Issue date | Title | Topic | |
---|---|---|---|
ML19208A716 | 12 September 1979 | LER 79-025/01T-0:on 790830,during Pipe Walkdown Insp,One Pipe Hanger in Auxiliary Feedwater Sys Was Found Inoperable. Caused by Incomplete Installment During Const.Unit Repaired Immediately & Was Returned to Full Power | |
ML19209B234 | 3 October 1979 | LER 79-026/01T-0:on 790919,during Power Reduction Below 90% Power,Axial Flux Difference Left Target Band While Power Was Still Above 90% Power.Caused by Operator Error.Power Reduced to Below 90% & Event Discussed W/Personnel | |
ML19210C702 | 15 November 1979 | LER 79-028/03L-0:on 791019,during Cold Shutdown,Insp of Pipe Supports for Cooling Water Mods in Containment Revealed Some Supports Not Built to Tech Specs.Caused by Installation Error.Deficient Supports Repaired | |
ML19246B431 | 9 July 1979 | LER 79-020/03L-0 on 790609:failure of Pressurizer power-operated Relief Isolation to Close on Demand.Caused by Torque Switch Failure in Limitorque SMB-00 Operator.Switch Replaced | |
ML19248C894 | 29 June 1979 | LER 79-018/03L-0 on 790531:SP-1187 Diesel Fire Pump Weekly Battery Insp Not Performed in Fifth Week of Jan 1979. Procedures Changed to Require Fifth Signature Block on Data Sheets for Months W/Five Weekly Insps | |
ML19250A499 | 16 October 1979 | LER 79-027/01T-0:on 791002,tube Break Occurred in Steam Generator 11.Caused by Mechanical Wear.Two Defective Tubes Plugged | |
ML19256G137 | 21 December 1979 | LER 79-030/03L-0:on 791121,during Insps Per IE Bulletins 79-14 & 79-02,two Snubbers in Cooling Water Sys Found Incorrectly Installed & One Hanger in Auxiliary Feedwater Sys Found Damaged.Repairs Were Made Immediately | |
ML19257A006 | 26 December 1979 | LER 79-031/03L-0:on 791126,during Periodic Surveillance Program Review,Discovered That SP1022 Boric Acid Tank Level Test Not Performed within Tolerance Band.Caused by Personnel Oversight.Instrumentation & Control Schedule to Be Used | Boric Acid |
ML19257B981 | 18 January 1980 | LER 79-032/03L-0:on 791221,during Surveillance Test, Diesel Generator 2 Tripped on High Crankcase Pressure. Apparently Caused by Cooling Water Leaking Into Lube Oil Sys & Accumulating During Shutdown Periods | |
ML19257C013 | 18 January 1980 | LER 80-001/01T-0:on 800106,Unit 1 Caustic Addition Valves CA-1-2 & CA-1-4 Mistakenly Closed & Secure Cards Attached. Caused by Personnel Error & Procedural Inadequacies. Administrative Procedures Modified | |
ML19257C264 | 23 January 1980 | LER 80-003/01T-0:on 800109,while Conducting Eddy Current Examination of Steam Generator,Row 1 Column Hot Leg Tube Found Defective.Caused by Wearing of Tube Lane Blocking Device Against Tube.Device Modified to Prevent Movement | |
ML19257D490 | 30 January 1980 | Updated LER 79-030/03X-1:on 791121,during Insp Per IE Bulletins 79-14 & 79-02,two Snubbers in Cooling Water Sys Found Incorrectly Installed & One Hanger in Auxiliary Feedwater Sys Found Damaged.Cause Not Stated | |
ML19259C118 | 7 June 1979 | LER 79-016/03L-0 on 790509:during Audit of Surveillance Program,Found That Reactor Vessel Injection Isolation Valve Test Sp 2159 Had Not Been Done.Caused by Failure to Enter Test on Computer Surveillance Schedule | |
ML19260A756 | 30 November 1979 | LER 79-029/03L-0:on 791102,during Surveillance Test,Turbine Driven Auxiliary Feedwater Pump Did Not Start.Cause Unknown. Valves Being Checked for Proper Position Every 4-h & Design Change Initiated | |
ML19260D615 | 6 February 1980 | LER 80-002/03L-0:on 800107,during Surveillance Test of Diesel Generator D-1,relay Misoperation Occurred Which Would Have Prevented Automatic Synchronization of Generator Onto Bus 15.Caused by Stuck Relay Plunger.Plunger Freed | |
ML19260D705 | 6 February 1980 | LER 80-006/01T-0:on 800123,during Testing of Diesel Generator D-21,ability to Reduce Generator Load from Control Room Was Lost.Caused by Loose Front End Shield on Governor Synchronizing Motor.Motor Replaced | |
ML19261B605 | 23 February 1979 | LER 79-002/03L-0 on 790126:diesel Cooling Water Pump 22 Failed to Start During Surveillance Test.Caused by Stuck Contacts in Licon Micro-Switch 11-104 | |
ML19261E224 | 29 June 1979 | LER 79-021/03L-0 on 790611:steam Generator Level Channel 1LT471 Responded Slowly to Level Changes.Cause Unstated. Transmitter Diaphragm Assembly Replaced | |
ML19263D001 | 16 March 1979 | LER 79-003/03L-0 on 790216:overtemperature Summing Unit 2TM-401B Drifted & Allowed High Trip Pressure.Device Recalibrated.Device Performance Being Evaluated Frequently | |
ML19268B766 | 1 June 1979 | LER 79-015/03L-0 on 790504:during Power Operation,Nuclear Power Range Channel 2N43 Failed Low,Due to Loss of High Voltage.Caused by Failure of High Voltage Regulated Source Model UPMD-X54W.Power Supply Replaced | |
ML19269E288 | 22 June 1979 | LER 79-017/03L-0 on 790525:both Source Range Channels Lost for Three Menutes When All Power Range Channel Control Power Fuses Were Pulled.Caused by Procedure Error.Fuses Reinstalled & Procedure Changed | |
ML19274E693 | 12 April 1979 | LER 79-007/01T-0 on 790328:non-conservatism Noted in rod-drop Analysis.Corrective Actions Undetermined;Followup LER Will Be Issued | Rod Drop Event |
ML19276G881 | 24 August 1979 | LER 79-023/03L-0 on 790726:design Deficiency Was Found in Motor Driven Auxiliary Feedwater Pump Low Lube Oil Pressure Circuitry in Each Unit.Redundant Turbine Driven Pumps Are Unaffected.Design Change Has Been Initiated | |
ML19276G906 | 24 August 1979 | LER 79-024/03L-0 on 790731:safety Injection Pump Test Sp 1088 Was Not Completed During Hot Shutdown as Required. Caused by Personnel Error | |
ML19289D637 | 7 March 1979 | LER 78-021/01X-1 on 781128:during Refueling,Local Leak Rate Test Revealed Leakage Through Outer Valves in Penetration 25A & 25B,containment Purge in Excess of Tech Spec Max. Caused by Inadequate Seal at Valve Seats.Adjustment Made | |
ML19289F142 | 1 June 1979 | LER 79-001 Has Been Voided | |
ML19289F154 | 1 June 1979 | LER 79-002 Has Been Voided | |
ML19294B007 | 20 February 1980 | LER 80-005/03L-0:on 800121,during Surveillance Test of D1 Diesel Generator,Lockout Occurred While Engine Was Being Prelubed.Caused by Abnormally Cold Generator Room.Caution Will Be Added to Procedure to Monitor Lube Oil Pressure | |
ML19296A191 | 9 February 1979 | LER 79-001/03L-0 on 790112:during Surveillance Test Found That Instrument 2TM-404V,overpower delta-T Summing Circuit, Had Drifted Due to Drift in Foxbore Model 66RC-OL Summing Unit | |
ML19296B363 | 15 February 1980 | LER 80-004/03L-0:on 800118,discovered That Loop a Steam Flow Transmitter Had Drifted Out of Spec.Caused by Failure of Differential Pressure Unit in Barton Flow Transmitter Model 384.Pressure Unit Replaced,Transmitter Recalibr | |
ML19296B778 | 19 February 1980 | Updated LER 79-027/01T-0:on 791002,tube Break Occurred in Steam Generator.Caused by Mechanical Wear.Defective Tubes Plugged.Will Be Inspected During Next Refueling Outage for Anomalous Behavior of Plugged Tubes | |
ML19296D354 | 26 February 1980 | Updated LER 79-030/03X-2:on 791121,during Walkdown Insp Per IE Bulletins 79-14 & 79-02,two Snubbers Found Incorrectly Installed & One Hanger Found Damaged.Cause Not Stated. Repairs Have Been Made & All Devices Are Operable | |
ML19305D343 | 9 April 1980 | LER 80-009/03L-0:on 800310,during Normal Operation,Nuclear Power Range Channel 1N44 Was Inoperable for Several Minutes. Caused by latch-up of High Voltage Power Supply Due to Spike on Yellow Instrument Bus.Fuses Were Removed & Reset | |
ML19305D840 | 10 April 1980 | LER 80-010/03L-0:on 800311,during Surveillance Test, Containment Isolation Valve 11 Opened at 0.57 Psi.Caused by Apparent Drift in Barton Model 288A Differential Pressure Switch.Setpoint Adjusted & Valve Retested Satisfactorily | |
ML19305E320 | 17 April 1980 | Updated LER 80-010/03L-1: Cause Code & Component Manufacturer Corrected | |
ML19308B804 | 14 January 1980 | LER 79-033/03L-0:on 791228,during Surveillance Test,Inlet Steam Supply Motor Valve to turbine-driven Auxiliary Feedwater Pump Tripped on Overload.Caused by Loosened Bell Screws Which Fell Into Motor,Causing Binding | |
ML19309C347 | 3 April 1980 | Updated LER 79-030/03X-3:on 791121,during Insp Per IE Bulletins 79-14 & 79-02,two Snubbers in Cooling Water Sys Found Installed Incorrectly & Five Hangers Found Damaged or in Violation of Safety Requirements.Insp Ongoing | |
ML19309E100 | 11 April 1980 | LER 80-011/03L-0:on 800312,motor Breaker of Charging Pump 22 Would Not Stay Closed.Pump Stopped.Caused by Failed Tfk Breaker.Breaker Replaced | |
ML19309G405 | 30 April 1980 | LER 80-012/03L-0:on 800331,during Review of Electrical Surveillance Program,Discovered That Individual Float Cell Voltage Measurements Were Not Done in Mar 1980 on Battery Monthly Test.Caused by Personnel Oversight | |
ML19309H597 | 9 May 1980 | LER 80-014/03L-0:on 800410,during Surveillance Test,One Overpower Delta T Setpoint Was Found to Trip About 70% Above Desired Setpoint.Caused by Intermittent Capacitor.Capacitor Was Replaced | |
ML19309H611 | 9 May 1980 | LER 80-013/03L-0:on 800411,while Performing Maint,Workman Accidentally Tripped Overspeed Valve for turbine-driven Auxiliary Feedwater Pump 22.Valve Immediately Reset | |
ML19312D436 | 19 March 1980 | LER 80-007/03L-0:on 800218,during Surveillance Test,Load on Diesel Generator D1 Could Not Be Increased Above 1,400 Kw. Caused by Trainee Operator Error.Setpoint Returned to Normal & Test Completed Satisfactorily | |
ML19312D449 | 20 March 1980 | LER 80-008/03L-0:on 800219,during Startup After Refueling, One Steam Flow Meter on Each Steam Line Did Not Come on Scale.Both Transmitters Drifted Low.Caused by Zero Adjustment Shift in Barton Model 384 Transmitters | |
ML19318C065 | 27 June 1980 | Updated LER 80-009/03L-1:on 800310,during Normal Operation, Nuclear Power Range Channel 1N44 Was Inoperable for Few Minutes.High Voltage Supply for Detector Latched Up Due to Spike on Yellow Instrument Bus | |
ML19318C494 | 27 June 1980 | LER 80-016/03L-0:on 800529,during Instrument Calibr, Instrument Was Dropped on Trip Throttle Valve Linkage, Tripping Valve & Making Pump Inoperable for 3 Minutes. Caused by Personnel Error | |
ML19320D449 | 14 July 1980 | LER 80-017/03L-0:on 800615,during Normal Operation,Found One Charging Pump Out of Svc.Charge Pump 23 Started & Shut Down.Caused by Air Leaks on Speed Control Unit Due to Broken Packing Ring.Packing Ring Replaced | |
ML19320D506 | 15 July 1980 | LER 80-018/01T-0:on 800701,unit Was Shut Down Due to Leaking Tube in Hot Leg of Vertical Steam Generator 12,Westinghouse Series 51.Cause Not Stated.Defective Tube Will Be Plugged | |
ML19323C630 | 13 May 1980 | LER 80-015/01T-0:on 800429,containment Maint Airlock Showed Leakage Greater than Tech Spec Limit.Caused by Degradation of Airlock Door Seal.Inner Door Seals Replaced & Leak Tested Satisfactorily | |
ML19323G172 | 23 May 1980 | Supplementary LER 80-003/01X-2:on 800109,during Eddy Current Testing of Tubes in Unit 2 Steam Generators,Several Indications of Tube Degradation Were Observed.Cause Unstated.Several Tubes Plugged & One Removed for Exam | |
ML19325C198 | 5 October 1989 | LER 89-014-00:on 890905,operations Personnel Recalled That SP1093.1 Performed Two Wks Previously Instead of SP1093.2. Caused by Personnel Error in Selecting Incorrect Procedure. Proper Notifications Made & SP1093.2 performed.W/891005 Ltr | Missed surveillance |