MONTHYEARML20063N7471982-10-0606 October 1982 Motion for Termination of Proceedings.Util Decided to Cancel Plant.Certificate of Svc Encl ML20063N7591982-10-0606 October 1982 Withdrawal of Application for CP ML20055A7221982-07-15015 July 1982 Memorandum & Order Denying Jf Doherty 820615 Submittals, Treated as Motion to Reconsider ASLB 820602 Order.Motion Untimely Filed & Failed to Show Significance or Gravity of Issues ML20055A3551982-07-12012 July 1982 Amended Contention 59.Certificate of Svc Encl ML20054L4521982-07-0202 July 1982 Response Opposing J Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Fails to Establish Timeliness &/Or Significance of Issues Sought to Be Raised.Certificate of Svc Encl ML20054L5531982-07-0202 July 1982 Response Opposing Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Should Be Considered Motion for Reconsideration of ASLB 820602 Order.Timeliness & Significance of Issues Not Established.W/Certificate of Svc ML20054J9371982-06-28028 June 1982 Response Opposing J Doherty 820615 Request to Reopen Record. Request Improper & Insufficient to Support Relief.Commission Rules Cannot Be Circumvented by Refiling Same Argument After ASLB Ruling Issued.Certificate of Svc Encl ML20054F9861982-06-15015 June 1982 Motion to Reopen Record to Take Evidence on Contention 59. Gravity of Issues Warrants Reopening ML20054G0171982-06-15015 June 1982 Contention 50 Re Brown & Root Deficiencies in Quadrex Rept. Certificate of Svc Encl ML20053D0861982-05-24024 May 1982 Response in Opposition to Util 820519 Motion to Strike Doherty Contention 58 Re Applicant Conduct on Reporting Violations.Contention Should Be Treated as Such,Not as Motion.Certificate of Svc Encl.Related Correspondence ML20052H8621982-05-19019 May 1982 Motion to Strike J Doherty Reply to Applicant 820507 Response to Doherty 820422 Motion to Add Contention 58. Commission Rules Do Not Allow Reply.Certificate of Svc Encl ML20052H4441982-05-14014 May 1982 Reply Opposing Applicant 820507 Response to J Doherty 820422 Motion to Add Contention 58.Contention Should Be Admitted W/Amends.Aslb Should Judge Conduct of Applicants. Certificate of Svc Encl ML20052F3121982-05-0707 May 1982 Response Opposing J Doherty 820422 Motion to Add Contention Re Alleged Failure to Rept Design Defects.Substantively, Motion Is Motion to Reopen Record & Stds Have Not Been Met. Certificate of Svc Encl ML20052D1221982-04-29029 April 1982 Findings of Fact on Supplemental Issues to Tx Pirg Addl Contention 31 Re Technical Qualifications.Certificate of Svc Encl ML20052A4541982-04-22022 April 1982 Submittal of Contention 58 Re Applicant Conduct on Reporting Violations at Plant.Certificate of Svc Encl ML20054E0561982-04-21021 April 1982 Supplemental Findings of Fact on Tx Pirg Addl Contention 31 Re Technical Qualifications.Certificate of Svc Encl ML20050J1111982-04-0606 April 1982 Answers to Second & Third Sets of Interrogatories,Questions 29 & 8 Respectively,Re Quadrex Rept.Certificate of Svc Encl. Related Correspondence ML20050E2961982-04-0505 April 1982 Answers & Objections to Seventh Set of Interrogatories. Certificate of Svc Encl.Related Correspondence ML20050E2891982-04-0505 April 1982 Answers & Objections to Doherty Sixth Set of Interrogatories.Related Correspondence ML20050C4211982-04-0202 April 1982 Objections to Request for Admissions.Requests Untimely, Irrelevant to Issues Before ASLB & Extremely & Unduly Burdensome.Certificate of Svc Encl.Related Correspondence ML20050C4081982-03-31031 March 1982 Answers & Objections to Fifth Set of Interrogatories. Certificate of Svc Encl.Related Correspondence ML20050C4791982-03-29029 March 1982 Answers & Objections to Jf Doherty Fourth Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters. Certificate of Svc Encl.Related Correspondence ML20042C6431982-03-29029 March 1982 Motion for ASLB to Call DE Sells as Witness for Tx Pirg Addl Contention 31 & Quadrex-related Matters.Testimony Needed to Explain Why NRC Did Not Immediately Obtain Quadrex Rept. Certificate of Svc Encl ML20042C6181982-03-29029 March 1982 Response Opposing J Doherty 820315 Motion for ASLB to Subpoena Quadrex Corp Employee Witnesses as ASLB Witnesses. Request Is Based on Misperception of Scope of Reopened Hearings.Certificate of Svc Encl ML20050C5091982-03-26026 March 1982 Response to Jf Doherty 20th & 21st Requests for Documents. Certificate of Svc Encl ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20049K0801982-03-25025 March 1982 Answers & Objections to Interrogatories.Certificate of Svc Encl ML20049K0671982-03-25025 March 1982 Reply to Tx Pirg 820315 Addl Proposed Findings of Fact & Conclusions of Law.Certificate of Svc Encl ML20042C5201982-03-25025 March 1982 Motion to Compel Discovery from Applicant & to Postpone Evidentiary Presentations at 820412 Hearings.Applicant Objections to Interrogatories Unsupported & Necessitate Hearings Be Delayed.Certificate of Svc Encl ML20049K0941982-03-23023 March 1982 Answers & Objections to Second Set of Interrogatories. Certificate of Svc Encl ML20049K0841982-03-23023 March 1982 Answers & Objections to Third Set of Interrogatories. Certificate of Svc Encl ML20042C5481982-03-23023 March 1982 Fourth Set of Requests for Admissions Re Quadrex Rept & Tx Pirg Contention 31.Certificate of Svc Encl ML20042B2351982-03-17017 March 1982 Seventh Set of Interrogatories Re Tx Pirg Addl Contention 31 & Quadrex Rept Matters.Certificate of Svc Encl ML20042A4791982-03-17017 March 1982 Response Opposing J Doherty 820310 Motion for Postponement of 820412 Hearings.Sufficient Grounds Not Provided to Justify Delay.Certificate of Svc Encl ML20042B2451982-03-15015 March 1982 Motion for Subpoena of Quadrex Corp Employees.Testimony Necessary for Clear Understanding of Brown & Root Deficiencies Despite Util Supervision & Specific Steps Needed to Correct & Prevent Problems.W/Certificate of Svc ML20042B2381982-03-15015 March 1982 Sixth Set of Interrogatories Re Tx Pirg Addl Contention 31 & Quadrex Rept Matters.Certificate of Svc Encl.Related Correspondence ML20041F0761982-03-10010 March 1982 Fourth Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Rept.Certificate of Svc Encl.Related Correspondence ML20041F0871982-03-10010 March 1982 Motion for Postponement of 820412 Hearing on Tx Pirg Addl Contention 31 & Quadrex-related Matters.Addl Time Needed to Complete Discovery.Certificate of Svc Encl ML20049J6571982-03-0808 March 1982 Answers to First Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters.Certificate of Svc Encl ML20041E1741982-03-0505 March 1982 Brief Opposing R Alexander Appeal from ASLB 820112 Order Denying Petition to Intervene.Aslb Did Not Abuse Discretion in Denying Petition.Certificate of Svc Encl ML20041E1201982-03-0505 March 1982 Motion for Order Directing Applicant to Provide Forthcoming Bechtel Quadrex Rept Review.Rept Pertinent to Remaining Issue.Certificate of Svc Encl.Related Correspondence ML20041E1181982-03-0505 March 1982 Third Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Rept Matters.Related Correspondence ML20041E1071982-03-0505 March 1982 First Set of Interrogatories & Request for Production of Documents Re Tx Pirg Contention 31.Certificate of Svc Encl ML20041E1001982-03-0505 March 1982 First Set of Interrogatories & Request for Production of Documents.Certificate of Svc Encl ML20041E0711982-03-0404 March 1982 Second Set of Interrogatories Re Tx Pirg Contention 21 & Quadrex Rept Matters.Certificate of Svc Encl.Related Correspondence ML20049H8881982-03-0101 March 1982 Response Opposing D Marrack 820213 Motion for Review of Dates for Reopening Hearings & Continuance.No Commission Regulations or Atomic Energy Act Provisions Require Applicant Irrevocable Commitment.Certificate of Svc Encl ML20041B5381982-02-22022 February 1982 Reply to Intervenors Proposed Findings of Fact & Conclusions of Law.Certificate of Svc Encl ML20041C0671982-02-22022 February 1982 Response Opposing Tx Pirg 820209 Motion for Addl Time to File Proposed Findings of Fact & Conclusion of Law.Motion Mooted by Tx Pirg Filing Proposed Findings on 820212. Certificate of Svc Encl ML20041B5421982-02-17017 February 1982 First Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters.Certificate of Svc Encl.Related Correspondence 1982-07-02
[Table view] Category:PLEADINGS
MONTHYEARML20063N7471982-10-0606 October 1982 Motion for Termination of Proceedings.Util Decided to Cancel Plant.Certificate of Svc Encl ML20054L4521982-07-0202 July 1982 Response Opposing J Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Fails to Establish Timeliness &/Or Significance of Issues Sought to Be Raised.Certificate of Svc Encl ML20054L5531982-07-0202 July 1982 Response Opposing Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Should Be Considered Motion for Reconsideration of ASLB 820602 Order.Timeliness & Significance of Issues Not Established.W/Certificate of Svc ML20054J9371982-06-28028 June 1982 Response Opposing J Doherty 820615 Request to Reopen Record. Request Improper & Insufficient to Support Relief.Commission Rules Cannot Be Circumvented by Refiling Same Argument After ASLB Ruling Issued.Certificate of Svc Encl ML20054F9861982-06-15015 June 1982 Motion to Reopen Record to Take Evidence on Contention 59. Gravity of Issues Warrants Reopening ML20053D0861982-05-24024 May 1982 Response in Opposition to Util 820519 Motion to Strike Doherty Contention 58 Re Applicant Conduct on Reporting Violations.Contention Should Be Treated as Such,Not as Motion.Certificate of Svc Encl.Related Correspondence ML20052H8621982-05-19019 May 1982 Motion to Strike J Doherty Reply to Applicant 820507 Response to Doherty 820422 Motion to Add Contention 58. Commission Rules Do Not Allow Reply.Certificate of Svc Encl ML20052H4441982-05-14014 May 1982 Reply Opposing Applicant 820507 Response to J Doherty 820422 Motion to Add Contention 58.Contention Should Be Admitted W/Amends.Aslb Should Judge Conduct of Applicants. Certificate of Svc Encl ML20052F3121982-05-0707 May 1982 Response Opposing J Doherty 820422 Motion to Add Contention Re Alleged Failure to Rept Design Defects.Substantively, Motion Is Motion to Reopen Record & Stds Have Not Been Met. Certificate of Svc Encl ML20042C6181982-03-29029 March 1982 Response Opposing J Doherty 820315 Motion for ASLB to Subpoena Quadrex Corp Employee Witnesses as ASLB Witnesses. Request Is Based on Misperception of Scope of Reopened Hearings.Certificate of Svc Encl ML20042C6431982-03-29029 March 1982 Motion for ASLB to Call DE Sells as Witness for Tx Pirg Addl Contention 31 & Quadrex-related Matters.Testimony Needed to Explain Why NRC Did Not Immediately Obtain Quadrex Rept. Certificate of Svc Encl ML20042C5201982-03-25025 March 1982 Motion to Compel Discovery from Applicant & to Postpone Evidentiary Presentations at 820412 Hearings.Applicant Objections to Interrogatories Unsupported & Necessitate Hearings Be Delayed.Certificate of Svc Encl ML20042A4791982-03-17017 March 1982 Response Opposing J Doherty 820310 Motion for Postponement of 820412 Hearings.Sufficient Grounds Not Provided to Justify Delay.Certificate of Svc Encl ML20041F0871982-03-10010 March 1982 Motion for Postponement of 820412 Hearing on Tx Pirg Addl Contention 31 & Quadrex-related Matters.Addl Time Needed to Complete Discovery.Certificate of Svc Encl ML20041E1201982-03-0505 March 1982 Motion for Order Directing Applicant to Provide Forthcoming Bechtel Quadrex Rept Review.Rept Pertinent to Remaining Issue.Certificate of Svc Encl.Related Correspondence ML20041E1741982-03-0505 March 1982 Brief Opposing R Alexander Appeal from ASLB 820112 Order Denying Petition to Intervene.Aslb Did Not Abuse Discretion in Denying Petition.Certificate of Svc Encl ML20049H8881982-03-0101 March 1982 Response Opposing D Marrack 820213 Motion for Review of Dates for Reopening Hearings & Continuance.No Commission Regulations or Atomic Energy Act Provisions Require Applicant Irrevocable Commitment.Certificate of Svc Encl ML20041C0671982-02-22022 February 1982 Response Opposing Tx Pirg 820209 Motion for Addl Time to File Proposed Findings of Fact & Conclusion of Law.Motion Mooted by Tx Pirg Filing Proposed Findings on 820212. Certificate of Svc Encl ML20041B5901982-02-13013 February 1982 Motion for Postponement of All Action on CP Application Until Applicant States That Util Irrevocably Committed to Building Plant If CP Received.Certificate of Svc Encl ML20040H0761982-02-0909 February 1982 Motion for 30 Addl Days to File Proposed Findings of Fact & Conclusions of Law.Length of Record Necessitates Extension. Decision Would Not Be Delayed Since Addl Hearings to Be Held in Apr 1982 ML20040E2781982-01-29029 January 1982 Requests for Clarification Re R Alexander 811130 Petition to Intervene.J Silberg 820122 Ltr Indicates That Order Denying Petition Issued,But No Order Has Been Served.Certificate of Svc Encl ML20039B7481981-12-17017 December 1981 Response Opposing Tx Pirg 811207 Motions for Addl Testimony, Further Development of Record & Admission of New Contention. Motion Superficial Attempt to Delay Proceeding & Totally Devoid of Merit.Certificate of Svc Encl ML20062M6441981-12-14014 December 1981 Response Opposing Doherty 811015 Renewed Motion for Addl Evidence on Tx Pirg Contention 31.Doherty Failed to Comply W/Aslb 811110 Order.Motion Is W/O Merit & Would Cause Unnecessary Delay.Certificate of Svc Encl ML20062M6241981-12-0707 December 1981 Motion for Tx Pirg to Present Addl Evidence,To Order Applicant to Serve Tx Pirg W/Quadrex Rept & to Rule That Need for Power Is Tx Pirg Contention.Alternatively,Requests Admittance as Tx Pirg Contention.W/Certificate of Svc ML20039B0771981-12-0707 December 1981 Renewed Motion for Addl Evidence on Tx Pirg Addl Contention 31 Re Applicant Technical Qualifications.Specifies Portions of Quadrex Rept,Indicating Organizational Changes That Should Be Made.Certificate of Svc Encl ML20038A8841981-11-20020 November 1981 Response Opposing Doherty 811106 Motion for Addl Testimony on Need for Power.Pleading Construed as Motion to Reopen Record.Burden of Explaining Why ASLB Would Reach Different Result Not Met.W/Certificate of Svc.Related Correspondence ML20010F4791981-09-0303 September 1981 Response Opposing Further Consideration of Radon Releases. NRC Analysis of Radon Releases in Final Suppl to Fes Satisfies NEPA Requirements,Complies W/Commission 780414 Order & Supplies Sufficient Info.Certificate of Svc Encl ML20010G1101981-09-0303 September 1981 Response to ASLB Request Re Positions on ALAB-640.Radon Emissions Determined by ALAB-640 Constitute Significant Addl Environ Impact.Certificate of Svc Encl ML20010A1171981-08-0505 August 1981 Motion to Strike Marrack Prefiled Testimony.Testimony Is Not Specifically Responsive to F Sanders 810205-06 Testimony. Certificate of Svc Encl.Related Correspondence ML20009B2031981-07-0707 July 1981 Response in Opposition to Intervenor Doherty 810622 Request for Leave to File Contention 57.No Good Cause Shown for Late Filing & No Specificity Provided.W/Science News Article & Certificate of Svc ML20005B3801981-06-22022 June 1981 Request for Leave to File & Submission of Contention 57 Re Vulnerability of Control Sys to Electromagnetic Pulses. Issue Has Not Been Made Public Until Recently.W/Certificate of Svc ML19347F4941981-05-0808 May 1981 Reply Opposing Doherty 810423 Filing Re Contention 56, If Filing Is Motion to Add Late Filed Contention. Contention Refs Alleged Problem at Browns Ferry Which Is Not Applicable to Mark III Containments.W/Certificate of Svc ML19347F4661981-05-0808 May 1981 Response Opposing Doherty 810423 Motion to Reopen Record on Need for Power Contention.Aslb Should Issue Order That Motion Is Moot & Direct Applicant to Update Testimony on Need for Power Testimony Later.Certificate of Svc Encl ML20003H9551981-04-29029 April 1981 Motion for Order Adopting Specific Procedures to Govern Conduct of cross-examination During Health & Safety Phase of Proceeding.Procedures Will Ensure cross-examination Not Cumulative.W/Proposed Order & Certificate of Svc ML19343D3891981-04-27027 April 1981 Motion to Strike I Bross 810331 Affidavit.Affidavit Does Not Respond to Ld Hamilton Supplemental Affidavits But Constitutes Personal Attack of Affiant.Certificate of Svc Encl.Related Correspondence ML20126J9451981-04-24024 April 1981 Motion Opposing Applicant 810422 Motion to Preclude Jm Scott Testimony.Tx Pirg & Intervenor Doherty Are Separate Parties ML20003H7981981-04-22022 April 1981 Motion for Addl Testimony & cross-examination on Conservation Techniques,Interconnection & Effects of Const Delay.Proceedings Have Not Addressed These Issues. Certificate of Svc Encl ML20003H7471981-04-22022 April 1981 Motion to Preclude Jm Scott Testimony.Intent of ASLB 810407 Order Was to Preclude Scott from Having Dual Role of Atty & Witness for Any Other Party.Certificate of Svc Encl. Related Correspondence ML20126H9601981-04-0707 April 1981 Request for Order Directing Util to Reissue 810331 Pleading W/Correct Title.Defective Title Did Not Put All Parties on Notice ML20126H9641981-04-0707 April 1981 Response in Opposition to Util & NRC 810330 Motions to Disqualify Tx Pirg Counsel,Jm Scott.Counsel Will Appear as Expert Witness.Public Interest Requires Counsel Presence. Certificate of Svc Encl ML19347D9721981-03-31031 March 1981 Response to NRC & Applicant Responses to J Doherty 810222 Motion for Reconsideration of Admission of Contention 21. Filing of Motion Was Timely Under Circumstances. Certificate of Svc Encl ML19345G4941981-03-30030 March 1981 Brief,In Form of Pleading,Addressing Need to Disqualify Tx Pirg Counsel Per Disciplinary Rules 5-101 & 5-102.Having Chosen to Appear as Witness,Scott Should Be Barred from Participation as Atty.Certificate of Svc Encl ML19345G5831981-03-24024 March 1981 Response for Order Allowing Intervenors to File Id Bross Supplemental Affidavit to Respond to Ld Hamilton Affidavit on Behalf of Util.One Day Delay Should Be Excused Due to Intervenor Attempt to Comply W/Rules.W/Certificate of Svc ML20003D2161981-03-0404 March 1981 Response Opposing Tx Pirg 810217 Motions on Procedural Matters,Referral of Interlocutory Appeal,Certification of Various Issues & Removal of Aslb.Motion Contains Misrepresentations of Alab Rulings.W/Certificate of Svc ML19341D4801981-02-25025 February 1981 Response to Intervenor Doherty Third Supplemental Response to Motion for Summary Disposition.Intervenor Has No Right to File Late Responses,Shows No Good Cause & Info Has No Relationship to Affected Contentions.W/Certificate of Svc ML20003C3161981-02-17017 February 1981 Requests to ASLB for Interlocutory Appeal & Certification of Questions & to ASLAP for Direct Certification of Question Re Ability of Intervenors to cross-examine Witnesses. Certificate of Svc Encl ML20003B0771981-02-0505 February 1981 Response in Opposition to Intervenor Jf Doherty Contention 55.Contention Does Not Address 10CFR2.714 Requirements & No Good Cause Established for Late Filing.Certificate of Svc Encl ML19345E8521981-01-30030 January 1981 Suppl to 810129 Motion Requesting Reversal of 810123 Ruling Denying Intervenor Rentfro cross-examination Opportunity.Evidence Supporting Intervenor Discernible Interest in Issues Outlined.W/Certificate of Svc ML19345E5721981-01-29029 January 1981 Requests ASLB Reconsider Ruling Restricting cross-examination,for Interlocutory Appeal & Certification of Questions.Also Moves Aslab for Directed Certification of Questions & Appointment of New Aslb.W/Certificate of Svc ML19341B6021981-01-29029 January 1981 Response Opposing Intervenor Doherty 810123 Motion to Change Cross Examination Procedures.Repetitious cross- Examination Would Be Avoided If All Intervenors Attended All Proceedings.Certificate of Svc Encl 1982-07-02
[Table view] |
Text
{{#Wiki_filter:.
.
~
NRC PUBLIC DOCUMENT ROOM
^
[
, . .
UNITED STATES OF AMERICA
-;
' 8-{ .
es,, ='I2
~'
-
NUCLEAR REGULATORY COMMISSION 9% , >lg,jll
-
-}h CTU ~ Y" 2 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD t{} W
$ i In the Matter of S S
HOUSTON LIGHTING & POWER COMPANY S Docket No. 50-466 S
(Allens Creek Nuclear Generating S Station, Unit 1) S APPLICANT'S RESPONSE TO TEXPIRG'S REQUEST FOR ENTRY UPON LAND In response to the Request for Entry Upon Land by Texas Public Interest Research Group, Inc. (TexPirg), Houston Lighting & Power Company (Applicant) files the following objections:
I.
TexPirg's Request for Entry Upon Land fails to set forth and describe the items or lands to be inspected with
" reasonable particularity" as required by S2.714(c) of the Commission's Rules of Practice. The request states that "all parts of the sites" relating to certain contentions will be visited "such as likely reactor sites, the ' Bluff area', Wallis and Sealy sewer plants and their outfalls into the cooling lake, and the barge unloading site." The Request also states that "those parts of the South Texas plant that relate to safety contentions...[are to be examined] closely." This type of
" wholesale" discovery request has been described as "overbroad" under Rule 34 of the Federal Rules of Civil Procedure on which 2357 188 7 906 0 801Q$~ f R4 i
,
.
. .
the Commission's rules are based. United States v. International Business Machines Corporation, 72 F.R.D. 78, 82-85 (S.D.N.Y.
1976). Detweiler Bros., Inc. v. John Graham & Co., 412 F.Supp.
416 (E.D. Wash. 1976). Paiewonsky v. Paiewonsky, 50 F.R.D. 379 (Virg. Isl. D.C. 1970). It has also been found that when descriptions are broad, vague and ambiguous, the relevancy of the request is impossible to judge. Branerton Corp. v.
Ce7missioner of Internal Revenue, 20 F.R. Serv. 2d 690, 64 T.Le No. 16 (U.S. Tax Court 1975), Biliske v. American Live Stock Insurance Co., 73 F.R.D. 124 (W.D. Okla. 1977).
The Commission's relevancy requirement is even more strict than that of the Federal Rules. Section 2.740 (b) (1) of the Commission's Rules of Practice requires that requests be re-lated to matters in controversy as identified in the prehearing conference order. TexPirg asserts that it should "have the freedom to see and visit all parts of the sites that relate to the contentions." However, TexPirg has failed to specifically describe the areas it wishes to see and has failed to state how those specific areas are related to issues in the prehearing order. Accordingly, the motion is deficient on its face.
II.
The Request is also objectionable on the grounds that the proposed manner of inspection is not reasonable.
TexPirg asks that en unspecified number of people be allowed to make the inspection, including any or all unnamed " Tex PIRG members, their attorney, and any witnesses" (which TexPirg admits are as of yet unnamed) and indeed "all parties."
2357 189
.
. .
TexPirg cites no reason or need for allowing numerous un-named individuals to visit the sites. The Request indicates that TexPirg has no real need or purpose in making this inspection. TexPirg's field day approach to the inspection of Applicant's property is not contemplated under the Commis-sion's rules or the Federal Rules of Civil Procedure. Under Federal Rule 34, on site inspections have been strictly limited as to the number of individuals allowed on the property, and the credentials of those making the inspec-tion. Morales v. Turman, 59 F.R.D. 157 (E.D. Tex. 1972);
Cox v. E. I. DuPont de Nemours and Company, 38 F.R.D. 396 (South Carolina D.C. 1965); U.S. v. National Steel Corporation, 26 F.R.D. 603 (S.D. Tex. 1960); Martin v. Reynolds Metals Corp.,
297 F.2d 49 (9th Cir. 1961). Clearly, the inspection would be preinature and a complete waste of time since TexPirg has not retained a single expert witness whose testimony would be aided by the requested inspection. Without limitation as to numbers and credentials, an inspection would be irrelevant since the observers would not be competent to assess what they see and, therefore, the visit would not lead to admissible e'. ~.d e n c e .
III.
Applicant specifically objects to the request that it " guide" the inspection. This request does not comply with either S2.741 of the Commission's rules nor the Federal Rules. The request to be " guided" is no different than a request that Applicant be ordered to make assessments for 2357 190
__
.
.
TexPirg. Applicant cannot be required to make such assess-ment, Sladen v. Girltown, 425 F.2d 24 (7th Cir. 1970).
Sperberg v. Firestone Tire & Rubber Co., 61 F.R.D. 80 (N.D.
Ohio 1973). Similarly, Applicant cannot be forced to lead a tour of ite facilities. Applicant's only burden is to provide access. TexPirg must then interpret what it sees and cannot ask Applicant to give over its expertise on those matters. TexPirg's request for a guided tour further indi-cates that the entire request is irrelevant, without purpose, and unnecessary. Unless TexPirg's representatives are capable of making their own assessments of what is to be seen, TexPirg cannot hcpe to come away from the tour with anything tending to lead to admissible evidence.-1/
IV.
Applicant specifically objects to the request for inspection of the planned barge unloading facility and the Wallis and Sealy sewer plants and their outfalls. Under S2. 741(a) (2) of the Commission's Rules of Practice, only sites in possession or control of the party are open to 1/ If Applicant is ordered to provide access to TexPirg, Applicant would, of course, expect to accompany TexPirg on any entry on its property, but should not be ex-pected to guide a tour group for individuals who know nothing about what they see.
2357 191
.
.
inspection. Federal Rule 34 has the same limitation. The barge unloading area has not been acquired by the Applicant.
The sewer plants and their outfalls are not owned by Applicant.
and will never be. Applicant does not possess and has no control over these areas. The request for entry is therefore overbroad and cannot be complied with. La Chemise Lacoste
- v. Alligator Company, Inc., 60 F.R.D. 164, 171 (Del. D.C.
1973); Folding Carton Antitrust Litigation, 76 F.R.D. 420 (N.D. Ill. 1977).
.
V.
Applicant specifically objects to the request that the site of the South Texas Nuclear Project be inspected.
The issues related to TexPirg's request for inspection of the South Texas plant (i.e. " safety contentions such as the
' buckling of the containment', thickness of the concrete shield, and reactor vessel") are at issue in this proceed-ing, if at all, only with respect to the Allens Creek pro-ject. The PWR design of the South Texas Project, particularly the containment, is much different from that of the BWR design of Allens Creek, and, therefore, inspecting these features of the South Texas plant would be irrelevant, would not tend to lead to admissible evidence, and would be outside the scope of the contentions in issue, thus violat-ing S2. 74 0 (b) (1) of the Commission's rules.
2357 i92.
.
.
e VI.
For each of the foregoing reasons, TexPirg's motion should be denied. Applicant suggests that the denial can be without prejudice to a later request to be filed when and if TexPirg retains an expert wintess whose testimony is to cover site specific contentions. In such a motion, TexPirg must set forth the name of the expert witness, the subject matter of his testimony, the specific areas of the site to be examined and the information sought by examination of such areas.
Respectfully submitted, OF COUNSEL: . V e J Grego g Cypeland '
BAKER & BOTTS arles G. TMrash 3000 One Shell Plaza 000 One Shell Plaza Houston, Texas 77002 souston, Texas 77002 LOWENSTEIN, NEWMAN, REIS, Jack R. Newman AXELRAD & TOLL Robert H. Culp 1025 Connecticut Ave., N.W. 1025 Connecticut Ave., N.W.
Washington, D. C. 20036 Washington, D. C. 20036 Attorneys for Applicant h0USTON LIGHTING & POWER COMPANY 2357 193
'
..
. .
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of S S
HOUSTON LIGHTING & POWER COMPANY S Docket No. 50-466 S
(Allens Creek Nuclear Generating S Station, Unit 1) S CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Applicant's Response to TexPirg's Request for Entry Upon Land in the above-captioned proceeding were served on the following by deposit in the United States mail, p stag.
prepaid, or by hand-delivery this 3dyT day of ,
1979. / (
Sheldon J. Wolfe, Esq., Chairman Richard Lowerre, Esq.
Atomic Safety and Licensing Assistant Attorney General Board Panel for the State of Texas U.S. Nuclear Regulatory Commission P. O. Box 12548 Washington, D. C. 20555 Capitol Station Austin, Texas 78711 Dr. E. Leonard Cheatum Route 3, Box 350A Hon. Charles J. Dusek Watkinsville, Georgia 30677 Mayor, City of Wallis P. O. Box 312 Mr. Gustave A. Linenberger Wallis, Texas 77485 Atomic Safety and Licensing Board Panel Hon. Leroy H. Grebe U.S. Nuclear Regulatcry Commission County Judge, Austin County Washington, D. C. 20555 P. O. Box 99 Bellville, Texas 77418 Chase R. Stephens Docketing and Service Section Atomic Safety and Licensing Office of the Secretary of the Appeal Board Commission U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D. C. 20535 Washington, D. C. 20555 R. Gordon Gooch, Esq. Atomic Safety and Licensing Baker & Botts Board Panel 1701 Pennsylvania Avenue, N. W. U.S. Nuclear Regulatory Washington, D. C. 20006 Commission Washington, D. C. 20555 2357 l94
.
. ..
Steve Schinki, Esq.
Staff Counsel U. S. Nuclear Regulatory Commission Washington, D. C. 20555 John F. Doherty
-
4438 1/2 Leeland Houston, Texas 77023 Madeline Bass Framson 4822 Waynesboro Drive Houston, Texas 77035 Robert S. Framson 4822 Waynesboro Drive Houston, Texas 77035 Carro Hinderstein 8739 Link Terrace Houston, Texas 77025 D. Marrack 420 Mulberry Lane Bellaire, Texas 77401 Brenda McCorkle 6140 Darnell Houston, Texas 77074 F. H. Potthoff, III 1814 Pine Village Houston, Texas 77080 Wayne E. Rentfro P. O. Box 1335 Rosenberg, Texas 77471 James M. Scott, Jr.
8302 Albacore Houston, Texas 77074 bfMcur bebnel-J.[Grego C peland 2357 i95
}}