ENS 40452
ENS Event | |
---|---|
06:20 Jan 16, 2004 | |
Title | Technical Specification Required Shutdown Due to Both Trains of Safety Injection Declared Inoperable |
Event Description | The following information was obtained from the licensee via facsimile:
Inspections of the 'A' SI [Safety Injection] Pump lube oil cooler today per PMP [Plant Maintenance Procedure] 33-01 revealed silt and lake weed accumulation at tube pass inlets. Calculation C11423 Rev. 0, Addendum A was recently performed to determine service water flow and temperature requirements for the safety injection pump lube oil coolers. The calculation provides the required service water flow rate based on number of tubes blocked and SW [Service Water] temperature. At 1640 [hrs][CST], 1/15/04, it was reported that a visual inspection was performed on the 'A' SI Pump HX [Heat Exchanger] tube inlet and 17 of 20 tubes were found to be blocked. The flow for the 'A' HX was 3 - 3.8 gpm and after cleaning elevated to 5.95 - 6.05 gpm. This concern prompted an investigation into 'B' SI Pump HX and a flow test was performed at 1951 [hrs] on 1/15/04. The results from this test was no flow from 17 of the 20 tubes as seen from the outlet of the HX and a similar flow rate as seen in HX 'A'. The determination was made that this had potentially made both trains of SI Pump HX inoperable and that this needed to be reported under GNP 11.08.04 -'Reportability Determinations'. The Calculation (C11423) used data that was contradictory to current Surveillance Procedure acceptance criteria and used values that may not be indicative of post accident conditions. In a teleconference with Senior Plant Management, it was determined that future operability of the SI Pump lube oil HX cannot be verified and that both trains would be declared inoperable at time 0020 [hrs] [on] 1/16/04. This is in contradiction with the plant Technical Specification,3.3.b Emergency Core Cooling, and placed the plant in the standard shutdown sequence. The plant shutdown will commence at 0120 hrs CST. The NRC Resident Inspector has been notified by the licensee. |
Where | |
---|---|
Kewaunee Wisconsin (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+-4.32 h-0.18 days <br />-0.0257 weeks <br />-0.00592 months <br />) | |
Opened: | James Baptist 02:01 Jan 16, 2004 |
NRC Officer: | Howie Crouch |
Last Updated: | Jan 16, 2004 |
40452 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40452\u003C/a\u003E - \u003Ca href=\"/Kewaunee\" title=\"Kewaunee\"\u003EKewaunee\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETechnical Specification Required Shutdown Due to Both Trains of Safety Injection Declared Inoperable\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40452 - Kewaunee\n","link":"","lat":44.342975,"lon":-87.53713055555555,"icon":"/w/images/b/b0/Dominion_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |