Text
.
_.
.
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
j Report No. 50-409/8501G(ORSS)
Docket No. 50-409 License No. DPR-45
,
^
Licensee:
Dairyland Power Cooperative 2615 East Avenue-South
Lacrosse, WI 54601 Facility Name:
Lacrosse Boiling Water Reactor (LACBWR)
Inspection At:
LACBWR Site, Genoa, WI Inspection Conducted:
September 30 through October 4, 1985
,
Date of Last Physical Protection Inspection:
November 27-30, 1984 Type of Inspection:
Unannounced Physical Security Inspection
,
/3/ZI/6f Inspectors:h.b e
,
C Christoffer Date Physical Security Inspector
~
js/?'1 B. Drafjin/
Dat'e
' -C s'
m
!
Physical Security Inspector
'
Approved By:
h/A5k
1. Creed, Chief Date
.
feguards Section
'
Inspection Summary Inspection on September 30 through October 4, 1985 (Report No. 50-409/85016(DRSS))
Areas Inspected:
Included a review of the licensee's action on Previous Inspection Findings; Security Plan and Implementing Procedures; Management Effectiveness; Security Organization, Security Program Audit; Records and Reports; Testing and Maintenance; Physical Barriers - Protected and Vital Areas; Assessment Aids; Access Control - Persor.nel; re'ection Aids - Protected Areas;
Training and Qualifications - General Requirements and Safeguards Contingency Plan.
The inspection involved 64 inspector hours by two NRC inspectors.
The
'
inspection began during the day shift.
Results: The licensee was found to be in compliance with NRC requirements within the areas examined, except as noted below:
,
EY 10sure contains SAFECUARDS INFORMATION B510P90115 85 g,g Uron sept. ration this PDR ADOCA 0 p G TG Decontrolled p
G
-.
-
-
-
_
.-__ - - _. - _ -
.
.,. -.
-,
-
- _.
..
..
.
.
..
- - -
..
_
_
-_
.
1.
. Physical Barriers - Protected Areas:
Failure to maintain a clear isolation zone.
2.
Physical Barriers - Vital Areas:
t-A security screen was inadequately fastened to a vital area structure.
i 3.
Access Control - Personnel:
'
Search hardware failed to perform as required
.
4.
Detection Aids - Protected Areas:
Some alarm zones failed to perform as required.
,
i j
(DETAILS: UNCLASSIFIED SAFEGUARD INFCRMATION)
!
t
,
.
.#.nclosure cor.tains SlEECUARDS I:iFORMATION Upon secaration this page is Decontrolled