ML17309A794

From kanterella
Revision as of 19:29, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Suppl to ISI Plan Second ten-yr Interval Revised Stress & Fracture Mechanics Evaluations Pressurizer Instrument Nozzles
ML17309A794
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/02/1995
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B236 List:
References
L-95-220, NUDOCS 9508100176
Download: ML17309A794 (4)


Text

PRIORITY (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9508100176 DOC.DATE: 95/08/02 NOTARIZED:

NO DOCKET g FACIL:50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.05000389 P AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.

Florida Power&.Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards suppl to ISI plan second ten-yr interval revised stress&fracture mechanics evaluations pressurizer instrument nozzles.DISTRIBUTION CODE: A047D COPIES RECEIVED: LTR j ENCL j SIZE:2+~i TITLE: OR Submittal:

Inservice/Testing/Relief from ASME Code-GL-89-04 NOTES: 0 RECIPIENT ID CODE/NAME PD2-1 LA NORRIS,J INTERNAL: C ZKE CEN ER ED0-MEB OGC/HDS3 EXTERNAL: LITCO ANDERSON NOAC COPIES LTTR ENCL 1 1 1 1 6 0 1 1 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB LITCO RANSOME,C NRC PDR COPIES LTTR ENCL 1 1 1 1 1" 1 1 1 1 1 1 1 1 1 D 0, N NOTETO ALL"RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DB (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 13 1

0 P.O.Box 128, Ft.Pierce, FL 34954-0120 August 2, 1995 L-95-220 10 CFR 50.4 10 CFR 50.55a U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 RE: St.Lucie Unit 2 Docket No.50-389 In-Service-Inspection Plan Second Ten-Year Interval Revised Stress and Fracture Mechanics Evaluations Pressurizer Instrument Nozzles-Su lement By letter(L-95-185) dated July 7, 1995, Florida Power and Light Company (FPL)provided a response to your June 9, 1995 request for additional information (RAI).The information was submitted to support the Staff's review of the'PL evaluation of flaw indications and subsequent in-service inspection (ISI)plans submitted by FPL letter L-95-74 on March 2, 1995.FPL requested the approval by July 1, 1995, to support planning for the Fall 1995 Unit 2 refueling outage.In a conference call on July 25, 1995, the NRC reviewer requested FPL to submit stress and fracture mechanics evaluations revised in response to the RAI.Attachments A and B are the revised evaluations you requested.

Please contact us should you need any additional clarifications.

Very truly yours, D.A.Vice St.L ager esident ie Plant DAS/GRM cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant 080095 9508100i7b 950802 PDR ADOCK 05000389 9 PDR an FPL Group company NUCLEAR ENGINEERING DEPAR7MEN7 CoMPoNENTi SUPPoRT AND INsPEcTIoNs P.O.Box 14000 JUNo BEAcH, FioRIDA 33408 St.Lucie Nuclear Power Plant Unit 2 ATTACHMENT A FRACTURE MECHANICS EVALUATION OF ST.LUCIE PRESS URIZER INS TRUMENT NOZZLES Prepared by B&VY NUCLEAR SERVICE COMPANY For St.Lucie Nuclear Power Plant 10 Miles South of Ft.Pierce on A1A Ft.Pierce, Florida 33034 Revision Number: 2 Date: Commercial Service Date: NRC Docket Number: Document Number: August 8, 1983 50-389 32-1235128-02 July 11, 1995 08/02/95....

9508100176