Fort Calhoun Station - Notification Of Inspection (NRC Inspection Report 05000285-12-005) And Request For Information
ML12310A307
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/05/2012
From: Vincent Gaddy
Operations Branch IV
To: Cortopassi L
Omaha Public Power District
References
IR-12-005
Download: ML12310A307 (7)


See also: IR 05000285/2012005

Text

November 5, 2012

Lou Cortopassi, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550

SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000285/2012005) AND REQUEST FOR INFORMATION

Dear Mr. Cortopassi:

From November 26-30, 2012, inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office will perform the baseline biennial requalification inspection at Fort Calhoun Station, using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program." Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into three groups. The first group (Section A of the enclosure) identifies information to be provided prior to the onsite portion of the inspection to support inspector preparation. The second group (Section B of the enclosure) identifies information the inspectors will need upon arrival at the site. The third group (Section C of the enclosure) identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has departed the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Randy Cade of your Training organization. Our inspection dates are subject to change based on your updated schedule of examination activities. If there are any questions about this inspection or the material requested, please contact the lead inspector, Brian Larson, at (817) 200-1172 (brian.larson@nrc.gov) or Clyde Osterholtz at (817) 200-1269 (clyde.osterholtz@nrc.gov). This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Vincent Gaddy, Chief Operations Branch Division of Reactor Safety

Docket: 50-285 License: DPR-40

Enclosure:

Inservice Inspection Document Request

cc w/enclosure: Electronic Distribution for Fort Calhoun Station