06/09/2008 Notice of Meeting with Exelon Generation Company, LLC Regarding the Nrc'S Assessment of the Safety Performance of the Peach Bottom Atomic Power Station for Calendar Year 2007
ML080850792
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/25/2008
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
KROHN, PG
References
MN 08-015
Download: ML080850792 (5)


Text

MN No.08-015

U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING

March 25, 2008

Licensee: Exelon Generation Company, LLC

Facility: Peach Bottom Atomic Power Station, Units 2 and 3

Docket Nos.: 50-277; 50-278

Date/ Time: June 9, 2008 at 6:30 p.m.

Location: Peach Bottom Inn 6085 Delta Road Delta, PA 17314

Purpose: The NRC requested an Annual Assessment Meeting with Exelon to discuss the NRC's assessment of the safety performance of the Peach Bottom Atomic Power Station for calendar year 2007. In addition, the status of Confirmatory Action Letter (CAL) commitments, including those related to safety conscious work environment issues, will be discussed.

The NRC's assessment is documented in a letter dated March 3, 2008.

Attendees*:

NRC: M. Dapas, Deputy Regional Administrator M. Gamberoni, Director, Division of Reactor Safety P. Krohn, Chief, Division of Reactor Projects Branch 4 F. Bower, Senior Resident Inspector, Peach Bottom M. Brown, Resident Inspector, Peach Bottom

Licensee: R. DeGregorio, Senior Vice President, Mid-Atlantic Operations J. Grimes, Site Vice President, Peach Bottom M. Massaro, Plant Manager G. Stathes, Director of Operations J. Armstrong, Manager, Regulatory Assurance

Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Meeting Contact: Paul G. Krohn, Chief, Projects Branch 4 610-337-5120 E-mail: pgk1@nrc.gov

2 The NRC's assessment letter can be found in ADAMS with Accession Number: ML080630190. This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML080850792. ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html.

Previous 2007 regulatory actions regarding Peach Bottom can be located in ADAMS with Ascension Numbers ML072920283 (CAL); ML073090061 (Augmented Inspection Team);

ML073320344 (Reactor Oversight Process Deviation Memorandum); ML073550590 (Augmented Inspection Team Follow-up); and ML080440012 (Final Significance Determination).

Additional information relative to the NRC's Annual Assessment process and the safety performance of Peach Bottom Atomic Power Station can be found on the NRC's web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html . The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov, and contains information regarding visitors and security.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting.

Attendance by NRC personnel at this meeting should be made known by April 14, 2008, via telephone to the NRC meeting contact.

Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.

Approved By: ______/RA/

________ Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc w/encl: C. Crane, Executive Vice President, Exelon, Chief Operating Officer, Exelon Generation J. Grimes, Site Vice President, Peach Bottom M. Pacilio, Chief Operating Officer, Exelon R. DeGregorio, Senior Vice President, Mid-Atlantic R. Hovey, Senior Vice President, Nuclear Oversight M. Massaro, Plant Manager, Peach Bottom G. Stathes, Director of Operations J. Armstrong, Regulatory Assurance Manager, Peach Bottom J. Bardurski, Manager, Financial Control & Co-Owner Affairs P. Cowan, Director, Licensing and Regulatory Affairs Manager Licensing, PBAPS Director, Training Correspondence Control Desk D. Allard, Bureau of Radiation Protection, Department of Environmental Protection R. McLean, Power Plant and Environmental Review Division (MD) 3 S. Pattison, Asst. Secretary, MD Department of the Environment A. Lauland, Director, Director, Homeland Security Advisor T. Snyder, MD Department of the Environment Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. O'Connor, Harford County Council Administrator R. Ayers, Deputy Manager, Harford County Div of Emergency Operations E. Crist, Harford County Emergency Operations R. Brooks, Cecil County Dept. of Emergency Services Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance E. Epstein, TMI - Alert J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams R. Fletcher, Department of Environment, Radiological Health Program J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency D. Lockbaum, Union of Concerned Scientists

4

Agenda NRC's Annual Assessment Meeting Peach Bottom Atomic Power Station June 9, 2008

Introduction

.......................................................................................................NRC (3 minutes)

Review of Reactor Oversight Process................................................................NRC (5 minutes)

National Summary of Plant Performance............................................................NRC (7 minutes)

Discussion of Peach Bottom Performance........................................................NRC (30 minutes) (including status of CAL commitments and SCWE issues)

Exelon's Response and Remarks..................................................................Exelon (30 minutes) (including status of CAL commitments and SCWE issues)

Closing Remarks

..............................................................................................NRC (10 minutes)

Short Break................................................................................................................(5 minutes)

NRC to address public questions ..................................NRC/Members of the Public (as needed)

ML080850792

DOCUMENT NAME: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP-7 EOC\2007 AAM Meeting Notices\PB 2007 AAM Meeting Notice Rev0.doc

SUNSI Review Complete: PGK (Reviewer's Initials) After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box:

" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure

" N" = No copy OFFICE RI/DRP RI/DRP NAME FBower/FB PKrohn/PGK DATE 03/25 /08 03/25/08