ML032890044 | 3 October 2003 | Stations - Partial Response to RAI Regarding the Use of Mixed Oxide Lead Fuel Assemblies | Safe Shutdown Shutdown Margin Safe Shutdown Earthquake Fuel cladding Power change |
ML040720367 | 16 September 2002 | Transmittal of a Complete Update of the Route Plan for Route #196 | |
ML042370178 | 20 August 2004 | 8/20/04, Final Safety Evaluation for Duke Topical Report DPC-NE-1005P, Nuclear Design Methodology Using CASMO-4/Simulate-3 MOX | |
ML043560170 | 10 December 2004 | Proposed Amendments to the Facility Operating License and Technical Specifications to Allow Insertion of Mixed Oxide Fuel Lead Assemblies (Additional Information on Revised Does Evaluations) | Operational leakage |
ML082820015 | 12 November 2008 | Issuance of Amendments Regarding Revision 1 to DPC-NE- 1005-P, Nuclear Design Methodology Using Casmo-4/Simulate-3 Mox | |
ML13018A244 | 8 April 2015 | G20110171 - Letter to Licensees on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 | Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML13178A251 | 25 June 2013 | Ltr. to Mike Scaggs Participating in Public Commission Meeting on Nrc'S Construction Activities, on August 27, 2013 | |
ML13178A252 | 25 June 2013 | Ltr. to Luke Scorsone Participate in a Public Commission Meeting on Nrc'S Construction Activities, on August 27, 2013 | |
ML13178A257 | 25 June 2013 | Ltr. to Joseph A. Miller Participating in a Public Commission Meeting on Nrc'S Construction Sctivities, on August 27, 2013 | |
ML15044A477 | 8 April 2015 | Request for Resident Inspector Bandwidth Enhancement Support | |
ML17361A364 | 5 February 2018 | U.S. Nuclear Regulatory Commission Evaluation of Revision to the Physical Protection Plan, Safeguards Contingency Response Plan, and the Training and Qualification Plan for the Mixed Oxide Fuel Fabrication Facility | |
ML18016A308 | 23 January 2018 | U.S. Nuclear Regulatory Commission Acceptance of the Summary of Changes to the Application for the Mixed Oxide Fuel Fabrication Facility 2017 Update | |
ML18025A882 | 5 February 2018 | Request for Additional Information Related to Amendment Number: MPQAP-2017-0001 of the MOX Project Quality Assurance Plan for the Mixed Oxide Fuel Fabrication Facility Under Construction in Aiken, South Carolina with Enclosure | |
ML18025C019 | 25 January 2018 | Mixed Oxide Fuel Fabrication Facility - NRC Inspection Report No. 70-3098/2017-004 | |
ML18051A777 | 28 February 2018 | Safety Evaluation Report Related to the Approval of Amendment Number MPQAP-2017-0001 of the Mixed Oxide Project Quality Assurance Plan for the Mixed Oxide Fuel Fabrication Facility Under Construction in Aiken, South Carolina with Enclosure | |
ML18060A450 | 2 March 2018 | Application Performance Review of Authorized Construction Activities for CB&I Areva MOX Service Mixed Oxide Fuel Fabrication Facility - NRC Report Number 70-3098/2018-001 | |
ML18121A350 | 1 May 2018 | Mixed Oxide Fuel Fabrication Facility - NRC Inspection Report No. 70-3098/2018-002 | Nondestructive Examination |
ML18129A405 | 9 May 2018 | Receipt of Notification of Change in Ownership with No Transfer of Control | |
ML18219B684 | 7 August 2018 | Mixed Oxide Fuel Fabrication Facility - NRC Inspection Report No. 0703098/2018003 | Design basis earthquake |
ML18313A053 | 30 January 2019 | Approval of Request for Exemption from Certain Part 70 Regulatory Requirements Due to a Decision to Terminate the Construction Authorization for the Mixed Oxide Fuel Fabrication Facility | |
ML18318A135 | 8 February 2019 | Letter- Termination of Construction Authorization (CAMOX-001) for the Mixed Oxide Fuel Fabrication Facility | |
ML19078A223 | 19 March 2019 | Mixed Oxide Fuel Fabrication Facility- NRC Inspection Report Number 70-3098/2018-004 | Commercial Grade Dedication Nondestructive Examination |