BSEP 13-0016, ISFSI - Registration and Use of Cask to Store Spent Fuel

From kanterella
Revision as of 08:32, 22 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
ISFSI - Registration and Use of Cask to Store Spent Fuel
ML13052A273
Person / Time
Site: Brunswick, 07200006, 07201004  Duke Energy icon.png
Issue date: 02/12/2013
From: Pope A
Duke Energy Carolinas
To:
Document Control Desk, NRC/NMSS/SFST
References
BSEP 13-0016
Download: ML13052A273 (3)


Text

PDuke W Energy10 CFR 72.212(b)(2)

FEB 12 2013 Serial: BSEP 13-0016 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Docket Nos. 50-325, 50-324 Independent Spent Fuel Storage Installation (ISFSI) Docket No.72-006 Registration and Use of Cask to Store Spent Fuel In accordance with 10 CFR 72.212(b)(2), Carolina Power & Light Company (CP&L) is registering use of two approved spent fuel storage casks at the Brunswick Steam Electric Plant (BSEP) ISFSI. Registration of these casks is required no later than 30 days after using the casks to store spent fuel. The required cask registration information is enclosed.The General Requirements and Conditions of the Technical Specifications for Amendment No. 10 to Certificate of Compliance No. 1004, Section 1.1.7, "Special Requirements for First System in Place," also requires a 30-day notification of the results of a thermal performance assessment for the first cask system in place. This information is required for the dry storage canister (DSC) with the highest heat load. The highest heat load to date was DSC BNP-61BTH-2-F-1-HZ08, which was reported by CP&L's letter dated February 24, 2011 (i.e., ADAMS Accession Number ML110670429);

therefore, a thermal performance assessment is not being provided for the casks being registered by this letter.This document contains no regulatory commitments.

Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager -Regulatory Affairs, at (910) 457-2487.Sincerely, A teH. Pope Manager -Organizational Effectiveness Brunswick Steam Electric Plant

", w .4.U.S. Nuclear Regulatory Commission Page 2 of 2 WRM/wrm

Enclosure:

Cask Registration Information Required by 10 CFR 72.212(b)(2) cc (with enclosure):

U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Victor M. McCree, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U. S. Nuclear Regulatory Commission ATTN: Ms. Michelle P. Catts, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission ATTN: Mr. Christopher Gratton (Mail Stop OWFN 8G9A)11555 Rockville Pike Rockville, MD 20852-2738 Chair -North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Mr. W. Lee Cox, III, Section Chief Radiation Protection Section North Carolina Department of Health and Human Services 1645 Mail Service Center Raleigh, NC 27699-1645 BSEP 13-0016 Enclosure Page 1 of 1 Cask Registration Information Required by 10 CFR 72.212(b)(2)

The following information is required by 10 CFR 72.212(b)(2), which states that the general licensee shall "Register use of each cask with the Nuclear Regulatory Commission no later than 30 days after using that cask to store spent fuel." Licensee Name Carolina Power & Light Company Licensee Address Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461-0429 Reactor License Numbers DPR-71 (Unit 1)DPR-62 (Unit 2)Reactor Docket Numbers 50-325 (Unit 1)50-324 (Unit 2)Independent Spent Fuel Storage 72-006 Installation (ISFSI) Docket Number Person Responsible for Providing Lee Grzeck Additional Information Manager -Regulatory Affairs (910) 457-2487 Cask Certificate of Compliance 1004, Amendment 10 Number Cask Model Number Type 2 NUHOMS-61BTH Horizontal Storage Module (HSM) HSM-H / 0-ISFSI-HSM-009 Model Number / HSM Number (for BNP-61 BTH-2-D-2-LT0 1)HSM-H / 0-ISFSI-HSM-010 (for BNP-61 B.TH-2-D-2-LT02)

Cask Identification Number BNP-61BTH-2-D-2-LT01 BNP-61 BTH-2-D-2-LT02 Cask Heat Load 22.212 kW (BNP-61BTH-2-D-2-LT01) 22.310 kW (BNP-61 BTH-2-D-2-LT02)

Service Date January 19, 2013 (BNP-61BTH-2-D-2-LT01)

January 29, 2013 (BNP-61 BTH-2-D-2-LT02)