ML040720367

From kanterella
Jump to navigation Jump to search
Transmittal of a Complete Update of the Route Plan for Route #196
ML040720367
Person / Time
Site: Summer, 07003098  South Carolina Electric & Gas Company icon.png
Issue date: 09/16/2002
From: Becker C
University of Michigan
To: Bennington G
NRC/NMSS/SFPO
References
-RFPFR, 0500002800R
Download: ML040720367 (4)


Text

050O P30ook MICHIGAN MEMORIAL -PHOENIX PROJECT PHOENIX MEMORIAL LABORATORY FORD NUCLEAR REACTOR ANN ARBOR, MICHIGAN 48109-2100 /° September 16, 2002 Mrs. Gloria Bennington Spent Fuel Project Office Nuclear Regulatory Commission OWFN-6F- 18 Washington, D.C. 20555

Dear Mrs. Bennington:

Enclosed is a complete update of the route plan for Route #196. The documents are readable using WordPerfect v. 8 for Windows. Copies are enclosed in both hardcopy and electronic form.

This updated route complies with 10 CFR 73.37, Requirementsfor PhysicalProtection of IrradiatelReactor Fuel in Transit, and NUREG-0561, Revision 1, Physical Protection of Shipments of IrradiatedReactor Fuel. Shipment plans will also ensure that we comply with 10 CFR 73.67(g), In-Transit Requireinenitsfor Special NuclearMaterialof Low Strategic Significance.

Route # 196 is the state-preferred route for irradiated fuel shipments from Ann Arbor, MI to Savannah River, SC. Telephone numbers and points of contact have all been verified to be correct for all states through personal communications. Safe havens have been identified at about 50-mile intervals, including any state-requested locations.

The Route #196 Plan also complies with the NRC SafeguardsAdvisory ForLicensees WVho PrepareOr Receive Shipments Of IrradiatedReactor Fuel (SA-01-02), dated December 13, 2001, as follows:

a. The transport vehicle will be continuously and actively monitored using TRANSCOM.
b. Shipments will have armed escorts at all times. Arrangements will be in place at each state line for transfers of escort responsibilities between each state's LLEA.
c. The drivers wvill be instructed to report suspicious or unusual behavior immediately.
d. Notification will be made to the NRC Operations Center (301-816-5 100) upon both departure and arrival of each shipment.
e. Information regarding the shipment will be limited to those identified and verified persons having a need to know.

The only part of Route #196 which is not in the federal highway system is US-23 from Ann Arbor, Michigan to 1475 in Toledo, Ohio. Michigan and Ohio have approved the use of US-23 and provided written notice to the Federal Highwvay Administration, Traffic Control division.

Phone: (734) 764-6220 Fax: (734) 936-1571 P0vww.umich.edu/-mmpp/

O56 YT The details of the armed escort final arrangements will be provided to all need-to-know individuals when advance notifications are made.

We request NRC approval of Route #196 in a timely manner.

Sincerely, Mr. Christopher W. Becker Nuclear Reactor Laboratory Manager, Ford Nuclear Reactor Encl: Route #196 Plan, updated. (includes Safeguards Information) xc: Correspondence, C. W. Becker NRC Shipping Route Folder

SPENT FUEL PROJECT OFFICE NUCLEAR MATERIAL SAFETY AND SAFEGUARDS SEPTEMBER, 2002 IRRADIATED REACTOR FUEL ROUTE

SUMMARY

UNIVERSITY OF MICHIGAN, ANN ARBOR, Ml TO DOE SAVANNAH RIVER PLANT, SC

[Route 196-Revised]

_argo Diffuth;Mti

  • _ St oud g Escanab ,

Minneapolis J

" Greey Bay~i Fk(Into~l o n aniwo 6ayjy Montperbdr ladon 6nlnt acll tocord Slow buqut-L 0* so L~~illntn. aP;Tj~W tp Y GIe<rIM{!n rF-

-- NE2Ol. A L agjion - Pi~ttsurigia e~ i'va'rkA Agansas ~I i~ iosc \iy

'f,?Washngzton; -

_na C oilk oI la vil Wimngo XaK i a 01 rn Beach flnf' Jo d e r aeac Beach-l --- Carleston.

_annah'

> < lec ates rg gthan*t < ibnY J.

HoYi~ots~towOrl a vcksonviiee.

\Gaiveston ,al Ocal Beach-' 4Datona

°. orlwa '-'-'-' T, j al - Gr2e - - m UAI-FNR: Eclosure I Page 1 of 2

f ROUTE MILAGE

SUMMARY

UNIV. OF MICHIGAN, ANN ARBOR, Ml TO DOE SAVANNAH RIVER PLANT, SC I

State Waypoint! Road Dir Towards Miles to Cumulative

.Instruction - Next Miles

.- _ _ :__ ._ -_ ._ -_ : _ aypoint

~W MI DEPART UNIV. OF MI LOCAL E YPSILANTI 3 0 MI TURN ON US-23 US-23 S OHIO LINE 33 3 Ml STATE MILEAGE SUBTOTAL: 36 OH CONTINUE ON US-23 US-23 S TOLEDO 3 36 OH TURN ON 1-475 1-475 W/S MAUMEE 20 39 OH TAKE 1-75 SOUTH 1-75 S CINCINNATI 194 59 OH GO TOWARDS 1-275 E/S KENTUCKY LINE 29 253 CINCINNATI OH STATE MILEAGE SUBTOTAL: 246 -

KY STAY ON 1-275 1-275 l ERLANGER 11 282 KY TURN ON 1-75 1I-75 IS I TENNESSEE LINE 185 293 KY STATE MILEAGE SUBTOTAL: 196 TN STAY ON 1-75 l -75 JSl GEORGIALINE 165 478 TN STATE MILEAGE SUBTOTAL: 165 GA CONTINUE ON 1-75 1-75 S ATLANTA 98 643 GA TAKE 1-285 AROUND 1-285 E ATLANTA 28 741 ATLANTA GA TURN EAST ON 1-20 1-20 S/E SOUTH CAROLINA 12 769 LINE GA STATE MILEAGE SUBTOTAL: 286 2 L V . ._._.

SC CONTINUE E ON 1-20 1-20 E COLUMBIA 18 781 SC TURN SOUTH ON SC-19 SC-19 S AIKEN/ 20 799 SAVANNAH RIVER

. FACILITY SC STATE MILEAGE SUBTOTAL: 38 ROUTE TOTAL: 819 9 !5 UM-FNR: Enclosure 1 Page2 of 2