Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-95-047, Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 2 | 30 September 1995 | Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 2 | Boric Acid Offsite Dose Calculation Manual |
ML17318A736 | 31 March 1980 | Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals, Informal Interim Rept.Prepared for DOE | |
ML19247E204 | 28 February 1981 | Technical Evaluation Rept,Tech Specs Change for AR Nuclear One,Unit 2,Docket 50-368, Preliminary Rept | |
ML19270F410 | 31 December 1978 | Recommendations to NRC on Inservice Testing Program. | Stroke time Power-Operated Valves |
ML19326D922 | 30 June 1980 | Electrical,Instrumentation & Control Aspects of Low Temp Overpressure Mitigation Sys,Ar Nuclear One,Unit 1. | |
ML19344D893 | 30 April 1980 | Technical Evaluation Rept, Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals. | |
ML19347A871 | 30 September 1980 | Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Arkansas Unit 2, Interim Technical Evaluation Rept | Safe Shutdown Earthquake |
ML19351E414 | 9 September 1980 | Metallurgical Analysis of Failed Turbine Casing Bolt from AR Power & Light,Unit 1. | |
ML20003F119 | 31 March 1981 | Tech Spec Change for AR Nuclear One - Unit 2, Technical Evaluation Rept | |
ML20024B957 | 31 July 1983 | Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant. | |
ML20024C852 | 30 June 1983 | the Effect of Some Operations and Control Room Improvements on the Safety of the Arkansas Nuclear One,Unit One,Nuclear Power Plant | Probabilistic Risk Assessment |
ML20024E515 | 24 March 1983 | Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Arkansas Nuclear One Unit 2, Vols 1 & 2 | Boric Acid |
ML20039A177 | 14 December 1981 | Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. | |
ML20039G369 | 30 November 1981 | Tech Specs for Redundant Decay Heat Removal Capability,Ar Nuclear One,Unit 2. | |
ML20039G714 | 16 December 1981 | Operating Reactors PORV & ECCS Repts,Tmi Action Plan Requirements,Ar Nuclear 1. | |
ML20040D087 | 15 January 1982 | Technical Evaluation of Licensee Response to IE Bulletin 80-11, Request for Addl Info | |
ML20040D088 | 15 January 1982 | Technical Evaluation of Licensee Response to IE Bulletin 80-11, Request for Addl Info | |
ML20041D089 | 21 December 1981 | Control of Heavy Loads, Technical Evaluation Rept | Control of Heavy Loads |
ML20041D216 | 31 January 1982 | Tech Specs for Redundant Decay Heat Removal Capability, AR Nuclear One,Unit 1, Technical Evaluation Rept | |
ML20049J618 | 16 December 1981 | Technical Evaluation of Adequacy of Station Electric Distribution Sys Voltages for AR Nuclear One,Unit 1. | Safe Shutdown Residual transfer Offsite Circuit |
ML20050A294 | 28 February 1982 | Tech Specs for Redundant Decay Heat Removal Capability, AR Nuclear One,Unit 1, Technical Evaluation Rept | |
ML20050B974 | 30 June 1980 | Technical Evaluation,Electrical,Instrumentation & Control Aspects of Low Temp Overpressure Mitigating Sys. | |
ML20052C503 | 31 March 1982 | Technical Evaluation of Licensee Response to NUREG-0737, Item II.E.4.2,Position 7,Containment Isolation Dependability - High Radiation Signal to Purge/Vent Valves. | |
ML20062B762 | 28 May 1982 | Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, Technical Evaluation Rept | Anticipated operational occurrence Power-Operated Valves |
ML20062E230 | 31 July 1982 | Socioeconomic Impacts of Nuclear Generating Stations: Arkansas Nuclear One Station Case Study.Docket Nos. 50-313 and 50-368.(Arkansas Power and Light Company) | |
ML20062M044 | 31 July 1982 | Technical Evaluation Rept of Overpressure Protection Sys for AR Nuclear One,Unit 1, Informal Rept | Hydrostatic Earthquake |
ML20064M278 | 31 August 1982 | Interim Reliability Evaluation Program:Analysis of the Arkansas Nuclear ONE-UNIT 1 Nuclear Power Plant.Docket No. 50-313.(Arkansas Power and Light Company) | |
ML20065F295 | 28 September 1982 | PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),AR Nuclear One,Unit 1, Technical Evaluation Rept | Boric Acid Shutdown Margin |
ML20069C487 | 28 May 1982 | Auxiliary Feedwater Sys Automatic Initiation & Flow Indication (F-16,F-17),AR Nuclear One,Unit 2, Technical Evaluation Rept | Shutdown Margin Anticipated operational occurrence |
ML20069C641 | 9 July 1982 | Masonry Wall Design (B-59), Technical Evaluation Rept | |
ML20072R961 | 31 March 1991 | TER Review of ANO-1 CST Seismic Design | Earthquake |
ML20076C364 | 24 November 1982 | ECCS Repts (F-47),TMI Action Plan Requirements,Arkansas Nuclear One,Unit 2, Technical Evaluation Rept | |
ML20077B854 | 20 July 1983 | Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements:Generic Rept - B&W Designed Units, Technical Evaluation Rept | |
ML20079P573 | 21 March 1983 | ECCS Repts (F-47) TMI Action Plan Requirements,Ar Nuclear One Unit 1, Technical Evaluation Rept | |
ML20080B493 | 30 November 1994 | Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Arkansas Nuclear One-1/-2, Dtd Nov 1994 | |
ML20082S767 | 7 October 1983 | Technical Evaluation Rept on Tests Conducted to Verify Analyses Performed on Adequacy of Station Electric Distribution Sys Voltages for Arkansas Nuclear One,Unit 1 | |
ML20083M310 | 2 April 1984 | Control of Heavy Loads - Phase Ii,Arkansas Nuclear One, Units 1 & 2, Draft Technical Evaluation Rept | Safe Shutdown Design basis earthquake Earthquake Control of Heavy Loads |
ML20087J884 | 29 February 1984 | Review of the Arkansas Nuclear One Generating Station Unit NO.1 Emergency Feedwater System Reliability Analysis | Earthquake |
ML20087L911 | 31 August 1983 | Analysis of 800407 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 1 | |
ML20087L914 | 30 September 1983 | Analysis of 800624 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 2 | |
ML20087L920 | 30 September 1983 | Analysis of 800129 Turbine Trip at Arkansas Nuclear One Unit 2 | |
ML20092J902 | 24 September 1982 | Technical Evaluation Rept,Arkansas Nuclear One,Unit 2, Seismic Qualification of Auxiliary Feedwater Sys | Backfit |
ML20106A663 | 24 September 1984 | Technical Evaluation Rept,Control of Heavy Loads, Arkansas Nuclear One Units 1 & 2 | Safe Shutdown Non-Destructive Examination Control of Heavy Loads |
ML20112E081 | 31 March 1985 | Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1 | Boric Acid |
ML20112G277 | 7 February 1975 | Topical Rept on Exams of Portions of Reactor Bldg Spray Sys Piping from Arkansas Nuclear Plant 1 | |
ML20116A474 | 30 September 1992 | Emergency Feedwater System RISK-BASED Inspection Guide for the Arkansas Nuclear One Unit 2 Power Plant | Packing leak Probabilistic Risk Assessment |
ML20116B366 | 28 February 1985 | Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 2 | |
ML20118A011 | 31 March 1992 | TER Pump & Valve Inservice Testing Program Arkansas Nuclear One,Unit 1 | Stroke time Power Operated Valves |
ML20126F254 | 26 August 1982 | Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 | |
ML20127A289 | 5 October 1982 | Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 |