Letter Sequence Other |
---|
|
|
MONTHYEARML0722600082007-08-23023 August 2007 Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac No. MD4524) Project stage: Other ML0723400102007-08-23023 August 2007 Revised Pages of Facility Operating License DPR-72 B.5.b Project stage: Other 2007-08-23
[Table View] |
|
---|
Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 ML21238A0952021-10-13013 October 2021 Issuance of Amendment No. 259 Approving the ISFSI-Only Emergency Plan, Revision Draft a ML20069A0262020-04-0101 April 2020 CR-3 License Transfer Enc 2 Att 1 FOL Amnd 258.doc ML20069A0252020-04-0101 April 2020 CR-3 License Transfer Enc 2 Amendment ML19129A1412019-05-15015 May 2019 Corrected Page for Amendment No. 257 to License No. DPR-072 for Duke Energy Florida, Inc ML19080A1872019-05-0303 May 2019 Enclosure 1 Amendment No. 257 to License No. DPR-72 Duke Energy Florida, Inc., Crystal River, Unit 3, Docket No. 50-302 ML18017A9882018-02-14014 February 2018 Amendment No. 256 to License No. DPR-72 Duke Energy Florida, LLC Crystal River Unit 3 Nuclear Generating Plant Docket No. 50-302 ML17027A1612017-06-27027 June 2017 Enclosure 1, Amendment to Crystal River License No. DPR-72 ML17027A1632017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254, Table of Contents ML17027A1642017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254, Section 4.0 ML17027A1652017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254 Section 5.0 ML17027A1602017-06-27027 June 2017 Ltr to T. Hobbs re: Crystal River Unit 3 Nuclear Generating Plant - Amendment to Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pools ML17027A1622017-06-27027 June 2017 Facility Operating License Pages ML17096A2812017-06-22022 June 2017 Amendment to License No. DPR-72 Duke Energy Florida, LLC Crystal River Unit 3 Nuclear Generating Plant Docket No. 50-302 ML17096A2822017-06-22022 June 2017 FOL Amnd 254 ML17048A4782017-03-22022 March 2017 Amendment to License No. DPR-72 for ISFSI Emergency Plan and EAL Bases Manual ML16244A1012016-12-0505 December 2016 Amendment Approving ISFSI Emergency Plan ML16293A2002016-11-30030 November 2016 Operating License Amendment 251 Changed Pages ML16173A0232016-08-10010 August 2016 Revised License Pages for License Transfer, Crystal River Unit 3 ML16173A0212016-08-10010 August 2016 Conforming Amendment for License Transfer, Crystal River Unit 3 ML15261A4522015-11-27027 November 2015 Nuclear Generating Plant - Issuance of Amendment No. 249 Regarding Technical Specification Change of Management Titles to General Manager Decommissioning ML15224B2862015-09-0404 September 2015 Nuclear Generating Plant - Issuance of Amendment for Operating License and Technical Specification Based on Permanently Shutdown and Defueled Status ML15121A5702015-05-29029 May 2015 Letter, Safety Evaluation for Order Approving Transfer of Licenses and Conforming Amendments ML15027A2092015-03-31031 March 2015 Issuance of Amendment Regarding Changes to the Emergency Plan and Emergency Action Levels ML14318A9292014-12-19019 December 2014 H. B. Robinson; Shearon Harris Nuclear Power Plant; and Crystal River, Unit 3 - Issuance of License Amendments Regarding Revision to Cyber Security Plan Implementation Schedule Completion Date (TAC Nos. MF3263 - MF3267) ML14097A1452014-07-11011 July 2014 Nuclear Generating Plant - Issuance of Amendment No. 244, Revise Technical Specifications to Remove Certain Requirements from Section 5, Administrative Controls ML13158A2772013-10-18018 October 2013 Issuance of Amendment Regarding the Request to Change the Licensee'S Name ML12339A0672012-12-18018 December 2012 Issuance of License Amendments Regarding Cyber Security ML12136A3922012-06-26026 June 2012 Issuance of Amendment Regarding Departure from a Method for Evaluating the Auxiliary Building Overhead Crane and Revisions to Associated Commitments ML12081A2792012-03-19019 March 2012 License Amendment Request #312, Revision 0, Departure from a Method of Evaluation for the Auxiliary Building Overhead Crane - Implementation Schedule Change Request ML11292A0412012-02-24024 February 2012 Nuclear Generating Plant - Issuance of Amendment 240 Regarding Improved Technical Specifications 3.7.19 Diesel Drive Emergency Feedwater Pump Fuel Oil, Lube Oil, and Starting Air ML11321A1652011-12-27027 December 2011 Nuclear Generating Plant - Issuance of Amendment 239 Regarding Departure from a Method for Evaluating the Auxiliary Building Overhead Crane and Revisions to Associated Commitments ML11193A0282011-07-29029 July 2011 Issuance of Amendments Approval of Cyber Security Plan ML0911000562009-05-29029 May 2009 License Amendment, Issuance of Amendment Regarding the Revision of the Steam Generator Portion of the Technical Specifications to Replacement of the Steam Generators ML0834704912009-01-0909 January 2009 Issuance of Amendment Regarding Revisions to Improved Technical Specification Surveillance Requirement 3.7.5.2, Emergency Feedwater System ML0820200062008-07-30030 July 2008 Issuance of Amendment 230 Regarding Control Room Envelope Habitability in Accordance with TSTF-448 ML0801403722008-01-14014 January 2008 Cyrstal River Unit 3 - Administrative Correction to Amendment Steam Generator Reporting Requirements (Tac. MD7453) ML0729103172007-10-25025 October 2007 License Amendment 227 Fuel Storage Patterns in the Spent Fuel Pool ML0725501372007-10-24024 October 2007 Issuance of Amendment Regarding Spent Fuel Pool Missile Shields ML0728508942007-10-23023 October 2007 License Amendment 225 Regarding Nuclear Services Closed Cycle Cooling Water System ML0723400102007-08-23023 August 2007 Revised Pages of Facility Operating License DPR-72 B.5.b ML0715004662007-06-15015 June 2007 License Amendment, Issuance of Amendment to Adopt TSTF-372 ML0713401122007-05-16016 May 2007 Issuance of License Amendment 223 Regarding Steam Generator Tube Inspection Program ML0709401402007-03-27027 March 2007 Administrative Amendment for EA-06-037 ML0529401792005-10-31031 October 2005 License Amendment, Probabilistic Methodology for Tube End Crack Alternate Repair Criteria, TAC No. MC5813 ML0525900462005-09-15015 September 2005 License Amendment, Temporary Extension of the Nuclear Services Seawater System Train Completion Time ML0522101892005-09-0606 September 2005 License Amendment No. 220 Regarding Removal of Obsolete Footnotes from the Technical Specifications ML0517103812005-08-0404 August 2005 License Amendment, Reactor Building Spray Nozzle Surveillance Requirement ML0518903482005-07-27027 July 2005 Amendment 218, Surveillance Requirements for RCP Flywheel Inspection ML0511104972005-04-19019 April 2005 Amendment 217, TS Revision to Eliminate Monthly Operating and Annual Occupational Radiation Exposure Reports Requirements 2021-11-24
[Table view] |
Text
ENCLOSURE 1REVISED PAGE OF FACILITY OPERATING LICENSE NO. DPR-72DOCKET NO. 50-302CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANTReplace the following page of the Facility Operating License. The revised page is identified bythe date of the letter issuing the page and contains a marginal line indicating the area of change.REMOVEINSERTPage 5cPage 5c
- 5c -2.C.(14)Mitigation Strategy License ConditionThe licensee shall develop and maintain strategies for addressing large fires andexplosions and that include the following key areas:(1) Fire fighting response strategy with the following elements:a. Pre-defined coordinated fire response strategy and guidanceb. Assessment of mutual aid fire fighting assetsc. Designated staging areas for equipment and materialsd. Command and controle. Training of response personnel(2) Operations to mitigate fuel damage considering the following:a. Protection and use of personnel assetsb. Communicationsc. Minimizing fire spreadd. Procedures for implementing integrated fire response strategye. Identification of readily-available pre-staged equipmentf. Training on integrated fire response strategyg. Spent fuel pool mitigation measures(3) Actions to minimize release to include consideration of:a. Water spray scrubbingb. Dose to onsite responders2.DPhysical ProtectionThe licensee shall fully implement and maintain in effect all provisions of theCommission-approved physical security, training and qualification, and safeguardscontingency plans, including amendments made pursuant to provisions of theMiscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55(51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, areentitled: "Physical Security Plan, Revision 5," and "Safeguards Contingency Plan,Revision 4," submitted by letter dated May 16, 2006, and "Guard Training andQualification Plan, Revision 0," submitted by letter dated September 30, 2004, assupplemented by letter dated October 20, 2004, and September 29, 2005.Amendment No. 164, 212Revised by letter dated March 27, 2007Revised by letter dated August 23, 2007