ML14339A624

From kanterella
Revision as of 10:36, 9 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Dominion Energy Kewaunee, Inc., Updated Safety Analysis Report (Usar), Rev 25
ML14339A624
Person / Time
Site: Kewaunee  Dominion icon.png
Issue date: 11/24/2014
From:
Dominion Energy Kewaunee
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML14339A626 List:
References
14-572
Download: ML14339A624 (3)


Text

~Domi nioni Dominion Energy Kewaunee, Inc.5000 Dominion Boulevard, Glen Allen, VA 23060 Web -Address:

www.dom.com November 24, 2014 U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555 Serial No.14-572 KPS/LIC/CDS:

RO License No. DPR-43 Docket No. 50-305 72-64 DOMINION ENERGY KEWAUNEE.

INC.KEWAUNEE POWER STATION UPDATED SAFETY ANALYSIS REPORT, REVISION 25 Pursuant to 10 CFR 50.71(e), Dominion Energy Kewaunee, Inc. (DEK) submits Revision 25 to the Updated Safety Analysis Report (USAR) for Kewaunee Power Station.Two CD-ROMs are included with this submittal.

The first CD-ROM is labeled,"Kewaunee Power Station Updated Safety Analysis Report Revision 25, November 2014." The first CD-ROM contains the following files: 000 001 002 003 004 005 006 007 008 009 010 011 012 013 014 015 016 017 018 019 020 021 022 023 KPS USAR Frontmatter.pdf KPS USAR Chapter l.pdf KPS USAR Chapter 2.pdf KPS USAR Chapter 3.pdf KPS USAR Chapter 4.pdf KPS USAR Chapter 5.pdf KPS USAR Chapter 6.pdf KPS USAR Chapter 7.pdf KPS USAR Chapter 8.pdf KPS USAR Chapter 9.pdf KPS USAR Chapter 10.pdf KPS USAR Chapter 11 .pdf KPS USAR Chapter 12.pdf KPS USAR Chapter 13.pdf KPS USAR Chapter 14.pdf KPS USAR Chapter 15.pdf KPS USAR Appendix A.pdf KPS USAR Appendix B.pdf KPS USAR Appendix C.pdf KPS USAR Appendix D.pdf KPS USAR Appendix E.pdf KPS USAR Appendix F.pdf KPS USAR Appendix G.pdf KPS USAR Appendix H.pdf 1,030,144 bytes, publicly available.

18,485,248 bytes, publicly available.

15,079,424 bytes, publicly available.

505,856 bytes, publicly available.

49,152 bytes, publicly available.

4,685,824 bytes, publicly available.

268,288 bytes, publicly available.

126,976 bytes, publicly available.

18,608,128 bytes, publicly available.

34,390,016 bytes, publicly available.

2,283,520 bytes, publicly available.

31,217,664 bytes, publicly available.

110,592 bytes, publicly available.

40,960 bytes, publicly available.

358,400 bytes, publicly available.

317,440 bytes, publicly available.

3,819,520 bytes, publicly available.

647,168 bytes, publicly available.

51,200 bytes, publicly available.

40,960 bytes, publicly available.

8,091,648 bytes, publicly available.

38,912 bytes, publicly available.

57,344 bytes, publicly available.

40,960 bytes, publicly available.

1__5 fA SS" a, tAos%

Serial No.14-572 KPS USAR Revision 25 Page 2 of 3 The second CD-ROM included with this submittal contains two files. These files provide the most recent revisions of the KPS Fire Protection Program documents.

These documents are the Fire Protection Program Plan (FPPP) and the Fire Protection Program Analysis (FPPA). These fire protection program documents are "incorporated by reference" into the KPS USAR. The second CD-ROM is labeled, "Kewaunee Power Station Fire Protection Program Documents, October 2014," and contains the following files: 024 KPS FPPP Rev 14 600,064 bytes, publicly available.

025 KPS FPPA Rev 12 7,116,800 bytes, publicly available.

The KPS Technical Requirements Manual (TRM) is also incorporated by reference into the KPS USAR. Changes to the TRM were included in the most recent submittal of changes to the KPS Technical Specification (TS) Bases. TS Bases changes implemented without prior NRC approval are required by TS 5.5.12, "Technical Specifications (TS) Bases Control Program," to be submitted to the NRC on a frequency consistent with 10 CFR 50.71(e).

The most recent submittal of KPS TS Bases and TRM changes was by letter dated April 3, 2014 (Reference 1).Should you have any questions, please contact Mr. Craig Sly at (804) 273-2784.Very truly yours, Mark D. Sartain Vice President

-Nuclear Engineering Dominion Energy Kewaunee COMMONWEALTH OF VIRGINIA ) I Notary Public I Commonwealth of Virginia Reg. # 7518653 COUNTY OF HENRICO ) a ommission Expires December 31, 20ff,2 The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President Nuclear Engineering of Dominion Energy Kewaunee, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.Acknowledged before me this ../!day of 2014.My Commission Expires: -eA[.. Notary Public Serial No.14-572 KPS USAR Revision 25 Page 3 of 3

References:

1. Letter from J. T. Stafford (DEK) to NRC Document Control Desk, "Technical Specification Bases Changes and Technical Requirements Manual Changes," dated April 3, 2014.

Enclosures:

1. CD-ROM labeled, "Kewaunee Power Station Updated Safety Analysis Report, Revision 25, November 2014." 2. CD-ROM labeled, "Kewaunee Power Station Fire Protection Program Documents, October 2014." Commitments made in this letter: None cc: U.S. Nuclear Regulatory Commission (w/ one CD-ROM set)Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. W. C. Huffman, Project Manager (w/ one CD-ROM set)U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-Dl 5 11555 Rockville Pike Rockville, MD 20852-2738 Theodore R. Smith, Decommissioning Project Manager (w/ one CD-ROM set)U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop T8-F05 11555 Rockville Pike Rockville, MD 20852-2738