Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML21146A0182021-06-0808 June 2021 Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML21040A2922021-03-0404 March 2021 Issuance of Amendments Adoption of TSTF 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21019A2192021-02-24024 February 2021 Issuance of Amendment No. 227 Extension of Appendix J Integrated Leakage Test Interval ML21011A0682021-02-0202 February 2021 Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20101G0542020-04-15015 April 2020 Issuance of Amendment No. 224 One Cycle Extension of Appendix J Integrated Leakage Test and Drywell Bypass Test Interval (Exigent Circumstances) ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19123A0142019-06-18018 June 2019 Issuance of Amendment No. 220, Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML19094A7992019-06-11011 June 2019 Issuance of Amendment No. 219 to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-425, Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5B ML19084A2182019-05-23023 May 2019 Issuance of Amendment No. 218 to Revise Technical Specification to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control ML19025A0232019-03-12012 March 2019 Issuance of Amendment No. 216 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML18215A1962019-03-12012 March 2019 Issuance of Amendment No. 217 to Modify the Updated Safety Analysis Report to Replace Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals ML18306A5132018-11-30030 November 2018 Issuance of Conforming Amendment Nos. 262, 312 and 215 Transfers of Renewed Facility Operating Licenses ML17240A2322017-10-0404 October 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 213 for Administrative Name Change to Licensee South Mississippi Electric Power Association (CAC No. MF9588) ML17116A0322017-06-0707 June 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 212 to Adopt Technical Specifications Task Force-427, Allowance For Non-Technical Specification Barrier Degradation on Supported System Operability (CAC No. MF8692.) ML16243A0242016-12-0808 December 2016 Record of Decision - License Renewal Application for Grand Gulf Nuclear Station, Unit 1 ML16292A4622016-12-0101 December 2016 Renewed Facility Operating License for Grand Gulf Nuclear Station, Unit 1 ML16140A1332016-08-0404 August 2016 Issuance of Amendment Revision of Technical Specifications to Remove Inservice Testing Program and Clarify Surveillance Requirement Usage Rule Application ML16132A1942016-05-26026 May 2016 Correction to Amendment No. 207, Request for Changing Five Technical Specifications Allowable Levels ML16119A1482016-05-25025 May 2016 Issuance of Amendment No. 210 Re. Cyber Security Plan Milestone 8 Full Implementation Schedule ML16011A2472016-02-17017 February 2016 Issuance of Amendment No. 209 Revision of Technical Specifications for Containment Leak Rate Testing ML15336A2562015-12-17017 December 2015 Issuance of Amendment No. 208 Adoption of Technical Specification Task Force Traveler TSTF-522 ML15229A2192015-08-31031 August 2015 Redacted, Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus License Amendment Request ML15195A3552015-08-31031 August 2015 Issuance of Amendment Request for Changing Five Technical Specifications Allowable Values ML15180A1702015-08-31031 August 2015 Issuance of Amendment Revision to Technical Specification 5.65.B to Add Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density ML15229A2132015-08-18018 August 2015 Redacted, Issuance of Amendment Regarding Technical Specification 2.1.1.2 of Technical Specification Section 2.1.1.2, Reactor SLs (Safety Limits) ML15229A2182015-08-18018 August 2015 Redacted, Issuance of Amendment Adoption of Single Fluence Methodology ML15104A6232015-05-12012 May 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Standard Technical Specifications Change Traveler TSTF-523 ML14311A4792014-12-12012 December 2014 Issuance of Amendment No. 200, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date ML14162A3782014-09-25025 September 2014 Redacted, Issuance of Amendment No. 199, Delete Operating License Condition 2.C(32), Partial Feedwater Heating, to Allow Plant to Operate with Final Feedwater Temperature Reduction at End of Fuel Cycle ML14106A1332014-06-30030 June 2014 Issuance of Amendment No. 198, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, as Part of Consolidated Line Item Improvement Process ML13343A1092013-12-26026 December 2013 Issuance of Amendment No. 197, Revise Technical Specifications and Surveillance Requirements to Support Operation with 24-Month Fuel Cycle in Accordance with Generic Letter 91-04 ML13261A3492013-09-25025 September 2013 Issuance of Amendment No. 196, Modify Updated Final Safety Analysis Report to Revise the Methodology for Standby Service Water Passive Failure ML13261A2642013-09-25025 September 2013 Redacted Version, Issuance of Amendment No. 195, Revise Criticality Safety Analysis and Technical Specification 4.3.1, Criticality, and Delete Spent Fuel Pool Loading Criteria License Condition ML13157A0292013-08-0505 August 2013 Issuance of Amendment No. 194, Revise TS Table 3.3.6.1-1 to Support Correction of Non-Conservative Allowable Value for Primary Containment and Drywell Isolation Instrumentation ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML12240A2392012-12-0505 December 2012 Issuance of Amendment No. 192, Revise Physical Protection License Condition Related to Milestone 6 of the Cyber Security Plan Implementation ML1208601492012-05-11011 May 2012 Issuance of Amendment No. 190, Revise Technical Specification 3.1.7, Standby Liquid Control (SLC) System, to Support Use of Sodium Pentaborate Solution Enriched with Boron-10 Isotope ML1207202832012-04-20020 April 2012 Issuance of Amendment No. 189, Revise Minimum Critical Power Ratio Safety Limit in Technical Specification 2.1.1.2 for Two-Loop and Single Recirculation Loop ML1117306812011-09-12012 September 2011 Issuance of Amendment No. 187, Revise Technical Specifications to Adopt TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML1119401652011-07-27027 July 2011 Issuance of Amendment No. 186, Revise License Condition and Approval of Cyber Security Plan and Associated Implementation Schedule ML1107304022011-04-27027 April 2011 Issuance of Amendment No. 185, Revise Surveillance Requirement Notes in Technical Specifications Associated with Condensate Storage Tank Level-Low as Reflected in TSTF-493 ML0909804292009-04-13013 April 2009 Correction to Amendment No. 182, Surveillance Requirements for Diesel Generator Slow - Start Testing (MD9641) 2024-08-13
[Table view] |