E-mail Scarbrough, NRR, to Ennis, NRR, VY EPU Steam Dryer Audit
ML052220551
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 08/09/2005
From: Thomas Scarbrough
Office of Nuclear Reactor Regulation
To: Richard Ennis
Office of Nuclear Reactor Regulation
References
Download: ML052220551 (3)


Text

I Rick Ennis - Audit of Vermont Yankee Steam Dryer Analy!Ms(August 22-25) _ai Page .I 1i ..

.. Eni ..Aui of Vemn Yanke St.

Ric Drye An..i (Ags .225 .. ... .. . .... ..... . ... . . . . . _ . ,

From: Thomas Scarbrough To: Rick Ennis Date: 8/9/05 4:07PM

Subject:

Audit of Vermont Yankee Steam Dryer Analysis (August 22-25)

Rick, As we discussed, Brian Hobbs of Entergy called today to confirm the planned audit on August 22 to 25 of the Vermont Yankee steam dryer analysis at the GE office at 1299 Pennsylvania, Ave, NW, Suite 1100 West, in Washington, DC.

The audit will begin at 1 pm on August 22 at the GE office, and end by noon on August 25.

The tentative agenda is as follows:

August 22/23: Load definition and uncertainty analysis, and scale model issues August 24: CFD analysis August 25: Remaining items and exit meeting We might conduct parallel audit discussions if more efficient.

In response to my question, Brian Hobbs said he would check on the status of Entergy's response to NRC Engineering Inspection Report 2004008, dated December 2, 2004, with respect to closing out the MOV program issues.

NRC staff and contractors who might participate at all or a portion of the Vermont Yankee steam dryer audit include:

NRC Eugene Imbro, Kamal Manoly, Thomas Scarbrough, Cheng-lh Wu, Patrick Sekerak, Christopher Boyd, David Terao, Thomas Alexion, Andrey Turilin, and Rick Ennis NRC contractors Argonne National Laboratory: Vik Shah, Steve Hambric (subcontractor from Penn State) and, by teleconference, Thomas Mulcahy McMaster University: Dr. Samir Ziada Thanks.

Tom CC: Andrey Turilin; Cheng-lh Wu; Christopher Boyd; David Terao; Gene Imbro; Kamal Manoly; S. Patrick Sekerak; Thomas Alexion

I cAtemP\GW)00001.TMP Page 1 !I.

. ...temp\GW...QOOO... TMP

... . . . . . . . . . . . . . . Page..........

Mail Envelope Properties (42F90CF5.A99: 13: 49504)

Subject:

Audit of Vermont Yankee Steam Dryer Analysis (August 22-25)

Creation Date: 8/9/05 4:07PM From: Thomas Scarbrough Created By: TGS(nrc.gov Recipients OWGWPO02.HQGWDOO l EXI CC (Gene Imbro)

TWGWPOO2.HQGWDOO 1 AXT3 CC (Andrey Turilin)

DXT CC (David Terao) owf4_po.OWFNDO PXS 1 CC (S. Patrick Sekerak)

RXE (Rick Ennis)

TWA CC (Thomas Alexion) twvf5po.TWFNDO CXB5 CC (Christopher Boyd) nrc.gov owvf2_po.OWFNDO CIWI CC (Cheng-Ih Wu)

KAM CC (Kamal Manoly)