TAC:62981
From kanterella
Request for: Approved, Closed | |
Initiation
Results Other: ML20135D986, ML20207R745, ML20210D696, ML20210T949, ML20210T980, ML20210U020, ML20210U168, ML20211G851, ML20214W928, ML20214W946, ML20215C373, ML20215C402, ML20215C422 | |
From | |
MONTHYEARML20210U1681984-04-0404 April 1984
[table view]Changes 0 to 0 of PT/0/A/4150/11A, Control Rod Worth Measurement:Rod Swap ML20210T9801984-04-26026 April 1984 Changes 0 to 3 of PT/0/A/4150/11, Control Rod Worth Measurement ML20215C4021985-08-28028 August 1985 Forwards DPC-NE-1003, Rod Swap Methodology Rept for Startup Physics Testing ML20215C4221985-08-31031 August 1985 Rod Swap Methodology Rept for Startup Physics Testing ML20135D9861985-09-10010 September 1985 Forwards Summary of Review Criteria Evaluations,Per WCAP-9863-A, Rod Bank Worth Measurement Utilizing Bank Exchange & Ser.On 850626,measured 12.5% Below Predicted Value.No Safety Analysis Input Assumptions Effected ML20210D6961986-09-15015 September 1986 Informs of Results of Cycle 3 Startup Physics Tests Conducted Using Method Described in, Rod Bank Worth Measurement Utilizing Bank Exchange. Ref Bank,Shutdown C, Worth Measured 14% Below Predicted Value ML20215C3731986-10-0101 October 1986 Forwards Forwarding Rept Re Rod Swap Methodology, Which Was Never Docketed.Info Not Revised in Any Way, Submitted for Docketing Purposes Only ML20214W9281986-12-0404 December 1986 Forwards Rev 1 to DPC-NE-1003, Rod Swap Methodology Rept for Startup Physics Testing ML20214W9461986-12-31031 December 1986 Rev 1 to DPC-NE-1003, Rod Swap Methodology Rept for Startup Physics Testing ML20207N2931987-01-12012 January 1987 Forwards Request for Addl Info to Complete Review of DPC-NE-1103, Rod Swap Methodology Rept for Startup Physics Testing. Info Required within 30 Days to Meet Review Completion Prior to Approval of Plant Reloads ML20213A5551987-01-28028 January 1987 Requests Remittance of Application Fee for Review of Rod Swap Methodology Rept for Startup Physics Testing ML20210U0201987-01-29029 January 1987 Changes 0 to 5 of PT/0/A/4150/11A, Control Rod Worth Measurement:Rod Swap ML20210T9491987-01-29029 January 1987 Changes 0 to 31 of PT/0/A/4150/21, Post-Refueling Controlling Procedure for Criticality,Zero Power Physics & Power Escalation Testing ML20210T8691987-02-11011 February 1987 Forwards Response to NRC 870112 Request for Addl Info Re Determination of Rod Worth Using Rod Swap Methodology. Methodology Described in 861204 Submittal Will Be Used for 870501 Reloads of Plants ML20211G8511987-02-16016 February 1987 Comments on D Hood Re 14.5% Discrepancy Between Predicted & Measured Worths of Ref Bank of Unit 2,Cycle 3. Caused by Shortcomings in Measurement Technique.Procedure Used to Measure Rod Worths Will Be Revised ML20207R7451987-03-11011 March 1987 Forwards Revised Responses to Questions 6 & 7 Re Determination of Rod Worth Using Rod Swap Methodology,Per Ds Hood 870112 Request & 870219 & 0310 Telcons Between Ds Hood & SA Gewehr ML20214M3101987-05-22022 May 1987 Forwards SER Based on Review of Rod Swap Methodology Rept for Startup Physics Testing & 870211 & 0311 Supplemental Info.Rod Swap Methodology Acceptable for Rod Worth Measurement of Reload Cores for Plants ML20214M3361987-05-22022 May 1987 Safety Evaluation Supporting Util Rept Entitled, Rod Swap Methodology Rept for Startup Physics Testing 1986-12-04 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:62981&oldid=3306427"