Issue date | Title | Topic | |
---|---|---|---|
ML010780212 | 14 March 2001 | Safety Evaluation for an Amendment to an Approved 10 CFR 20.2002 Application for the Vermont Yankee Nuclear Power Station | Offsite Dose Calculation Manual |
ML020090718 | 4 February 2002 | 2.206 Petition Conference Call Transcript on 12/27/2001 | |
ML021580366 | 6 June 2002 | Memo to R. Bellamy, RGN-I from: M. Tokar Subject: Region I Independent Spent Fuel Storage Installation Inspection Plans Attachment: Sfpo Comments to Region I Integrated Inspection Plans | |
ML021790175 | 2 July 2002 | Facsimile Transmission, Draft RAI Information to Be Discussed in a Conference Call | |
ML022600292 | 17 September 2002 | Memorandum Regarding Report on the Status of Open TIAs Assigned to NRR | |
ML023230402 | 19 November 2002 | 2.206 Petition from Mr. Raymond Shadis | |
ML023400430 | 5 December 2002 | Petition Pursuant to Title 10 of the Code of Federal Regulations, Section 2.206 (10 CFR 2.206) from Mr. Raymond Shadis | |
ML033010014 | 30 October 2003 | Withholding Information from Public Disclosure | |
ML033640138 | 30 December 2003 | Vermont Yankee, Draft Request for Additional Information | Safe Shutdown Non-Destructive Examination Fire Barrier Coatings Large early release frequency License Renewal Power-Operated Valves Fuel cladding Fire Protection Program Power Uprate |
ML040020063 | 2 January 2004 | Draft Request for Additional Information | |
ML040050187 | 5 January 2004 | Draft Request for Additional Information | |
ML040060695 | 6 January 2004 | Draft Request for Additional Information | |
ML040150571 | 15 January 2004 | Draft Request for Additional Information | Minimum Critical Power Ratio |
ML040300088 | 30 January 2004 | Draft Request for Additional Information | |
ML040480077 | 17 February 2004 | Draft Request for Additional Information | |
ML040490236 | 18 February 2004 | Draft Request for Additional Information | Maintenance Rule Program |
ML041240493 | 30 April 2004 | Memorandum Special Inspection Charter - Two Spent Fuel Rod Segments Unaccounted for in the Vermont Yankee Spent Fuel Pool | |
ML042160026 | 11 August 2004 | Summary of July 7, 2004, Phone Call with Entergy Nuclear Vermont Yankee | |
ML042190386 | 6 August 2004 | Draft Request for Additional Information | |
ML042640055 | 13 October 2004 | Vermont Yankee Extended Power Uprate Schedule | |
ML042950139 | 28 October 2004 | Vermont Yankee- Summary of September 21, 2004 Conference Call with Entergy Re Vermont Yankee Steam Dryer | |
ML043020501 | 17 February 2004 | Memo R. Dennig, NRR, to D. Roberts, NRR, Response to December 8, 2003 Letter from State of Vermont | |
ML043150249 | 29 November 2004 | October 2004 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 | |
ML043360398 | 4 January 2005 | November 2004, Memo., from Brian W. Sheron, Nrr/Adpt to Luis A. Reyes, Nrc/Edo, Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 | |
ML050100337 | 7 July 2005 | Memo to James Lyons, Technical Assistance Related to Auditing Vermont Yankee Containment Analysis for Evaluation of NPSH | |
ML050470240 | 18 February 2005 | VY Power Station - Memo to H. Berkow from A. Wang - Staff Response to Comments on Proposed DD 10 CFR 2.206 Petition Concerning Missing Spent Fuel | |
ML050610487 | 23 March 2005 | Draft Information Memo - May 1, 2005 Thru May 27, 2005 | |
ML050870515 | 28 March 2005 | Draft Request for Additional Information | Moisture barrier |
ML050910016 | 1 April 2005 | Draft RAI, Proposed License Amendment Control Rod Operability, Scram Time Testing and Control Rod Accumulators | |
ML050950340 | 21 April 2005 | March 2005 Report on Status of Public Petitions Under Title 10 of Code of Federal Regulations, Section 2.206 | Preliminary White Finding |
ML050980068 | 8 April 2005 | Draft Request for Additional Information | Hydrostatic Incorporated by reference |
ML051040242 | 14 April 2005 | Draft Request for Additional Information | Probabilistic Risk Assessment |
ML051680009 | 17 June 2005 | 06/30/2005 Forthcoming Meeting with Entergy Nuclear Vermont Yankee, LLC (Entergy) and GE Nuclear Energy (Gene) | |
ML051740074 | 23 June 2005 | 06/30/2005 Revised Forthcoming Meeting with Entergy Nuclear Vermont Yankee, LLC and GE Nuclear Energy - Re Room Location Change | |
ML052030046 | 22 July 2005 | Draft Request for Additional Information | Foreign Material Exclusion |
ML052550304 | 12 September 2005 | 09/14/2005 and 09/15/2005 Forthcoming Closed Meetings with Entergy Nuclear Vermont Yankee, LLC (Entergy) and General Electric Company (GE) to Discuss Reactor Neutronic & Thermal/Hydraulic Analysis for Proposed Extended Power Uprate for Plan | |
ML052620002 | 19 September 2005 | 09/21/2005 Notice of Forthcoming Closed Meeting with Entergy Nuclear Vermont Yankee, LLC and General Electric Company Regarding Void Reactivity Coefficients | |
ML052790439 | 30 April 2004 | Memorandum from A. Blough of USNRC to C. Anderson of USNRC, Regarding Special Inspection Charter - Two Spent Fuel Rod Segments Unaccounted for in the Vermont Yankee Spent Fuel Pool | |
ML052910200 | 21 October 2005 | Vermont Yankee Nuclear Power Station - Draft Safety Evaluation for the Proposed Extended Power Uprate | |
ML052980452 | 27 October 2005 | Vermont Yankee Nuclear Power Station - NRC Staff'S Response to Comments on Proposed Director'S Decision Petition on Alert and Notification System | Enforcement Discretion |
ML053000015 | 13 October 2005 | FEMA Letters on Marlboro, VT and 10-mile from Vermont Yankee | |
ML053080305 | 4 November 2005 | FRN - Power Uprates, November 29-30, 2005 | |
ML053190310 | 21 October 2005 | Memo from L. Marsh to J. Larkins, ACRS, Vermont Yankee - Draft Safety Evaluation for the Proposed Extended Power Uprate | |
ML060410707 | 10 February 2006 | 03/01/2006 Notice of Forthcoming Public Information Session for the U.S. Nuclear Regulatory Commission (NRC) Staff to Describe the License Renewal Process | |
ML060870650 | 2 May 2000 | Memo from Edwin Fox to James Clifford, Subject: Safety Evaluation for an Amendment to an Approved 10 CFR 20.2002 Application for the Vermont Yankee Nuclear Power Station | Offsite Dose Calculation Manual |
ML060880488 | 15 April 2005 | Memo from Stephen Klementowicz, NRR, to Allen Howe, NRR, Subject: Safety Evaluation for an Amendment to an Approved 10 CFR 20.2002 Application for the Vermont Yankee Nuclear Power Station | |
ML061220593 | 9 May 2006 | G20060397/LTR-06-0186 - Alice Moore, Office of Ma Attorney General Re Vermont Yankee Nuclear Power Station'S Extended Power Uprate | |
ML061370708 | 28 April 2006 | Staff Technical Basis for Continued Power Ascension of Vermont Yankee Nuclear Power Station Up to 115% Original Licensed Thermal Power | |
ML061720389 | 20 June 2006 | Staff Technical Basis for Continued Power Ascension of Vermont Yankee Nuclear Power Station to Full Extended Power Uprate Conditions of 120% Original Licensed Thermal Power | |
ML061730397 | 11 July 2006 | 2006/07/11-Summary of Environmental Site Audit Related to the Review of the License Renewal Application for Vermont Yankee Nuclear Power Station | Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |