MONTHYEARML17265A6921999-06-28028 June 1999 Application for Amend to License DPR-18 to Revise ITS Associated with RCS Leakage Detection Instrumentation.Lar Proposed as Result of Commitment That Rg&E Submit as Part of Staff Review of Application of leak-before-break Status ML17265A5691999-03-0101 March 1999 Application for Amend to License DPR-18,proposing Change in ITS to Revise Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A4651998-11-24024 November 1998 Application for Amend to License DPR-18,revising Improved Tech Spec Description of Fuel Cladding Matl (TS 4.2.1) & Updating References Provided in TS 5.6.5 for COLR ML17265A2431998-04-27027 April 1998 Application for Amend to License DPR-18,revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17264B0431997-09-29029 September 1997 Application for Amend to License DPR-18,revising Administrative Controls W/Respect to RCS Pressure & Temp Limits Rept ML17264B0381997-09-29029 September 1997 Application for Amend to License DPR-18,revising TS Re Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Revised Setpoint Analysis ML17264B0021997-08-19019 August 1997 Application for Amend to License DPR-18,allowing Testing of Certain ECCS motor-operated Valves in Mode 4 Which Currently Requires Entry in LCO 3.0.3 ML17264A9981997-08-19019 August 1997 Application for Amend to License DPR-18,correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264A8661997-04-24024 April 1997 Application for Amend to License DPR-18,revising RCP PT & Administrative Control Requirements ML17264A8471997-03-31031 March 1997 Application for Amend to License DPR-18,revising Spent Fuel Pool Storage Requirements ML20134D9911996-10-29029 October 1996 Application for Amend to License DPR-18,requesting Change to Mode of Applicability for Auxiliary Feedwater Pump Actuation on Main Feedwater Pump ML17264A7121996-10-29029 October 1996 Application for Amend to License DPR-18 Requesting Change to Required Actions for Inoperable Channels Associated with Auxiliary Feedwater Pump ML17264A5991996-09-13013 September 1996 Application for Amend to License DPR-18,revising RCS Pressure & Temp Limits Rept ML17264A4701996-05-0808 May 1996 Application for Amend to License DPR-18,correcting Typos ML17264A4041996-03-15015 March 1996 Application for Amend to License DPR-18,revising TS to Incorporate Methodology for Determining RCS P/T Limits & LTOP Limits in Administrative Controls Section of RCS P/T Limits Rept ML17264A3441996-02-0909 February 1996 Application for Amend to License DPR-18,revising TS Table 3.3.2-1,Function 5b, Feedwater Isolation,Sg Water Level - High to Raise Allowable Value & Trip Setpoint ML17264A3381996-02-0909 February 1996 Application for Amend to License DPR-18,revising TS to Incorporate Ref to Methodology for Determining LTOP Limits Into Administrative Controls Section for RCS PT Limits Rept ML17264A3331996-02-0909 February 1996 Application for Amend to License DPR-18,revising Requirements for Containment Closure During Mode 6 to Allow Use of Installed Overhead Door Assembly to Isolate Equipment Hatch Opening ML17264A3221996-01-26026 January 1996 Application for Amend to License DPR-18,incorporating Changes Necessary to Reflect Revised Nuclear Fuel Loading ML17264A2521995-11-27027 November 1995 Application for Amend to License DPR-18,revising TS to Implement 10CFR50,App J,Option B ML17264A2551995-11-20020 November 1995 Application for Amend to License DPR-18,submitting Changes to TS Instrumentation Requirements & Conversion to Improved TS ML17264A1501995-08-31031 August 1995 Application for Amend to License DPR-18,proposing Ts,By Implementing WCAP-10271,its Assoc Suppls & Other Re Changes W/Respect to RTS & ESFAS ML17263B0671995-05-26026 May 1995 Application for Amend to License DPR-18,revising TSs in Entirety to Convert to Improved TSs ML17263A9771995-03-13013 March 1995 Application for Amend to License DPR-18,to Revise TS 4.4.2.4.a to Replace Specific Leakage Testing Frequencies for Containment Isolation Valves ML17309A5501994-07-15015 July 1994 Application for Amend to License DPR-18,proposing TS 3.5, Providing NRC W/Opportunity to Communicate at Early Stage Any Concerns W/Respect to Differences from NUREG-1431 ML17263A7141994-06-24024 June 1994 Application for Amend to License DPR-18,re Upgrading of Administrative Controls Section 6 ML17263A7071994-06-15015 June 1994 Notarized Application for Amend to License DPR-18 Re Reactor Coolant Activity ML17263A6551994-05-23023 May 1994 Application for Amend to License DPR-18,increasing Allowable Reactor Coolant Activity Levels to Improved TS (NUREG-1431) ML17263A6411994-05-13013 May 1994 Application for Amend to License DPR-18,revising TS Administrative Controls Section 6.0 Consistent W/Improved TS ML17263A3181993-07-13013 July 1993 Application for Amend to License Revisions for License DPR-18 Re Removing Containment Isolation Valve Table 3.6-1 from TS ML17263A2081993-04-0505 April 1993 Application for Amend to License DPR-18,revising TS to Remove Containment Isolation Valve Table 3.6-1 & Maintain Required Listing in Updated FSAR ML17262B1171992-12-17017 December 1992 Application for Amend to License DPR-19,revising TS Sections 3.2 & 3.3 to Eliminate Use of High Concentration Boric Acid as safety-related Source of SI Pumps & Increasing Allowable Outage Times ML17262B0991992-11-30030 November 1992 Application for Amend to License DPR-18,revising TS to Remove Table of Containment Isolation Valves & Provide Ref in Bases to UFSAR ML17262B0571992-10-0808 October 1992 Corrected Application for Amend to License DPR-18,adding Addl Requirements to Auxiliary Electrical Sys TS & Action Statements for Instrument Bus Sys,Consisting of Notarized Page Two ML17262B0431992-10-0808 October 1992 Application for Amend to License DPR-18,adding Addl Requirements to Auxiliary Electrical Sys TS & Action Statements for Instrument Bus Sys,Per Guidance Provided in GL 91-11 Re Resolution of GI 48 ML17262B0201992-09-15015 September 1992 Application for Amend to License DPR-18,revising TS Sections 3.1.1.4,3.1.1.6,4.3.4 & Adding site-specific Basis Sections to Address GL 90-06 Re Resolution of Generic Issues 70 & 94 ML17262A9121992-06-22022 June 1992 Application for Amend to License DPR-18,revising TS 4.3.1 Per Guidance Provided in Generic Ltr 91-01, Removal of Schedule for Withdrawal of Reactor Vessel Matl Specimens from Ts. ML17262A8311992-04-23023 April 1992 Application for Amend to License DPR-18,changing TSs to Redefine Snubber Visual Insp Schedule,Per Generic Ltr 90-09 Guidance ML17262A8211992-04-21021 April 1992 Application for Amend to License DPR-18,instituting Std License Condition for Fire Protection Program & Removing Requirements for Fire Protection Sys from Tss,Per Guidance in Generic Ltrs 86-10 & 88-12 ML17262A7861992-03-23023 March 1992 Application for Amend to License DPR-18,revising Tech Spec Section 6.5.1, Plant Operations Review Committee Function. ML17262A7801992-03-20020 March 1992 Application for Amend to License DPR-18,revising TS 5.1 Figure 5.1-1 to Describe Rather than Depict Site Area Boundary to Evaluate Radiological Releases to Unrestricted Area ML17262A7901992-03-20020 March 1992 Application for Amend to License DPR-18,revising Tech Specs 6.9.1.2 & 6.9.2.5 ML17262A6321991-10-25025 October 1991 Application for Amend to License DPR-18 to Delete TS 5.1 & Figure 5.1-1 ML17262A5331991-06-20020 June 1991 Application for Amend to License DPR-18,to Incorporate Changes to Specifications & Action Statements for Offsite & Onsite Power Sources Available for Operation of Plant Auxiliaries ML17262A4121991-03-0808 March 1991 Application for Amend to License DPR-18,removing Table 3.6-1 Re Containment Isolation Valves from Tech Specs ML17262A3831991-02-15015 February 1991 Application for Amend to License DPR-18,revising Tech Specs to Modify Method of Locking Open Motor Operated Valve 856, Refueling Water Storage Tank Delivery Valve When Reactor Coolant Sys at or Above 350 F ML17262A3751991-02-15015 February 1991 Application for Amend to License DPR-18,revising Heatup/Cooldown Curves & Associated Low Temp Overpressure Protection Setpoint to Implement Reg Guide 1.99,Rev 2 Methodology ML17262A3721991-02-15015 February 1991 Application for Amend to License DPR-18,providing Clarification of Which QA Activities Subj to Audit Considerations & Changing Audit Frequency Described in Tech Spec 6.5.2.8d ML17262A3871991-02-15015 February 1991 Application for Amend to License DPR-18,revising Tech Spec Tables 3.5-5 & 4.1-5 Based on Mods to Radiation Monitoring Sys ML17262A2951991-01-14014 January 1991 Application for Amend to License DPR-18,changing Tech Specs to Limit Containment Internal Pressure to 1 Psig Vs 6 Psig Per Initial Condition Assumptions in Containment Integrity Analysis 1999-06-28
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17265A6921999-06-28028 June 1999 Application for Amend to License DPR-18 to Revise ITS Associated with RCS Leakage Detection Instrumentation.Lar Proposed as Result of Commitment That Rg&E Submit as Part of Staff Review of Application of leak-before-break Status ML17265A5691999-03-0101 March 1999 Application for Amend to License DPR-18,proposing Change in ITS to Revise Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A4651998-11-24024 November 1998 Application for Amend to License DPR-18,revising Improved Tech Spec Description of Fuel Cladding Matl (TS 4.2.1) & Updating References Provided in TS 5.6.5 for COLR ML17265A2431998-04-27027 April 1998 Application for Amend to License DPR-18,revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17264B0431997-09-29029 September 1997 Application for Amend to License DPR-18,revising Administrative Controls W/Respect to RCS Pressure & Temp Limits Rept ML17264B0381997-09-29029 September 1997 Application for Amend to License DPR-18,revising TS Re Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Revised Setpoint Analysis ML17264B0021997-08-19019 August 1997 Application for Amend to License DPR-18,allowing Testing of Certain ECCS motor-operated Valves in Mode 4 Which Currently Requires Entry in LCO 3.0.3 ML17264A9981997-08-19019 August 1997 Application for Amend to License DPR-18,correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264A8661997-04-24024 April 1997 Application for Amend to License DPR-18,revising RCP PT & Administrative Control Requirements ML17264A8471997-03-31031 March 1997 Application for Amend to License DPR-18,revising Spent Fuel Pool Storage Requirements ML20134D9911996-10-29029 October 1996 Application for Amend to License DPR-18,requesting Change to Mode of Applicability for Auxiliary Feedwater Pump Actuation on Main Feedwater Pump ML17264A7121996-10-29029 October 1996 Application for Amend to License DPR-18 Requesting Change to Required Actions for Inoperable Channels Associated with Auxiliary Feedwater Pump ML17264A5991996-09-13013 September 1996 Application for Amend to License DPR-18,revising RCS Pressure & Temp Limits Rept ML17264A4701996-05-0808 May 1996 Application for Amend to License DPR-18,correcting Typos ML17264A4041996-03-15015 March 1996 Application for Amend to License DPR-18,revising TS to Incorporate Methodology for Determining RCS P/T Limits & LTOP Limits in Administrative Controls Section of RCS P/T Limits Rept ML17264A3441996-02-0909 February 1996 Application for Amend to License DPR-18,revising TS Table 3.3.2-1,Function 5b, Feedwater Isolation,Sg Water Level - High to Raise Allowable Value & Trip Setpoint ML17264A3381996-02-0909 February 1996 Application for Amend to License DPR-18,revising TS to Incorporate Ref to Methodology for Determining LTOP Limits Into Administrative Controls Section for RCS PT Limits Rept ML17264A3331996-02-0909 February 1996 Application for Amend to License DPR-18,revising Requirements for Containment Closure During Mode 6 to Allow Use of Installed Overhead Door Assembly to Isolate Equipment Hatch Opening ML17264A3221996-01-26026 January 1996 Application for Amend to License DPR-18,incorporating Changes Necessary to Reflect Revised Nuclear Fuel Loading ML17264A2521995-11-27027 November 1995 Application for Amend to License DPR-18,revising TS to Implement 10CFR50,App J,Option B ML17264A2551995-11-20020 November 1995 Application for Amend to License DPR-18,submitting Changes to TS Instrumentation Requirements & Conversion to Improved TS ML17264A1501995-08-31031 August 1995 Application for Amend to License DPR-18,proposing Ts,By Implementing WCAP-10271,its Assoc Suppls & Other Re Changes W/Respect to RTS & ESFAS ML17263B0671995-05-26026 May 1995 Application for Amend to License DPR-18,revising TSs in Entirety to Convert to Improved TSs ML17263A9771995-03-13013 March 1995 Application for Amend to License DPR-18,to Revise TS 4.4.2.4.a to Replace Specific Leakage Testing Frequencies for Containment Isolation Valves ML17309A5501994-07-15015 July 1994 Application for Amend to License DPR-18,proposing TS 3.5, Providing NRC W/Opportunity to Communicate at Early Stage Any Concerns W/Respect to Differences from NUREG-1431 ML17263A7141994-06-24024 June 1994 Application for Amend to License DPR-18,re Upgrading of Administrative Controls Section 6 ML17263A7071994-06-15015 June 1994 Notarized Application for Amend to License DPR-18 Re Reactor Coolant Activity ML17263A6551994-05-23023 May 1994 Application for Amend to License DPR-18,increasing Allowable Reactor Coolant Activity Levels to Improved TS (NUREG-1431) ML17263A6411994-05-13013 May 1994 Application for Amend to License DPR-18,revising TS Administrative Controls Section 6.0 Consistent W/Improved TS ML17263A3181993-07-13013 July 1993 Application for Amend to License Revisions for License DPR-18 Re Removing Containment Isolation Valve Table 3.6-1 from TS ML17263A2081993-04-0505 April 1993 Application for Amend to License DPR-18,revising TS to Remove Containment Isolation Valve Table 3.6-1 & Maintain Required Listing in Updated FSAR ML17262B1171992-12-17017 December 1992 Application for Amend to License DPR-19,revising TS Sections 3.2 & 3.3 to Eliminate Use of High Concentration Boric Acid as safety-related Source of SI Pumps & Increasing Allowable Outage Times ML17262B0991992-11-30030 November 1992 Application for Amend to License DPR-18,revising TS to Remove Table of Containment Isolation Valves & Provide Ref in Bases to UFSAR ML17262B0571992-10-0808 October 1992 Corrected Application for Amend to License DPR-18,adding Addl Requirements to Auxiliary Electrical Sys TS & Action Statements for Instrument Bus Sys,Consisting of Notarized Page Two ML17262B0431992-10-0808 October 1992 Application for Amend to License DPR-18,adding Addl Requirements to Auxiliary Electrical Sys TS & Action Statements for Instrument Bus Sys,Per Guidance Provided in GL 91-11 Re Resolution of GI 48 ML17262B0201992-09-15015 September 1992 Application for Amend to License DPR-18,revising TS Sections 3.1.1.4,3.1.1.6,4.3.4 & Adding site-specific Basis Sections to Address GL 90-06 Re Resolution of Generic Issues 70 & 94 ML17262A9121992-06-22022 June 1992 Application for Amend to License DPR-18,revising TS 4.3.1 Per Guidance Provided in Generic Ltr 91-01, Removal of Schedule for Withdrawal of Reactor Vessel Matl Specimens from Ts. ML17262A8311992-04-23023 April 1992 Application for Amend to License DPR-18,changing TSs to Redefine Snubber Visual Insp Schedule,Per Generic Ltr 90-09 Guidance ML17262A8211992-04-21021 April 1992 Application for Amend to License DPR-18,instituting Std License Condition for Fire Protection Program & Removing Requirements for Fire Protection Sys from Tss,Per Guidance in Generic Ltrs 86-10 & 88-12 ML17262A7861992-03-23023 March 1992 Application for Amend to License DPR-18,revising Tech Spec Section 6.5.1, Plant Operations Review Committee Function. ML17262A7801992-03-20020 March 1992 Application for Amend to License DPR-18,revising TS 5.1 Figure 5.1-1 to Describe Rather than Depict Site Area Boundary to Evaluate Radiological Releases to Unrestricted Area ML17262A7901992-03-20020 March 1992 Application for Amend to License DPR-18,revising Tech Specs 6.9.1.2 & 6.9.2.5 ML17262A6321991-10-25025 October 1991 Application for Amend to License DPR-18 to Delete TS 5.1 & Figure 5.1-1 ML17262A5331991-06-20020 June 1991 Application for Amend to License DPR-18,to Incorporate Changes to Specifications & Action Statements for Offsite & Onsite Power Sources Available for Operation of Plant Auxiliaries ML17262A4121991-03-0808 March 1991 Application for Amend to License DPR-18,removing Table 3.6-1 Re Containment Isolation Valves from Tech Specs ML17262A3831991-02-15015 February 1991 Application for Amend to License DPR-18,revising Tech Specs to Modify Method of Locking Open Motor Operated Valve 856, Refueling Water Storage Tank Delivery Valve When Reactor Coolant Sys at or Above 350 F ML17262A3751991-02-15015 February 1991 Application for Amend to License DPR-18,revising Heatup/Cooldown Curves & Associated Low Temp Overpressure Protection Setpoint to Implement Reg Guide 1.99,Rev 2 Methodology ML17262A3721991-02-15015 February 1991 Application for Amend to License DPR-18,providing Clarification of Which QA Activities Subj to Audit Considerations & Changing Audit Frequency Described in Tech Spec 6.5.2.8d ML17262A3871991-02-15015 February 1991 Application for Amend to License DPR-18,revising Tech Spec Tables 3.5-5 & 4.1-5 Based on Mods to Radiation Monitoring Sys ML17262A2951991-01-14014 January 1991 Application for Amend to License DPR-18,changing Tech Specs to Limit Containment Internal Pressure to 1 Psig Vs 6 Psig Per Initial Condition Assumptions in Containment Integrity Analysis 1999-06-28
[Table view] |
Text
BEFORE THE UNXTED STATES NUCLEAR REGULATORY COMMISSSXON In the Matter of ROCHESTER GAS AND ELECTRIC CORPORATION Docket No.52-244 (R.E. Ginna Nuclear Power Station, Unit No. 1)
CERTIFICATE OF SERVICE I hereby certify that I have served a document entitled "Application for Amendment to Operating License" with three (3) documents, Attachments A, B, and C, attached thereto, by mailing copies thereof first class, postage pre-paid, to each, of the following persons this 3rd day of August, 1979:
Mr. Michael L. Slade 12 Trailwood Circle Rochester, New York 14618 Warren B. Rosenbaum, Esq.
One Main Street 707 Wilder Building Rochester, New York 14614 Edward G. Ketchen, Esp.
Office of the Executive Legal Director U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Robert N. Pickney Supervisor Town of Ontario 107 Ridge Road West Ontario, New York 14519 V 908080 Q/(p '-
Jeffrey L. Cohen, Esq.
New York State Energy Office Swan Street Building Core 1, Second Floor Empire State Plaza Albany, New York l2223 Edward Luton, Esq.
Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commis sion Washington, D.C. 20555 Dr. Emmeth A. Luebke Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commis sion Washington, D.C. 20555 Dr. Dixon Callihan Union Carbide Corporation P. O. Box Y Oak Ridge, Tennessee 37830 L x K. Larson LeBoeuf, Lamb, Leiby 6 MacRae Attorneys for Rochester Gas and Electric Corporation
II 'i f
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of , )
)
Rochester Gas and Electric Corporation ) Docket. No. 50-244 (R. E. Ginna Nuclear Power Plant, )
Unit No. l) )
APPLICATION FOR AMENDMENT TO OPERATING LICENSE
90% of normal indicated flow ~
- g. Low reactor coolant pump frequency - > 57.5 Hz.
2.3.1.3 Other reactor tri s
- a. High pressurizer water level < 92% of span
- b. Low-low steam generator water level > 5% of narrow range instrument span 2.3.2 Protective instrumentation settings for reactor trip inter-locks shall be as follows:
2.3.2.1 Remove bypass of "at power" reactor trips at high power (low pressurizer pressure and low reactor coolant flow) for both loops:
Power range nuclear flux < 8.'5% of rated power (1) (Note: During cold rod drop tests, the pressurizer high level trip may be bypassed.)
2.3.2.2 Remove bypass of single loss of flow trip at, high power:
Power range nuclear flux < 50% of rated power 2.3.3 Relay settings for 480 volt safeguards bus protection shall be as follows:
2.3.3.1 Loss of voltage relay operating time < 8.5 seconds for 480 volt safeguards bus voltages < 368 volts 2.3.3.2 Acceptable degraded voltage relay operating times and setpoints, for 480 volt safeguards bus voltages < 414 volts'and > 368 volts are defined by the safeguard equip-ment thermal capability curve shown in Figure 2.3-1.
Basis:
TTTe Eigh flux reactor trip (low set point) provides redundant pro-tection in the power range for a power excursion beginning fop low power. This trip value was used in the safety analysis.
- 2. 3-4 PROPOSED
e 0 the minimum DNB ratio increases at lower flow because the maximum enthalpy rise does not increase. For this reason the single pump loss of flow trip can be bypassed below 50%
power.
The loss of voltage and degraded voltage trips ensure opera-bility of safeguards equipment during a postulated design basis event concurrent with a degraded bus voltage condition. (9)(10)(11)
References:
(1) FSAR 14.1.1 (2) FSAR, Page 14-3 (3) FSAR 14.3.1 (4) FSAR 14.1.2 (5)FSAR72I 7~3 (6) FSAR 3. 2. 1 (7) FSAR 14.1.6 (8) FSAR 14.1.9 (9) Letter from L.D. White, Jr. to A. Schwencer, NRC, dated September 30, 1977 (10) Letter from L.D. White, Jr. to A. Schwencer, NRC, dated September 30 1977 (11) Letter from L.D. White, Jr. to D. Ziemann, NRC, dated July 24, 1978 2.3-8 PROPOSED
I 1600 I
- o. Second Level 0 I
~
I.
'Under Voltage Protection L I
1400 Figure 2.3-1 1200 ~ l
-+-'
1000 td I I'I "I I
~
800 ~ 1 I ~
8 8 I ~ ~
d 600 0
0 400 AllI+
I" owa ble I
. Re la I'Iy Oper ating I l
200 ~ iRe ion 0
Secondary Volts (120 Volts). 70 80 90 92 120 Primary Volts (480 Volts) t 240 320 368 103.5'14
=480 Percent Volts (460 Volt Base) 528 70% 80% 90% 104%
ISafeguards Bus Voltage'.3-9 PROP OSED s ~
I
Page 3 of 3 1 2 3 5 6 NO. of MIN. MIN. PERMISSIBLE OPERATOR ACTION NO. of CHANNELS OPERABLE DEGREE OF BYPASS IF CONDITIONS OF CHANNELS TO TRIP CHANNELS REDUNDANCY CONDITIONS COLUMN 3 or 5 CANNOT BE MET
- 17. Circulating Water Flood Protection
- a. Screenhouse 2 Power operation may be continued for a period of up to 7 days with 1 channel inoperable or for a period of 24 h~
with two channels in~
operable.
b.Condenser Power operation may be continued for a period of up to 7 days with 1 channel inoperable or for a period of 24 hrs.
with two channels inoperable.
- 18. Loss of Voltage/
Degraded Voltage 480 Volt Safe-guards Bus 4/bus 2/bus 2/bus Maintain hot shut-down or place bus on diesel generator.
NOTE 1: When block condition exists, maintain normal operation.
F.P. Full Power
- If both rod misalignment monitors (a and b) inoperable for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or more, the nuclear overpower trip shall be reset to 93% of rated power in addition to the in-creased surveillance noted.
If a functional unit is operating with the minimum operable channels, the number of channels to trip the reactor will be column 3 less column 4.
A channel is considered operable with 1 out of 2 logic or 2 out of 3 logic.
TABLE 4.1-1 (CONTINUED)
Channel Check Calibrate Test Remarks
- 25. Containment Pressure Narrow range containment pressure
(-3.0, +3 psig excluded)
- 26. Steam Generator Pressure
- 27. Turbine First Stage Pressure S
- 28. Emergency Plan Radiation Instruments
- 29. Environmental Monitors N.A. N.A.
- 30. Loss of Voltage/Degraded .N.A.
Voltage 480 Volt Safe-guards Bus S - Each Shift M Monthly D Daily P Prior to each startup if not done previous week B/N Biweekly R .- Each Refueling Shutdown Q Quarterly N.A. - Not applicable
Attachment B By letter dated June 3; 1977, the NRC requested that RG&E assess the susceptibility of safety related electrical equipment with regard to (1) sustained degraded voltage conditions at the offsite power sources and (2) interaction between the offsite and onsite emergency power sources.
An analysis of undervoltage protection at Ginna Station was performed and submitted to the NRC in a letter dated July 21, 1977.
This analysis reviewed the current undervoltage protection and described the basis for a modification which would reduce the Station's susceptibility to a sustained degraded voltage.
However, due to lack of specific information regarding equipment, setpoints for the additional undervoltage protection were not established at that time.
Following receipt of additional information, RG&E submitted setpoints in a letter to the NRC dated September 30, 1977. The proposed specifications are identical to those presented in the September 30 letter.
These Specifications will provide protection for a complete loss of 480 volt.bus voltage as well as for degraded voltage conditions. Both relaying systems will assure that assumptions of all safety analysis are met. Specifically, equipment will be loaded onto the diesel generators within the time assumed in the safety analyses. The undervoltage relay protection, which was identified as "second-level protection" in the June 3, 1977 NRC letter and in our two subsequent letters, will protect equipment
against a bus voltage which is greater than the loss of voltage relay setpoint but. less than the voltage guaranteed by equipment manufacturers for continuous duty for Ginna safeguards equipment.
The proposed undervoltage setpoints will provide the required protection while also assuring that, spurious trips will not occur while equipment is being sequenced onto the diesel generators.
The NRC Staff requested that the proposed system be modified to provide "coincident logic" as described in position 1, part b of their June 3, 1977 letter. Provision for "coincident, logic" does not. effect the setpoint information contained in the December 16, 1977 Application for Change to Operating License and re-submitted herewith. However, it has changed the required number of relays necessary to trip. The coincident logic scheme is described in our July 24, 1978 letter (ref. 11 to the Technical Specification Basis).
Loss of voltage and degraded voltage conditions simulated during the refueling shutdown are performed to verify both system performance and relay calibration. The safeguards 480 volt loss of voltage and degraded voltage protection systems are not part of the reactor protection system. It is not practical to simulate these conditions during plant operation to satisfy a monthly test requirement.
Based on the analyses provided in our letters of July 21, 1977, September 30, 1977, and July 24, 1978 the proposed Technical Specification will provide protection against 480 volt bus under-voltage.
As stated in our letter of July 21, 1977, we expect that, following receipt of approval of the modification design by the NRC, detailed engineering and procurement of equipment will require approximately 9 months. Installation must be performed at. a cold or refueling shutdown and would require approximately two weeks. .The effective data of a Technical Specification should be set consistent with this schedule.
Attachment C The Technical Specification change proposal revises a proposal which was filed prior to originally submitted December 22, 1977 The the effective date of 10 CPR 170.22. revision is necessary to incorporate a change in design which was requested by the NRC Staff. The design change was described in our submittal of July 24, 1978. Because it is a revision which the Staff requested and is now reviewing, and is not a new request, no fee is required.