subject Who Fled Area. Caused by accidental,self-inflicted Gunshot Wound.Removed Officer from Duty & Charged Officer W/Filing False Rept A98039, Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 2 A98035, Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 2 A98033, Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 2 A98029, Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 2 A98015, Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 2 ML20199K1651998-01-23023 January 1998 Rev 65h to Topical Rept CE-1-A, Comm Ed QA Tr ML20198P8361998-01-0909 January 1998 SER Accepting Determination of Zone of Influnce for Coatings in Containment of Plant,Units 1 & 2 ML20198P8721998-01-0909 January 1998 Safety Evaluation Accepting Request for Alternative Insp Requirements for Augmented Exam of Reactor Presure Vessels for Zion Nuclear Power Station,Units 1 & 2 A98034, 1997 Annual 10CFR50.59 Summary Rept1997-12-31031 December 1997 1997 Annual 10CFR50.59 Summary Rept ML20216D3611997-12-31031 December 1997 Unicom Corp 1997 Summary Annual Rept A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 ML20202F1451997-12-0303 December 1997 Independent Investigation Team Rept on Safety Conscious Work Environment at Zion Station ML20202F0761997-12-0202 December 1997 Safety Evaluation Denying Licensee Proposed Alternative Contained in Request for Relief CR-13,Rev 1,of Removing Only Insulation Classified as Removable.Staff Determined That Submittal Does Not Provide Acceptable Level of Quality A97076, Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2 ML20199J5931997-11-26026 November 1997 SG Insp Results,Fall 1996 Refueling Outage 14 (Z2R14) A97063, Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event1997-11-13013 November 1997 Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event A97069, Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 2 ML20211M0181997-10-0707 October 1997 Special Rept 295-123-97-001SR:on 970904,OA Motor Declared Inoperable Due to Pin Hole Leaks Identified on Pressure Regulating Relief valve,0FP0052.Procedure Was Rewritten to Ensure 0FP0052 Would Maintain Same Pressure When Fully Open A97058, Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 2 ML20210V2401997-09-19019 September 1997 Rev 65g to Topical Rept CE-1-A, Comm Ed QA Manual 1999-09-30
[Table view] |
Text
. -
l l
pMEh l p q UNITED STATES l
( j j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066-0001
\.....l2 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 176 TO FACILITY OPERATING LICENSE NO. DPR-39 M D AMENDMENT NO. 163 TO FACILITY OPERATING LICENSE NO. DPR-48 COPMONWEALTH EDISON COMPANY ZION NUCLEAR POWER STATION. UNITS 1 AND 2 DOCKET NOS. 50-295 AND 50-304
1.0 INTRODUCTION
In its letter dated October 4,1996, as supplemented on November 6,1996, Commonwealth Edison Company (Comed or the licensee) proposed a change to the Technical Specifications (TS) of Zion Nuclear Power Station, Units 1 and 2, that would require the Rod Position Indicator Channels to be operable curing MODES I and 2. This change is necessary to correct an ambiguous applicability associated with Limiting Condition for Operation (LCO) 3.2.3.D.1, Inoperable Rod Position Indication Channels. The change will allow operations required to consider the rod position indicator channels operable, such as calibration.
The licensee's supplemental submittal of November 6,1996, clarified and provided additional information in support of the initial application for amendment. It did not affect the Commission's proposed finding of no significant hazards consideration determination.
2.0 EVALUATION The current TS do act explicitly state a Mode of Applicability for Specification 3.2.3.D or any of its subsections. Specification 3.2.3.D.1 l states that not more than one rod position indicator cf w.el per control rod group nor two rod position indicator channels per control rod bank shall be permitted to be inoperable at any time, except during hot rod drop timing measurements. Specification 3.2.3.D.2 states that if the conditions of Section 3.2.3.D.1 can net be met, the reactor shall be brought to at least a Hot Shutdown condition within four ho cs and the reactor trip breakers shall remain open. In addition, with a single Rod Position Indicator Channel out of service, continued operation is permitted, and with power greater than 50 percent, control rod positions are required to be checked indirectly at least once per shift by excore detectors, thermocouple or moveable incore detectors. During operation with power less than 50 percent, no special monitoring is required. Modes of applicability of MODES I and 2 for Specification 3.2.3.D.2 can be implied by observing that it rw: ires the unit to be placed in at least hot shutdown with the reactor trip bre ners open, l 9612100237 961125 PDR ADOCK 05000295 l P PDR _.
J
\
I
- within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> if the conditions of Specification 3.2.3.D.1 can not be met.
i Since placing the reactor in at least hot shutdown implies its initial condition was MODE 1 or 2, these modes of applicability are implied. However, j
these modes of applicability are not explicitly stated in the specifications and this change will correct this deficiency.
The purpose of the TS requirements for control rod position indication is to ensure that the control rod positions are known accurately enough to verify
, that the core is operating within the parameters used for accident and operating analyses. If plant operation takes place with control rods outside
- their assumed positions, certain accident analysis limits may be violated. In
- addition, control rod position must be known to verify adherence to the rod alignment limits while operating.
However, for various reasons, such as modifications or maintenance, testing may be necessary to ensure that a rod position indicator channel is operable. !
This testing requires the closing of the reactor trip breakers and withdrawal '
of control rods to verify that rod position indication is consistent with the actual rod position. .Since as currently written, Specification 3.2.3.D.2 states that if the rod position indicator channel operability requirements of Specification 3.2.3.D.1 can not be met, the reactor trip breakers shall remain open, there is currently no way to test an inoperable rod position indicator channel to verify its operability or calibrate it to make it operable. To allow the performance of rod position indicator channel calibration, which requires the reactor trip breakers to be closed, specific modes of applicability for Specification 3.2.3.D.1 have been proposed. In the past, Zion Station personnel used the specification Bases to justify shutting the reactor trip breakers while in a mode other than MODE 1 or MODE 2 to calibrate the rod position indication channels. The justification for this use was that the Bases discuss the importance of individual rod position relative to group position in terms of normal power operation. Nowhere in the Bases is a statement made that individual rod position relative to group position is important when the reactor is subcritical. Therefore, as long as the reactor was not in MODE 1 or MODE 2, Zion considered it was permissible to shut the reactor trip breakers to perform rod position indication channel alignments.
With the proposed change, Specification 3.2.3.D.1 will continue to require that not more than one rod position indicator channel per control rod group nor two rod position indicator channels per control rod bank shall be permitted to be inoperable at any time, except during hot rod drop timing measurements. Specification 3.2.3.D.2 will be modified by changing it into a Required Action statement, with a Mode of Applicability added for the modes in which the Rod Position Indication Channels must be operable, namely, MODES I and 2. The Required Action will be that, if the conditions of Specification 3.2.3.D.1 can not be met, the reactor shall be brought to at least the hot shutdown condition within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Deletion of the requirement that the reactor trip breakers shall remain open will allow the licensee to close them if the plant is in a mode other than Mode 1 or Mode 2. Rod position indication channels are not required in a mode other than Mode 1 or Mode 2 to ensure the reactor is shutdown since shutdown margin limits can be ensured by
1 4
1 chemical shim if indication is not available. This change will allow calibration of the Rod Position Indicator Channels in any mode other than MODES I and 2. The calibration requires the reactor trip breakers to be shut and the control rods to be individually cycled their full length. As long as this testing is done while the reactor is shut down, the concerns of operating outside the parameters used for accident and operating analyses, with the possibility of violating certain accident analysis limits, are not raised.
I j The Rod Position Indicator Channels are only required to be operable in i MODES 1 and 2 because these are the only modes in which power peaking factors are a concern. In this case, operability of the Rod Position Indicator l Channels has a potential to affect the safety of the plant. Control rod alignment limits ensure that power distribution and reactivity limits defined 4
by the design power peaking and shutdown margin limits are preserved. As such, it is appropriate to require control rod position indication for
- verification of control rod alignment limitations in MODES I and 2.
1 Control bank and shutdown bank control rod position accuracy is required during power operation. Rod Position Indicator Channels are not required in shutdown modes since shutdown margin limits can be ensured by chemical shim if indication is not available.
NUREG-1431, Revision 1, " Improved Standard Technical Specifications," also has a mode of applicability of MODEL 4 and 2 for the Rod Position Inoication System. The proposed change, adding a Mode of Applicability for the Rod Position Indication System, is consistent with the manner in which this issue is addressed by the Improved Technical Specifications and is consistent with the Zion submittals to adopt the Improved Technical Specifications.
During its review, ths staff noticed that there is a discrepancy between the TS pages submitted by ti e licensee. The version that shows the requested changes by manual markur does not delete the requirement that the reactor trip breakers remain open. Ilowever, the page with the requested changes shown
" shaded" does delete this requirement. The licensee's submittal clearly indicates that its desire is that this requirement be deleted and conversations with the licensee confirmed this. In addition, if the requirement were not deleted, the purpose of the amendment would not be served. Therefore, the amendment the staff is issuing deletes the requirement that the reactor trip breakers remain open.
The staff has reviewed and evaluated the information and data presented by the licensee in its application for amendment. The proposed addition of modes of applicability to the requirement for the rod position indicator channels to be operable would allow the licensee to shut reactor trip breakers in modes other than MODES I and 2 even if the rod position indicator channel (s) is(are) inoperable. The staff has determined that this is a reasonable change that will permit the licensee to cycle individual co. trol rods to calibrate or ensure the operability of rod position indicator channels. During the period that the rod position indication channel (s) is(are) inoperable, shutdown
l I
margin limits can be ensured by chemical shim. Therefore, the proposed TS change is acceptable.
3.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Illinois State official was notified of the proposed issuance of the amendments. The State official had no comments.
4.0 ENVIR0fMEN1 AL CONSIDERATION The amendments change a requirement with respect to the installation or use of a facility component located within the restricted are as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no i significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no j significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the i l
amendments involve no significant hazards consideration, and there isas been no '
public comment on such finding (61 FR 54240). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR ;
51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement I or environmental assessment need be prepared in connection with the issuance of the amendments.
5.0 CONCLUSION
The Commission has cow;.luded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will oe conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and set.urity or to the health and safety of the public.
Principal Contributor: C. Shiraki
- Date: November 25, 1996
)
i
.