 Issue dateTitleTopic
L-95-047, Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 230 September 1995Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 2Boric Acid
Offsite Dose Calculation Manual
ML17318A73631 March 1980Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals, Informal Interim Rept.Prepared for DOE
ML19247E20428 February 1981Technical Evaluation Rept,Tech Specs Change for AR Nuclear One,Unit 2,Docket 50-368, Preliminary Rept
ML19270F41031 December 1978Recommendations to NRC on Inservice Testing Program.Stroke time
Power-Operated Valves
ML19326D92230 June 1980Electrical,Instrumentation & Control Aspects of Low Temp Overpressure Mitigation Sys,Ar Nuclear One,Unit 1.
ML19344D89330 April 1980Technical Evaluation Rept, Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals.
ML19347A87130 September 1980Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Arkansas Unit 2, Interim Technical Evaluation ReptSafe Shutdown Earthquake
ML19351E4149 September 1980Metallurgical Analysis of Failed Turbine Casing Bolt from AR Power & Light,Unit 1.
ML20003F11931 March 1981Tech Spec Change for AR Nuclear One - Unit 2, Technical Evaluation Rept
ML20024B95731 July 1983Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant.
ML20024C85230 June 1983the Effect of Some Operations and Control Room Improvements on the Safety of the Arkansas Nuclear One,Unit One,Nuclear Power PlantProbabilistic Risk Assessment
ML20024E51524 March 1983Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Arkansas Nuclear One Unit 2, Vols 1 & 2Boric Acid
ML20039A17714 December 1981Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment.
ML20039G36930 November 1981Tech Specs for Redundant Decay Heat Removal Capability,Ar Nuclear One,Unit 2.
ML20039G71416 December 1981Operating Reactors PORV & ECCS Repts,Tmi Action Plan Requirements,Ar Nuclear 1.
ML20040D08715 January 1982Technical Evaluation of Licensee Response to IE Bulletin 80-11, Request for Addl Info
ML20040D08815 January 1982Technical Evaluation of Licensee Response to IE Bulletin 80-11, Request for Addl Info
ML20041D08921 December 1981Control of Heavy Loads, Technical Evaluation ReptControl of Heavy Loads
ML20041D21631 January 1982Tech Specs for Redundant Decay Heat Removal Capability, AR Nuclear One,Unit 1, Technical Evaluation Rept
ML20049J61816 December 1981Technical Evaluation of Adequacy of Station Electric Distribution Sys Voltages for AR Nuclear One,Unit 1.Safe Shutdown
Residual transfer
Offsite Circuit
ML20050A29428 February 1982Tech Specs for Redundant Decay Heat Removal Capability, AR Nuclear One,Unit 1, Technical Evaluation Rept
ML20050B97430 June 1980Technical Evaluation,Electrical,Instrumentation & Control Aspects of Low Temp Overpressure Mitigating Sys.
ML20052C50331 March 1982Technical Evaluation of Licensee Response to NUREG-0737, Item II.E.4.2,Position 7,Containment Isolation Dependability - High Radiation Signal to Purge/Vent Valves.
ML20062B76228 May 1982Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, Technical Evaluation ReptAnticipated operational occurrence
Power-Operated Valves
ML20062E23031 July 1982Socioeconomic Impacts of Nuclear Generating Stations: Arkansas Nuclear One Station Case Study.Docket Nos. 50-313 and 50-368.(Arkansas Power and Light Company)
ML20062M04431 July 1982Technical Evaluation Rept of Overpressure Protection Sys for AR Nuclear One,Unit 1, Informal ReptHydrostatic
Earthquake
ML20064M27831 August 1982Interim Reliability Evaluation Program:Analysis of the Arkansas Nuclear ONE-UNIT 1 Nuclear Power Plant.Docket No. 50-313.(Arkansas Power and Light Company)
ML20065F29528 September 1982PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),AR Nuclear One,Unit 1, Technical Evaluation ReptBoric Acid
Shutdown Margin
ML20069C48728 May 1982Auxiliary Feedwater Sys Automatic Initiation & Flow Indication (F-16,F-17),AR Nuclear One,Unit 2, Technical Evaluation ReptShutdown Margin
Anticipated operational occurrence
ML20069C6419 July 1982Masonry Wall Design (B-59), Technical Evaluation Rept
ML20072R96131 March 1991TER Review of ANO-1 CST Seismic DesignEarthquake
ML20076C36424 November 1982ECCS Repts (F-47),TMI Action Plan Requirements,Arkansas Nuclear One,Unit 2, Technical Evaluation Rept
ML20077B85420 July 1983Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements:Generic Rept - B&W Designed Units, Technical Evaluation Rept
ML20079P57321 March 1983ECCS Repts (F-47) TMI Action Plan Requirements,Ar Nuclear One Unit 1, Technical Evaluation Rept
ML20080B49330 November 1994Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Arkansas Nuclear One-1/-2, Dtd Nov 1994
ML20082S7677 October 1983Technical Evaluation Rept on Tests Conducted to Verify Analyses Performed on Adequacy of Station Electric Distribution Sys Voltages for Arkansas Nuclear One,Unit 1
ML20083M3102 April 1984Control of Heavy Loads - Phase Ii,Arkansas Nuclear One, Units 1 & 2, Draft Technical Evaluation ReptSafe Shutdown
Design basis earthquake
Earthquake
Control of Heavy Loads
ML20087J88429 February 1984Review of the Arkansas Nuclear One Generating Station Unit NO.1 Emergency Feedwater System Reliability AnalysisEarthquake
ML20087L91131 August 1983Analysis of 800407 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 1
ML20087L91430 September 1983Analysis of 800624 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 2
ML20087L92030 September 1983Analysis of 800129 Turbine Trip at Arkansas Nuclear One Unit 2
ML20092J90224 September 1982Technical Evaluation Rept,Arkansas Nuclear One,Unit 2, Seismic Qualification of Auxiliary Feedwater SysBackfit
ML20106A66324 September 1984Technical Evaluation Rept,Control of Heavy Loads, Arkansas Nuclear One Units 1 & 2Safe Shutdown
Non-Destructive Examination
Control of Heavy Loads
ML20112E08131 March 1985Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1Boric Acid
ML20112G2777 February 1975Topical Rept on Exams of Portions of Reactor Bldg Spray Sys Piping from Arkansas Nuclear Plant 1
ML20116A47430 September 1992Emergency Feedwater System RISK-BASED Inspection Guide for the Arkansas Nuclear One Unit 2 Power PlantPacking leak
Probabilistic Risk Assessment
ML20116B36628 February 1985Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 2
ML20118A01131 March 1992TER Pump & Valve Inservice Testing Program Arkansas Nuclear One,Unit 1Stroke time
Power Operated Valves
ML20126F25426 August 1982Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982
ML20127A2895 October 1982Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982