MONTHYEARML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24045A2892024-02-14014 February 2024 R. E. Ginna Nuclear Power Plant Acceptance Review: IST Relief Request for B Auxiliary Feedwater Pump ML23073A3682023-03-16016 March 2023 Authorization and Safety Evaluation for Proposed Alternative I6R-10, Revision 0 Related to the Steam Generators, RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.2022-09-20020 September 2022 Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. ML21250A3822021-09-29029 September 2021 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request I6R-06 Alternate Inspection for Reactor Vessel Internals ML21246A1062021-09-22022 September 2021 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Alternative Request GR-03, Valve Position Verification Testing Extension Sixth 10-Year Inservice Testing Program Interval ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21117A0312021-04-26026 April 2021 Verbal Authorization by the NRC NRR for 10 CFR 50.55a Alternative Request Position Verification Testing Extension - Exelon Generation, R. E. Ginna Nuclear Power Plant ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information ML20090D2912020-06-0202 June 2020 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-02 for the Sixth 10-Year Inservice Inspection Interval (EPID L-2019-LLR-0071). Supersedes ML20056D559 ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations ML20055F8862020-03-13013 March 2020 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-01 for the Sixth 10-Year Inservice Inspection Interval RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)2020-02-28028 February 2020 Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19205A4532019-08-0505 August 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternatives PR-01 and PR-02 for Sixth 10-Year Inservice Testing Program ML19205A3532019-08-0505 August 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternatives GR-01, VR-01, and VR-02 for the Sixth 10-Year Inservice Testing Program (EPID L-2018-LLR-0382; EPID L-2018-LLR-0383) ML19177A2182019-06-26026 June 2019 R. E. Ginna Nuclear Power Plant - Relief Request Associated with Snubber Inservice Testing Program for the Sixth Ten-Year Interval ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19100A0042019-04-22022 April 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request ISI-18 Regarding Fifth 10-Year Inservice Inspection Program Interval JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds ML18347B0362018-12-13013 December 2018 Relief Requests Associated with Sixth Ten-Year Lnservice Testing Interval JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 ML17297A5242017-11-0606 November 2017 R. E. Ginna - Request for Use of a Portion of a Later Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (CAC Nos. MG0079-MG0083; EPID L-2017-LLR-0061) ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML16138A0212016-05-19019 May 2016 Proposed Alternative to Use Code Case N-789 (CAC Nos. MF7018-MF7022) ML12264A5912012-09-18018 September 2012 Supplemental Information for Relief Request Number ISI-09 R. E. Ginna Nuclear Power Plant - Fifth Interval Inservice Inspection Program Proposed Alternative in Accordance with 10 CFR 50.55a (a)(3)(ii) Component Cooling Water 1 Inch Half-Cou ML12254A3782012-09-0606 September 2012 Relief Request Number ISI-09 - Fifth Interval Inservice Inspection Program Proposed Alternative in Accordance with 10 CFR 50.55a (a)(3)(ii) Component Cooling Water 1 Inch Half-Coupling Weld Leak ML12158A1152012-06-22022 June 2012 Inservice Inspections Program Relief Request Nos. ISI-02 and ISI-03 ML0920802292009-07-31031 July 2009 R. E. Ginna, Safety Evaluation for Relief Request No. 18, Reactor Vessel Weld Examination Extension ML0909000452009-04-0505 April 2009 Relief Request No. 23 on End-of-Interval System Pressure Test for Class 1 Components-R.E. Ginna Nuclear Power Plant ML0903501872009-02-0404 February 2009 Acceptance Review for Ginna Relief Request No. 23 ML0828800322008-10-0303 October 2008 Fourth Ten-Year Interval Inservice Inspection Program, Re-submittal of Relief Request Number 18 ML0617401562006-07-19019 July 2006 Relief Request No. PR-3 Regarding Testing of Auxiliary Feedwater Pumps ML0612805002006-05-0101 May 2006 R. E. Ginna Response to Request for Additional Information Regarding Relief Request PR-3 ML0507300162005-04-12012 April 2005 R. E. Ginna, Relief, Request 17 for the Fourth 10-Year Interval of the Inservice Inspection Program, MC5406 ML0435601532004-12-15015 December 2004 Fourth Ten-Year Interval in Service Inspection Program Submittal of Relief Request Number 17 Related to Appendix Viii, Supplement 10, PDI Program Alternative Requirements R. E. Ginna Nuclear Power Plant ML0424507782004-10-19019 October 2004 R. E. Ginna Nuclear Power Plant Relief Requests VR-1, VR-2 and VR-13 for the Fourth 10-Year Interval of the Pump and Valve Inservice Testing Program ML0330401202003-11-21021 November 2003 R. E. Ginna Nuclear Power Plant, Relief Request Review, Inservice Testing Program Relief Requests VR-4 and VR-8 ML0329603222003-10-20020 October 2003 Submittal of Relief Request VR-4 Related to the Requirements of 10CFR50.55a(f), Inservice Testing Requirements. ML0304202642003-02-10010 February 2003 R. E. Ginna Nuclear Power Plant, Relief, Inservice Testing Program Relief Request PR-2, MB7232 ML0314205202003-01-0909 January 2003 Enclosure - R.E. Ginna, Inservice Testing Program Relief Request PR-2 2024-07-23
[Table view] |
Text
ROCHESTER GAS & ELECTRIC CORPORATION R. E. Ginna Station, Fourth Interval Inservice Testing Program RELIEF REQUEST PR-2 SYSTEM: Various COMPONENT: All IST Pumps CATEGORY: Various SAFETY CLASS: Various FUNCTION: Various TEST REQUIREMENT: OMa-1988, Part 6, paragraph 6.1 states that if deviations fall within the alert range of Table 3, the frequency of testing specified in paragraph 5.1 shall be doubled until the cause of the deviation is determined and the condition corrected. If deviations fall within the required action range of Table 3, the pump shall be declared inoperable until the cause of the deviation has been determined and the condition corrected.
BASIS FOR RELIEF: Rochester Gas & Electric (RG&E) submits this relief request for Nuclear Regulatory Commission (NRC) review and approval in accordance with 10CFR50.55a (a)(3)(ii).
Compliance with the specified requirement results in hardship or unusual difficulty without a compensating increase in the level of quality and safety. It is an unnecessary hardship to continue to test a pump on increased frequency or to perform unnecessary maintenance on a pump to satisfy the requirements of OMa-1988, Part 6 should it be clear that the pump is operating acceptably. In such instances, the unnecessary increased testing or maintenance reduces system availability and increases entry into Technical Specification Limiting Conditions for Operation. Such action is not consistent with availability goals established in accordance with 10 CFR 50.65, 'Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants". Further, repairing a pump that is operating acceptably and within prescribed design parameters does not provide a compensating increase in the level of quality and safety.
OMa-1988, Part 6, paragraph 6.1 does not specifically state it is permissible to analyze pumps that have entered the alert or required action ranges. The 1998 Edition, 2000 Addenda of the OM-Code, paragraph ISTB-6200(c) provides a means to analyze, and if justified, establish new references values for pump testing at the changed values. This was incorporated by reference in 10 CFR 50.55a with an amendment to that regulation effective October 28, 2002. Per 10 CFR 50.55a(f)(4)(iv), "Inservice tests of pumps and valves may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (b) of this section, subject to the limitations and modifications listed in paragraph (b) of this section, and subject to Commission approval. Portions of editions or addenda may be used provided that all related requirements of the respective editions or addenda are met."
ALTERNATE TESTING: RG&E proposes to incorporate paragraph ISTB 6200(c), "New Reference Values" into the Ginna Station fourth interval IST program as an addition to the requirements of OMa-1988, part 6, paragraph 6.1. This will facilitate analysis of a pump whose test parameters are within either the alert or required action range of Table 3 of OMa-1988, Part 6, for the purpose of establishing new reference values. References to Table ISTB-5 100- 1, Table ISTB-5200-1, Table ISTB-5300-1, and Table ISTB-5300-2 shall be understood to refer to the Ranges and Test Parameters in OMa-1988, Part 6, Table 3. RG&E will continue to test the pumps at the frequency specified in OMa-1988, paragraph 5.1 "Frequency of Inservice Tests."
The analysis performed per ISTB 6200(c) shall include verification of the pump's operational readiness. This paragraph also requires that the analysis shall include both a pump and system level evaluation of operational readiness, the cause of the change in pump performance, and an evaluation of all trends indicated by available data. The results of the analysis shall be documented in the Record of Tests as specified in paragraph 7.3 of OMa- 1988, Part 6.
List of Regulatory Commitments The following table identifies those actions committed to by Rochester Gas & Electric in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments. Please direct questions regarding these commitments to Mr. Tom Harding, 585-771-3384.
REGULATORY COMMITMENT I DUE DATE None N/A
+