Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13172A262 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 01 - the Facility | Tornado Missile Design basis earthquake |
ML13172A263 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 02 - Site Characteristics | Safe Shutdown High winds Operating Basis Earthquake Frazil ice Earthquake Fatality |
ML13172A264 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 03 - Design of Structures, Systems, and Components | Safe Shutdown Ultimate heat sink Mission time Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Hydrostatic Cyber Security Emergency Lighting Tornado Generated Missile Abnormal operational transient Design basis earthquake Earthquake Commercial Grade Pressure Boundary Leakage Power change |
ML13172A265 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 04 - Irradiation Unit and Radioisotope Production Facility Description | Shutdown Margin Mission time Anticipated operational occurrence Design basis earthquake Commercial Grade |
ML13172A267 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 05 - Cooling Systems | Fuel cladding |
ML13172A268 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 06 - Engineered Safety Features | |
ML13172A269 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 07 - Instrument and Control Systems | Safe Shutdown Commercial Grade Dedication Safe Shutdown Earthquake Post Accident Monitoring Operating Basis Earthquake Cyber Security Earthquake Commercial Grade Cyber attack |
ML13172A270 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 08 - Electrical Power Systems | Safe Shutdown Emergency Lighting |
ML13172A271 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 09 - Auxiliary Systems | Safe Shutdown Mission time Fire Barrier Hydrostatic Emergency Lighting Commercial Grade Fire Protection Program Depleted uranium |
ML13172A273 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 10 - Experimental Facilities | |
ML13172A274 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 11 - Radiation Protection Program and Waste Management | High Radiation Area Anticipated operational occurrence Annual Radiological Environmental Operating Report Unidentified leakage |
ML13172A275 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 12 - Conduct of Operations | Coatings Temporary Modification Condition Adverse to Quality Commercial Grade |
ML13172A276 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 13 - Accident Analysis | Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Internal Flooding Operator Manual Action Design basis earthquake Earthquake Commercial Grade Fire Protection Program Fire Watch Overexposure |
ML13172A277 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 14 - Technical Specifications | High winds Tornado Missile |
ML13172A278 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 15 - Financial Qualifications | |
ML13172A279 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 16 - Other License Considerations | |
ML13172A280 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 17 - Decommissioning and Possession-Only License Amendments | |
ML13172A281 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 18 - Highly Enriched to Low Enriched Uranium Conversion | |
ML13172A282 | 31 May 2013 | Shine Medical Technologies V. 0 - PSAR Master Table of Contents | |
ML13172A283 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 01 - Figures 1.3-001 Through 1.3-006 | |
ML13172A285 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 02 - Figures 2.1-001 Through 2.1-026 | |
ML13172A286 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 02 - Figures 2.2-001 Through 2.2-002 | |
ML13172A287 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 02 - Figures 2.3-001 Through 2.3-036 | |
ML13172A288 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 02 - Figures 2.4-001 Through 2.4-011 | |
ML13172A289 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 02 - Figures 2.5-001 Through 2.5-006 | |
ML13172A290 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 02 - Figures 2.5-007 Through 2.5-023 | Earthquake |
ML13172A291 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 03 - Figures 3.4-001 Through 3.4-014 | |
ML13172A292 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 04 - Figures 4a2.1-001 Through 4a2.8-002 | |
ML13172A293 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 04 - Figures 4b.3-001 Through 4b.4-007 | |
ML13172A294 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 05 - Figures 5a2.1-001 Through 5a2.4-001 | |
ML13172A295 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 07 - Figures 7a2.1-001 Through 7a2.6-002 | |
ML13172A296 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 07 - Figure 7b.2-001 | |
ML13172A297 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 08 - Figure 8a2.1-001 | |
ML13172A298 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 08 - Figure 8a2.2-001 | |
ML13172A300 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 09 - Figures 9a2.1-001 Through 9a2.7-001 | |
ML13172A301 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 09 - Figures 9b.2-001 Through 9b.7-008 | |
ML13172A302 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 11 - Figures 11.1-001 and 11.1-003 | |
ML13172A304 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 12 - Figure 12.1-001 | |
ML13172A306 | 31 May 2013 | Shine Medical Technologies V. 0 - Section 19.01 - Introduction to the Environmental Report | |
ML13172A307 | 31 May 2013 | Shine Medical Technologies V. 0 - Section 19.02 - Proposed Action | |
ML13172A308 | 31 May 2013 | Shine Medical Technologies V. 0 - Section 19.03 - Description of the Affected Environment | High winds Grab sample Annual Radiological Environmental Operating Report Earthquake Fatality |
ML13172A309 | 31 May 2013 | Shine Medical Technologies V. 0 - Section 19.04 - Impacts of Proposed Construction, Operations, and Decommissioning | Internal Flooding Earthquake Environmental Justice |
ML13172A310 | 31 May 2013 | Shine Medical Technologies V. 0 - Section 19.05 - Alternatives | Earthquake Environmental Justice Fatality |
ML13172A311 | 31 May 2013 | Shine Medical Technologies V. 0 - Section 19.06 - Conclusions | Environmental Justice |
ML13172A312 | 31 May 2013 | Shine Medical Technologies V. 0 - Section 19.07 - References | Annual Radiological Environmental Operating Report License Renewal Earthquake Environmental Justice |
ML13172A313 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 19 - Environmental Review | Environmental Justice |
ML13172A314 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.2.1-001 Through 19.2.3-001 | |
ML13172A315 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.3.1-001 Through 19.3.1-006 | |
ML13172A316 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.3.1-007 Through 19.3.1-009 | |
ML13172A317 | 31 May 2013 | Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.3.2-001 Through 19.3.2-036 |