ML20138H658

From kanterella
Revision as of 22:39, 3 September 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Physical Security Insp Rept 50-409/85-16 on 850930-1004. Violations Noted:Failure to Maintain Clear Isolation Zone & Search Hardware & Some Alarm Zones Failed to Perform as Required.Details Withheld (Ref 10CFR73.21)
ML20138H658
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/23/1985
From: Christoffer G, Creed J, Drouin B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20138H609 List:
References
50-409-85-16, NUDOCS 8510290115
Download: ML20138H658 (2)


See also: IR 05000930/2010004

Text

. _.

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION III j

Report No. 50-409/8501G(ORSS)

,

Docket No. 50-409 License No. DPR-45

^

Licensee: Dairyland Power Cooperative

4 2615 East Avenue-South

Lacrosse, WI 54601

Facility Name: Lacrosse Boiling Water Reactor (LACBWR)

Inspection At: LACBWR Site, Genoa, WI

,

Inspection Conducted: September 30 through October 4, 1985

Date of Last Physical Protection Inspection: November 27-30, 1984

, Type of Inspection: Unannounced Physical Security Inspection

,

Inspectors:h.b

e

C Christoffer Date

/3/ZI/6f

Physical Security Inspector

~

m js/?'1

B. Drafjin/ Dat'e'

' -C s'

! Physical Security Inspector

Approved By:

. 1. Creed, Chief Date

h/A5k

feguards Section

4

'

Inspection Summary

Inspection on September 30 through October 4, 1985 (Report No. 50-409/85016(DRSS))

Areas Inspected: Included a review of the licensee's action on Previous

Inspection Findings; Security Plan and Implementing Procedures; Management

Effectiveness; Security Organization, Security Program Audit; Records and

Reports; Testing and Maintenance; Physical Barriers - Protected and Vital Areas;

Assessment Aids; Access Control - Persor.nel; re'ection Aids - Protected Areas;

Training and Qualifications - General Requirements and Safeguards Contingency

'

Plan. The inspection involved 64 inspector hours by two NRC inspectors. The

inspection began during the day shift.

Results: The licensee was found to be in compliance with NRC requirements

,

within the areas examined, except as noted below:

EY 10sure contains

SAFECUARDS INFORMATION

Uron sept. ration this

B510P90115

PDR ADOCA 0 85 p g ,g p G TG Decontrolled

G

-. - -

- _

.-__ - - _ . - _ - . . , . - . - , -

- _ . .. .. . . .. - - - .. _ _

-_

1

.

1. . Physical Barriers - Protected Areas:

Failure to maintain a clear isolation zone.

2. Physical Barriers - Vital Areas:

t- A security screen was inadequately fastened to a vital area structure.

i 3. Access Control - Personnel: '

Search hardware failed to perform as required

.

4. Detection Aids - Protected Areas:

,

Some alarm zones failed to perform as required.

i

j (DETAILS: UNCLASSIFIED SAFEGUARD INFCRMATION)

!

, t

.

.#.nclosure cor.tains

SlEECUARDS I:iFORMATION

Upon secaration this

page is Decontrolled

2

_.., __..__ ..._ __